RESEARCH ON STABILITY OF FAULT f5 REPLACEMENT TUNNEL
AND ITS INTERSECTION TUNNEL AND DESIGN OF SUPPORTING STRUCTURE IN JINPING I HYDROPOWER STATION
QU Xing1,LI Ning1,ZHOU Zhong2,SUN Hongchao3
(1. Institute of Geotechnical Engineering,Xi?an University of Technology,Xi?an,Shaanxi 710048,China;2. Hydrochina Chengdu Engineering Corporation,Chengdu,Sichuan 610072,China;3. Dongfang Electric Corporation,Chengdu,Sichuan 611731,China)
Abstract:f5 Fault is the largest fault in the dam area of Jinping I hydropower station。In order to improve the quality of rock mass of dam abutment,adits f5–1,f5–2 and 4 inclined shaft were used to replace the fault f5. Based on the extensive research,the necessity of replacement grid setting was discussed. 3D finite element method was employed to simulate natural topography and geological conditions and excavation. The stability of replacement grid was evaluated by stress and deformation,and compared with measured data. The results show that the adits f5–1and f5–2 meet the stability requirement of the construction period,but supporting force in local tunnel is insufficient. For adit f5–2,two kinds of reinforced measures,prestressed anchor bolt,steel arch centering,thick shotcret and lining in advance,were adopted,these measures can makes the adit to meet stability requirements. Taking the other factors into consideration,it is believed that lining in advance is more reasonable. For cross parts of adit and inclined shaft,inclined shaft were excavated after lining before and after 10 m of cross parts of adit were completed,the maximum compressive stress of lining is less than 6.5 MPa and the maximum tensile stress is less than 1.7 MPa. For cross parts of adit f5–1 and force transmission tunnel # 5,first proposed in # 5 tunnel applied lining,then consolidation grouting on the thinner rock pillar,last for the construction of the adit. The numerical analysis results provide a scientific basis for the design of lining in replacement tunnel,and has guiding meaning to the other similar projects.
曲 星1,李 宁1,周 钟2,孙宏超3. 锦屏一级水电站f5断层置换硐及其交叉硐段稳定性及支护结构设计研究[J]. 岩石力学与工程学报, 2012, 31(s2): 3571-3578.
QU Xing1,LI Ning1,ZHOU Zhong2,SUN Hongchao3. RESEARCH ON STABILITY OF FAULT f5 REPLACEMENT TUNNEL
AND ITS INTERSECTION TUNNEL AND DESIGN OF SUPPORTING STRUCTURE IN JINPING I HYDROPOWER STATION. , 2012, 31(s2): 3571-3578.
[1] 蒋锁红. 混凝土拱坝基础处理工程技术[M]. 北京:科学出版社,2005:120,211.(JIANG Suohong. Concrete arch dam foundation treatment engineering[M]. Beijing:Science Press,2005:120,211.(in Chinese))
[2] 康红普,林 健,杨景贺,等. 松软破碎硐室群围岩应力分布及综合加固技术[J]. 岩土工程学报,2011,33(5):808–814.(KANG Hongpu,LIN Jian,YANG Jinghe,et al. Stress distribution and synthetic reinforcing technology for chamber group with soft and fractured surrounding rock[J]. Chinese Journal of Geotechnical Engineering,2011,33(5):808–814.(in Chinese))
[3] 徐 彬,闫 娜,李 宁. 软弱夹层对交叉硐稳定性的影响分析[J]. 地下空间与工程学报,2009,5(5):946–951.(XU Bin,YAN Na,LI Ning. Numerical study on the influence of weak intercalation to excavating intersecting tunnel[J]. Chinese Journal of Underground Space and Engineering,2009,5(5):946–951.(in Chinese))
