Abstract:In order to solve the problem of sustained large deformation of mudstone tunnel surrounding rock after construction,the geological conditions revealed by tunnel excavation and measured deformation law are combined,as well as the corresponding numerical experiments. Result shows that some impermeable layers exist in the tunnel surrounding rocks and subsequent excavation led to destruction of surrounding rock impermeable layer. Then the groundwater flows to dry zone and softens the surrounding rocks of original dry zone gradually,which result in re-deformation of stabilized surrounding rock and damage of supporting structures. Through the comprehensively comparative analysis of treatment measures in numerical experiments and field tests,the measure of platoon and guide is more reasonable,economical and effective.
赵旭峰,王春苗,孔祥利. 深部软岩隧洞施工性态时空效应分析[J].岩石力学与工程学报,2007,26(2):404-409.(ZHAO Xufeng,WANG Chunmiao,KONG Xiangli. Analysis of time-space effects of construction behavior of deep soft rock tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(2):404-409.(in Chinese))
[2]
孙元春,尚彦军. 岩石隧洞围岩变形时空效应分析[J]. 工程地质学报,2008,16(2):211-215.(SUN Yuanchun,SHANG Yanjun. Integrated analysis of the tempo-spatial effect of surrounding rock deformation in tunneling[J]. Journal of Engineering Geology,2008,16(2):211-215. (in Chinese))
[3]
张青龙,李 宁,曲 星,等. 富水软岩隧洞变形特征及变形机制分析[J]. 岩石力学与工程学报,2011,30(11):2 196-2 202.(ZHANG Qinglong,LI Ning,QU Xing,et al. Analysis of deformation characteristics and mechanism of water-rich soft rock tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(11):2 196-2 202.(in Chinese))
Your browse does not support frame!