RESEARCH ON TBM CONSTRUCTION TECHNIQUES FOR SOUTH MAIN OF YRDP
LIU Huaiguo1 zhang Jing2 Zhang Yuelin2
(1 Shanxi Yellow River Diversion Project Burea,Taiyuan, 030012) (2 Tinjin Investigation,Design and research Institute of water resources, Minidistry of water resources, Tianjin,300222)
Abstract:TBM is commonly used for deep buried and long tunnels and become prevails for tunnel excavation in international practices. The total length of No.4~7 tunnels in south main of Shanxi Yellow River Diversion Project(YRDP) is 90Km. The tunnel is excavated by TBM except some soil entranceways. The longest tunnel is about 43Km and hydrological geology of the tunnel is quite complex. According to practical experiences, this paper will discuss some construction countermeasures for TBM constructions in bad geological sites in engineering.