TEST ON HARD AND STABLE ROOF CONTROL BY MEANS OF DIRECTIONAL HYDRAULIC FRACTURING IN COAL MINE
FENG Yanjun1,2,KANG Hongpu1,2
(1. Mining and Designing Department,Tiandi Science and Technology Co.,Ltd.,Beijing 100013,China;
2. Coal Mining and Design Branch,China Coal Research Institute,Beijing 100013,China)
Abstract:In view of the research situation and existing problems involved with the hard and stable roof control in coal mine,the test of directional hydraulic fracturing employed for the roof control is presented;the characteristics of hydraulic fracturing in the roof are obtained via the monitoring boreholes decorated on both sides of the fracturing borehole and the pressure record during hydraulic fracturing. The test results show that:(1) The transverse notch is introduced successfully in the roof by means of KZ54 drill and is capable of reducing the pressure required for crack breakdown during the directional hydraulic fracturing. (2) The inflatable straddle packer adopted for hole sealing ensures the stepwise fracturing in the hard strata,the stepwise fracturing can create multiple cracks in the roof,which ultimately weakens the hard strata. (3) The breakdown pressure and propagation pressure change in proportion to the depth of fracturing location;the crack can propagate to a large scope radius of 20 m approximately. (4) The pressure versus time curve is recorded and presents a variety of forms potentially related to the rock uniformity,permeability,geostress field and rock structure surface. (5) The rock strength is the main factor that controls the fracturing process when the values of geostress and rock tensile strength are nearly identical.
冯彦军1,2,康红普1,2. 定向水力压裂控制煤矿坚硬难垮顶板试验[J]. 岩石力学与工程学报, 2012, 31(6): 1148-1155.
FENG Yanjun1,2,KANG Hongpu1,2. TEST ON HARD AND STABLE ROOF CONTROL BY MEANS OF DIRECTIONAL HYDRAULIC FRACTURING IN COAL MINE. , 2012, 31(6): 1148-1155.
陈炎光,钱鸣高. 中国煤矿采场围岩控制[M]. 徐州:中国矿业大学出版社,1994:137-143.(CHEN Yanguang,QIAN Minggao. Strata control around coal face in China[M]. Xuzhou:China University of Mining and Technology Press,1994:137-143.(in Chinese))
Your browse does not support frame! " target="_blank">
[3]
靳钟铭,徐林生. 煤矿坚硬顶板控制[M]. 北京:煤炭工业出版社,1994:80-139.(JIN Zhongming,XU Linsheng. Hard roof management in coal mine[M]. Beijing:China Coal Industry Publishing House,1994:80-139.(in Chinese))
Your browse does not support frame! " target="_blank">
[5]
王金安,李大钟,尚新春. 采空区坚硬顶板流变破断力学分析[J]. 北京科技大学学报,2011,33(2):142-148.(WANG Jin?an,LI Dazhong,SHANG Xinchun. Mechanics analysis of creep fracture of strong roof strata above mined-out area[J]. Journal of University of Science and Technology Beijing,2011,33(2):142-148.(in Chinese))
Your browse does not support frame! " target="_blank">
[7]
谭云亮,何孔翔,马植胜,等. 坚硬顶板冒落的离层遥测预报系统研究[J]. 岩石力学与工程学报,2006,25(8):1 705-1 709.(TANG Yunliang,HE Kongxiang,MA Zhisheng,et al. Researches on remote monitoring and forecasting system for hard roof fall[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(8):1 705-1 709. (in Chinese))
Your browse does not support frame! " target="_blank">
[8]
MATSUI K,SHIMADA H,ANWAR H Z. Acceleration of massive roof caving in a long wall gob using a hydraulic fracturing[C]// Proceedings of the 99th International Symposium on Mining Science and Technology. Beijing:[s.n.],1999:43-46.
Your browse does not support frame! " target="_blank">
[10]
邓广哲,王世斌,黄炳香. 煤岩水压裂缝扩展行为特性研究[J]. 岩石力学与工程学报,2004,23(20):3 489-3 493.(DENG Guangzhe,WANG Shibing,HUANG Bingxiang. Research on behavior character of crack development induced by hydraulic fracturing in coal- rockmass[J]. Chinese Journal of Rock Mechanics and Engineering,2004,23(20):3 489-3 493.(in Chinese))
Your browse does not support frame! " target="_blank">
[14]
JOON-SHIK M. Representativeness of jointed rock mass hydraulic conductivity obtained from packer tests for tunnel inflow rate estimate[J]. International Journal of Rock Mechanics and Mining Sciences,2011,48(5):836-844.
[4]
史元伟,宁 宇,魏景云. 采煤工作面围岩控制原理和技术(下)[M]. 徐州:中国矿业大学出版社,2003:29-110.(SHI Yuanwei,NING Yu,WEI Jingyun. Coal face surrounding rock control principle and technology(volume II)[M]. Xuzhou:China University of Mining and Technology Press,2003:29-110.(in Chinese))
Your browse does not support frame! " target="_blank">
[11]
黄炳香,程庆迎,刘长友,等. 煤岩体水力致裂理论及其工艺技术框架[J]. 采矿与安全工程学报,2011,28(2):167-173.(HUANG Bingxiang,CHENG Qingying,LIU Changyou,et al. Hydraulic fracturing theory of coal-rock mass and its technical framework[J]. Journal of Mining and Safety Engineering,2011,28(2):167-173.(in Chinese))
Your browse does not support frame! " target="_blank">
潘 岳,王志强,李爱武. 初次断裂期间超前工作面坚硬顶板挠度、弯矩和能量变化的解析解[J]. 岩石力学与工程学报,2012,31(1):32-41.(PAN Yue,WANG Zhiqiang,LI Aiwu. Analytic solutions of deflection,bending moment and energy change of tight roof advanced working surface during initial fracturing[J]. Chinese Journal of Rock Mechanics and Engineering,2012,31(1):32-41.(in Chinese))
[9]
闫少宏,宁 宇,康立军,等. 用水力压裂处理坚硬顶板的机制及实验研究[J]. 煤炭学报,2000,25(1):32-35.(YAN Shaohong,NING Yu,KANG Lijun,et al. The mechanism of hydro breakage to control hard roof and its test study[J]. Journal of China Coal Society,2000,25(1):32-35.(in Chinese))
Your browse does not support frame! " target="_blank">
[13]
HAIMSON B C,CORNET F H. ISRM suggested methods for rock stress estimation—part 3:hydraulic fracturing(HF) and/or hydraulic testing of pre-existing fractures(HTPF)[J]. International Journal of Rock Mechanics and Mining Sciences,2003,40(7/8):1 011-1 020.
Your browse does not support frame! " target="_blank">
[12]
黄炳香. 煤岩体水力致裂弱化的理论与应用研究[博士学位论文][D]. 徐州:中国矿业大学,2009.(HUANG Bingxiang. Research on theory and application of hydraulic fracture weakening for coal-rock mass[Ph. D. Thesis][D]. Xuzhou:China University of Mining and Technology,2009.(in Chinese))
Your browse does not support frame! " target="_blank">
[15]
GUO F,MORGENSTERN N R,SCOTT J D. An experimental investigation into hydraulic fracture propagation—part 1:experimental facilities[J]. International Journal of Rock Mechanics and Mining Sciences and Geomechanics Abstracts,1993,30(3):177-188.
Your browse does not support frame! " target="_blank">