Abstract:The slope located at the exit of left tail water tunnel of Wudongde hydropower station is a typical bedding slope with a high dip angle,and the deformation occurred in two stages during the excavation. The influences of the slope structure,the excavation at slope toe,the engineering blasting,the fault and the unloading on the slope deformation were studied with the field monitoring and the numerical simulation. The results show that the main reason of deformation is the cutting excavation at slope toe. In addition,the excavation of a tunnel with large cross section at slope toe and the excessive blasting increase the deformation. The small fault in the slope also affects the slope deformation to some extent. Therefore,it was suggested that excavation should be carried out after the slope supporting at the intersection region of tunnel and slope.
王吉亮,杨 静,郝文忠,黄孝泉,白 伟,张 熊,魏雨军,宋 涛,曾 立. 乌东德水电站左岸尾水出口陡倾顺向坡变形影响因素分析[J]. 岩石力学与工程学报, 2017, 36(9): 2194-2204.
WANG Jiliang,YANG Jing,HAO Wenzhong,HUANG Xiaoquan,BAI Wei,ZHANG Xiong,WEI Yujun,SONG Tao,ZENG Li. Factors influencing deformation of steep consequent slopes at the tail water outlet on the left bank of Wudongde hydropower station #br#. , 2017, 36(9): 2194-2204.
龚 涛. 顺层岩质边坡稳定性研究[硕士学位论文][D]. 西安:西安理工大学,2009. (GONG Tao. Stability study of rock slopes with bedding planes[M. S. Thesis][D]. Xi?an:Xi?an University of Technology,2009.(in Chinese))
Your browse does not support frame!