Abstract:In order to find a reasonable quantitative criteria to judge the stability of interlayer separation of complex roof in tunnels,the different stresses of structure surfaces and the distribution of interlayers to be separated were simulated and analyzed with ANSYS program to a total of 5×5 sets of orthogonal models considering 5 factors including the rock properties of the complex roof,the tunnel width,the rock thickness of complex roof,the cohesions and the internal friction angles of structure planes. The distribution of the interlayers to be separated was validated by engineering practice,and the mechanism of instability of the structural plane separation was analyzed. Using the separation range caused by the tensile stress in the middle of the structure plane to judge the stability was found to be more reasonable than using the interlayer separation size in the center of complex roof,and the threshold value of the separation range was 0.50–0.75 times of the tunnel width.
吴德义,闻广坤,王爱兰. 深部开采复合顶板离层稳定性判别[J].采矿与安全工程学报,2011,28(2):252-257.(WU Deyi,WEN Guangkun,WANG Ailan. Discrimination of stability between layers of compound roof in deep mining[J]. Journal of Mining and Safety Engineering,2011,28(2):252-257.(in Chinese))
[3]
黄 超,章烈敏. 一起典型煤锚巷道冒顶的调查[J]. 矿山压力与顶板管理,2004,21(4):88-89.(HUANG Chao,ZHANG Liemin. A typical roof collapse of bolting coal entry[J]. Ground Pressure and Strata Control,2004,21(4):88-89.(in Chinese))
[4]
杨建辉,杨万斌,郭延华. 煤巷层状顶板压曲破坏现象分析[J]. 煤炭学报,2001,26(3):240-244.(YANG Jianhui,YANG Wanbin,GUO Yanhua. Study on the layered roof compression-bending failure of roadways in coal seam[J]. Journal of China Coal Society,2001,26(3):240-244.(in Chinese))
[8]
吴德义,高 航,王爱兰. 巷道复合顶板离层的影响因素敏感性分析[J]. 采矿与安全工程学报,2012,29(2):255-260.(WU Deyi,GAO Hang,WANG Ailan. Sensitivity analysis of influence factors on interlayer separation of complex roof[J]. Journal of Mining and Safety Engineering,2012,29(2):255-260.(in Chinese))
[11]
张百胜,康立勋,杨双锁. 大断面全煤巷道层状顶板离层变形模拟研究[J]. 采矿与安全工程学报,2006,23(3):264-267.(ZHANG Baisheng,KANG Lixun,YANG Shuangsuo. Numerical simulation on roof separation and deformation of full seam roadway with stratified roof and large section[J]. Journal of Mining and Safety Engineering,2006,23(3):264-267.(in Chinese))
[2]
贺永年,韩立军,邵 鹏,等. 深部巷道稳定的若干岩石力学问题[J]. 中国矿业大学学报,2006,35(3):288-295.(HE Yongnian,HAN Lijun,SHAO Peng,et al. Some problems of rock mechanics for roadways stability in depth[J]. Journal of China University of Mining and Technology,2006,35(3):288-295.(in Chinese))
[5]
贾剑青,王宏图,李晓红,等. 深埋隧道软硬交替复合顶板岩体变形破坏分析[J]. 岩土力学,2005,26(6):937-940.(JIA Jianqing WANG Hongtu,LI Xiaohong,et al. Analysis of deformation-failure for soft and hard multilayer roof of deeply buried tunnel[J]. Rock and Soil Mechanics,2005,26(6):937-940.(in Chinese))
[6]
谭小宁,王连国,秦 昊. 平顶巷道锚杆支护机制的数值模拟[J]. 矿业工程,2005,3(3):12-15.(TAN Xiaoning,WANG Lianguo,QIN Hao. Simulation of mechanism of anchor support in flat roof roadway[J]. Mining Engineering,2005,3(3):12-15.(in Chinese))
Your browse does not support frame! " target="_blank">
[7]
鞠文君,刘东才. 锚杆支护巷道顶板离层界限确定方法[J]. 煤炭科学技术,2001,29(4):27-29.(JU Wenjun,LIU Dongcai. Determination method for separating layer limit of mine roadway roof supported with roof bolts[J]. Coal Science and Technology,2001,29(4):27-29.(in Chinese))
林崇德. 层状岩石顶板破坏机制数值模拟过程分析[J]. 岩石力学与工程学报,1999,18(4):392-396.(LIN Chongde. Procedure analysis of numerical simulation for the failure mechanism of laminate roof[J]. Chinese Journal of Rock Mechanics and Engineering,1999,18(4):392-396.(in Chinese))