(1. State Key Laboratory Cultivation Base for Gas Geology and Gas Control,Henan Polytechnic University,Jiaozuo,Henan 454000,China;2. Opening Project of Key Laboratory of Deep Mine Construction,Henan Polytechnic University,Jiaozuo,Henan 454000,China;3. School of Safety Science and Engineering,Henan Polytechnic University,Jiaozuo,Henan 454000,China)
Abstract:In order to accurately detect the height of water flowing fractured zone in overlying roof strata after the mining face has been mined and ensure that mining underwater is safe and reliable,empirical formula calculation,downhole plugging drilling section water injection(put) crack measurement system and drilling television detecting system are used to detect the development of water flowing fractured zone. Results show that,using the above three methods respectively,the heights of water flowing fractured zone,which are 25.24–36.50,26.83–28.33 and 25.50–29.20 m,are obtained. The results verify that using downhole plugging drilling section water injection(put) crack measurement system to detect the height of water flowing fractured zone is reasonable and reliable,and it not only provides a theoretical support for Sitai coal mining underwater,but also provides reference for other coals to detect water flowing fractured zone.
高保彬1,2,3,刘云鹏1,3,潘家宇1,3,袁 恬1,3. 水体下采煤中导水裂隙带高度的探测与分析[J]. 岩石力学与工程学报, 2014, 33(sl): 3384-3390.
GAO Baobin1,2,3,LIU Yunpeng1,3,PAN Jiayu 1,3,YUAN Tian1,3. DETECTION AND ANALYSIS OF HEIGHT OF WATER FLOWING FRACTURED ZONE IN UNDERWATER MINING. , 2014, 33(sl): 3384-3390.
钱鸣高,刘听成. 矿山压力及其控制[M]. 北京:煤炭工业出版社,1991:240-243.(QIAN Minggao,LIU Tingcheng. Mining pressure and strata control[M]. China Coal Industry Publishing House,1991:240-243.(in Chinese))
Your browse does not support frame!