(1. School of Civil and Resources Engineering,University of Science and Technology Beijing,Beijing 100083,China;2. State Key Laboratory of High-efficient Mining and Safety of Metal Mines,Ministry of Education,University of Science and Technology Beijing,Beijing 100083,China;3. Jining No.3 Coal Mine,Yanzhou Mining Group,Jining,Shandong 272069,China;
4. Gaozhuang Coal Industry Co.,Ltd.,Zaozhuang Mining Group,Jining,Shandong 277605,China)
Abstract:This study investigated the compatible deformation model and the stability of the system of super-thick strata and coal pillars based on the recoverability safety of a longwall panel with large coal pillars under super-thick strata in Gaozhuang mine in Jining,Shandong province,China. The coal pillar was found to be able to isolate the gob and support the super thick strata and the overburden structure. The compatible deformation model for super-thick strata and coal pillars was established on the basis of the flexural deflection of super-thick strata and the vertical compressive deformation of coal pillars. The stress source,form as well as the entire compatible deformation mechanism of the vertical deformation of coal pillars were analyzed. The stress-strain relation of the compatible deformation for the system was deduced. The mode and criterion of system instability and its impact on dynamic disasters under mines were discussed. The disaster prevention and control techniques were proposed. The research results were applied to analyze the system stability of 3up1102 Longwall Panel before mining,and the disasters were forecasted. The rationality of the research was initially verified according to the micro-seismic monitoring results and the dynamic stress conditions at the recoverability stage. The purpose of quake without disasters has achieved through implementing the targeted preventive measures.
张 明1,2,姜福兴1,2,李克庆1,2,王存文1,2,吴修光3,高化军4,姬生华4. 巨厚岩层–煤柱系统协调变形及其稳定性研究[J]. 岩石力学与工程学报, 2017, 36(2): 326-334.
ZHANG Ming1,2,JIANG Fuxing1,2,LI Keqing1,2,WANG Cunwen1,2,WU Xiuguang3,GAO Huajun4,JI Shenghua4. Study of the compatible deformation and stability of the system of super thick strata and coal pillars. , 2017, 36(2): 326-334.
翟会超,闫满志. 壁式削壁充填法采场顶板临界跨度计算[J]. 岩土力学,2013,34(增2):337-339.(ZHAI Huichao,YAN Manzhi. Critical span calculation of stope roof with waste-lifting stoping method[J]. Rock and Soil Mechanics,2013,34(Supp.2):337-339.(in Chinese))
[15]
LUO X,HATHERLY P. Application of microseismic monitoring to characterise geomechnic conditions in longwall mining[J]. Exploration Geophysics,1998,(29):489-493.
Your browse does not support frame!