Abstract:The settlement control of adjacent building is a critical issue in foundation pit construction. The impacts of the construction of both three-axis high-pressure rotary jet grouting piles and diaphragm wall on a historical building in a subway station of Tianjin were analyzed based on the real time monitoring data,focusing on the effect of trench construction of diaphragm wall on the adjacent building settlement. The settlements in the retaining structure construction phase,the foundation pit excavation phase and the whole construction period were compared,to explore the impacts of three-axis high-pressure rotary jet grouting piles retaining structure and diaphragm wall on the building settlement. The reasons for building settlement caused by different retaining structure forms were emphatically analyzed and settlement control methods were proposed for building protection. The results obtained could provide reference to similar projects.
刘凤洲1,谢雄耀2. 地铁基坑围护结构成槽施工对邻近建筑物沉降影响及监测数据分析[J]. 岩石力学与工程学报, 2014, 33(sl): 2901-2907.
LIU Fengzhou1,XIE Xiongyao2. EFFECT OF TRENCH CONSTRUCTION OF RETAINING STRUCTURE IN METRO FOUNDATION PIT ON ADJACENT BUILDING SETTLEMENT AND MONITORING DATA ANALYSIS. , 2014, 33(sl): 2901-2907.
TAMANO T,NGUYEN H Q,KANAOKA M,et al. Deformation and failure of slurry trench in reclaimed soft clay:numerical analysis[C]// Proceedings of the 12th Asian Regional Conference on Soil Mechanics and Geotechnical Engineering. Singapore:World Scientific Publishing,2003:825-828.
Your browse does not support frame!