[4] 张西前,万良勇,李 宁. 双硐交叉的施工稳定性分析及支护设计[J]. 岩石力学与工程学报,2002,21(11):1 627–1 632.(ZHANG Xiqian,WAN Liangyong,LI Ning. Stability analysis and design considerations for the intersection opening of two tunnels[J]. Chinese Journal of Rock Mechanics and Engineering,2002,21(11):1 627–1 632.(in Chinese))
[5] 张延新,蔡美峰,乔 兰,等. 高速公路隧道开挖与支护力学行为研究[J]. 岩石力学与工程学报,2006,25(6):1 284–1 289.(ZHANG Yanxin,CAI Meifeng,QIAO Lan,et al. Study on mechanical response to excavation and support of expressway tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(6):1 284–1 289.(in Chinese))
[6] 金 路,姜谙男,赵 文,等. 革镇堡隧道破碎段动态施工的三维数值模拟[J]. 岩土力学,2008,29(增1):272–276.(JIN Lu,JIANG Annan,ZHAO Wen,et al. 3D numerical simulation of dynamic construction of Gezhenpu tunnel with cataclastic section[J]. Rock and Soil Mechanics,2008,29(Supp.1):272–276.(in Chinese))
[7] 余伟健,高 谦,张周平,等. 深埋大跨度软岩硐室让压支护设计研究[J]. 岩土工程学报,2009,31(1):40–47.(YU Weijian,GAO Qian,ZHANG Zhouping,et al. Yield supporting design for deep and large-span soft rock caverns[J]. Chinese Journal of Geotechnical Engineering,2009,31(1):40–47.(in Chinese))
[8] 李大伟,侯朝炯. 低强度软岩巷道大变形围岩稳定控制试验研究[J]. 煤炭科学技术,2006,34(3):36–39.(LI Dawei,HOU Chaojiong. Experiment and research on stabilization control of high deformed surrounding rock in mine low strength soft rock roadway[J]. Coal Science and Technology,2006,34(3):36–39.(in Chinese))
[9] 李 宁. 锦屏高拱坝整体稳定性研究[硕士学位论文][D]. 武汉:长江科学院,2008.(LI Ning. Study on Global Stability of JinPing high arch dam[M. S. Thesis][D]. Wuhan:Yangtze River Scientific Research Institute,2008.(in Chinese))
[10] 林正伟. 锦屏一级高拱坝三维渗流场及坝肩稳定性研究[硕士学位论文][D]. 成都:四川大学,2003.(LIN Zhengwei. Study on three- dimension Seepage and abutment stability of Jinping high arch dam[M. S. Thesis][D]. Chengdu:Sichuan University,2003.(in Chinese))
[11] 中国水电工程顾问集团成都勘测设计研究院. 雅砻江锦屏一级水电站拱坝左岸基础处理招标设计报告[R]. 成都:中国水电工程顾问集团成都勘测设计研究院,2006.(HydroChina Chengdu Engineering Corporation. Design report of foundation treatment of left bank on Jinping first stage hydropower station[R]. Chengdu:HydroChina Chengdu Engineering Corporation,2006.(in Chinese))
[12] 国家电力公司成都勘测设计研究院. 雅砻江锦屏一级水电站可行性研究报告[R]. 成都:国家电力公司成都勘测设计研究院,2003. (Chengdu Hydroelectric Investigation and Design Institute,State Power Corporation of China. Feasibility research report on Jinping first stage hydropower station[R]. Chengdu:Chengdu Hydroelectric Investigation and Design Institute,State Power Corporation of China,2003.(in Chinese))
[13] 何泽山,刘墅辉. 水电站高拱坝软弱破碎带地层的置换加固技术[J]. 隧道建设,2009,29(2):216–221.(HE Zeshan,LIU Shuhui. Replacement and excavation of high arch dam in weak fractured zone[J]. Tunnel Construction,2009,29(2):216–221.(in Chinese))
[14] 李 宁,张 鹏,于 冲. 边坡预应力锚索加固的数值模拟方法研究[J]. 岩石力学与工程学报,2007,26(2):254–261.(LI Ning,ZHANG Peng,YU Chong. Research on method of numerical simulation of prestressed anchor cable in slope[J]. Chinese Journal of Rock mechanics Engineering,2007,26(2):254–261.(in Chinese))