Abstract:Based on ground temperature record of one year at Beiluhe section of Qinghai-Tibet Railway,where field testing embankment was constructed,the engineering effect of duct-ventilation embankment is discussed. Testing results indicate that duct-ventilation embankment is available to protect the underlying permafrost and can even extend it. It is also shown that it is better to apply large-diameter ducts and to bury ducts near the initial ground surface,so that the engineering effect of ventilation embankment can be enhanced.
1JohnsonG H. Permafrost Engineering Design and Construction[M]. Albesta,Canada:Henter Rose Company,1981,346~349,251~255
2Nixon J F. Geothermal aspects of ventilated pad design[A]. In:Proceedings of the 3rd Int. Conf. on Permafrost Edmonton[C]. Alberta,Canada:[s. n. ],1978,841~846
3崔托维奇 H A. 冻土力学[M]. 张长庆,朱元林译.北京:科学出版社,1985,6~8
4Odom William B. Practical application of under slab ventilation system[A]. In:Prudhoe Bay Case Study of Permafrost[C]. Washington,D. C.:National Academy Press,1983,940~944
5John P,ZarlingP E,Billy Connor,et al. Goering air duct systems for stabilization over permafrost area[A]. In:Proceeding of the 4th Int. Conf. on Permafrost[C]. Fairbanks:[s. n. ],1983,1 463~1 468