Abstract:Compared to the normal road or railway tunnels,metro passed through the stratum over the road,so that the metro advanced prediction(mainly geophysical class prediction) implementation can be divided into two parts:prediction inside and outside the tunnel. However,due to shallow depth of the metro and many factors of interference,it?s need to use the comprehensive advanced prediction. By analyzing the metro characters under the karst geological conditions,using the advantages of ground penetrating radar(GPR) and resistivity tomography,a comprehensive prediction method is proposed to carry out GPR forecasts inside and carry out the forecasts of the combination of resistivity tomography and GPR method outside;then through an engineering application,a detailed analysis of the implementation of comprehensive and comprehensive forecasting methods is made to prove that the comprehensive prediction method is effective for metro advanced prediction under the conditions of karst geology.
李术才,李树忱,张庆松,等. 岩溶裂隙水与不良地质情况超前预报研究[J]. 岩石力学与工程学报,2007,26(2):217-225.(LI Shucai,LI Shuchen,ZHANG Qingsong,et al. Forecast of karst fractured groundwater and defective geological conditions[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(2):217-225.(in Chinese))
[2]
李术才,薛翊国,张庆松,等. 高风险岩溶地区隧道施工地质灾害综合预报预警关键技术研究[J]. 岩石力学与工程学报,2008,27(7):1 297-1 307.(LI Shucai,XUE Yiguo,ZHANG Qingsong,et al. Key technology study on comprehensive prediction andearly- warning of geological hazards during tunnel construction in high-risk karst areas[J].Chinese Journal of Rock Mechanics and Engineering,2008,27(7):1 297-1 307.(in Chinese))
Your browse does not support frame!