(1. China JIKAN Research Institute of Engineering Investigations and Design,Co.,Ltd.,Xi?an,Shaanxi 710043,China;2. Shaanxi Key Laboratory for the Property and Treatment of Special Soil and Rock,Xi?an,Shaanxi 710043,China;3.“Sanqin Scholar”Post Research and Innovation Team,Xi?an,Shaanxi 710043,China;4. School of Human Settlements and Civil Engineering,Xi?an Jiaotong University,Xi?an,Shaanxi 710049,China;5. Key Laboratory of Geotechnical Mechanics and Engineering of
Ministry of Water Resources,Changjiang River Scientific Research Institute,Wuhan,Hubei 430010,China)
Abstract:Centrifuge model tests were performed to investigate the settlement of high loess-filled foundations in a valley during construction stage and in post-construction stage,and the influence factors on the settlement were discussed. Results illustrate that the settlement of the high loess-filled foundation is significantly affected by some factors such as the filling rate,filling height,valley shape,degree of compaction and time,and mainly occurs in the construction stage with a small proportion in the post-construction stage. The settlement in the post-construction stage increases linearly with the filling height and logarithmically with the time,while the post-construction settlement rate decreases exponentially with the time. Compared to the filled foundation in a U-shaped valley,the deformation of the loess-filled foundation in a narrow valley is evidently confined and as a result,the settlement is smaller and the time required to reach the stable state is shorter. A high compaction degree,a slow construction rate or a small filling height can reduce the settlement. Furthermore,the improvement of the compaction degree will be more significant for the settlement control of a thick filling body,the change of the construction rate directly affects the settlement of filled foundations in the construction stage,and there is a relatively stable positive correlation between the long-term post-construction settlement and the filling height.
[1] 徐 明,宋二祥. 高填方长期工后沉降研究的综述[J]. 清华大学学报:自然科学版,2009,49(6):786–789.(XU Ming,SONG Erxiang. Review of long-term settling of high fills[J]. Journal of Tsinghua University:Science and Technology,2009,49(6):786–789.(in Chinese))
[2] 朱才辉,李 宁,刘明振,等. 吕梁机场黄土高填方地基工后沉降时空规律分析[J]. 岩土工程报,2013,35(2):293–301.(ZHU Caihui,LI Ning,LIU Mingzhen,et al. Spatiotemporal laws of post-construction settlement of loess-filled foundation of Lüliang Airport[J]. Chinese Journal of Geotechnical Engineering,2013,35(2):293–301.(in Chinese))
[3] 何兆益,周虎鑫. 高填方路堤填筑体沉降的三维有限元分析[J]. 重庆交通学院学报,2000,19(3):58–62.(HE Zhaoyi,ZHOU Huxin. 3D finite element analysis of subsidence on high embankment[J]. Journal of Chongqing Jiaotong Institute,2000,19(3):58–62.(in Chinese))
[4] 李秀珍,许 强,孔纪名,等. 九寨黄龙机场高填方地基沉降的数值模拟分析[J]. 岩石力学与工程学报,2005,24(12):2 188–2 193. (LI Xiuzhen,XU Qiang,KONG Jiming,et al. Numerical modeling analysis of settlements of high fill foundation for Jiuzhai—Huanglong Airport[J]. Chinese Journal of Rock Mechanics and Engineering,2005,24(12):2 188–2 193.(in Chinese))
[5] 吴 俊,陈开圣,龙万学. 高填方路基沉降变形有限元数值模拟[J]. 公路工程,2009,34(2):27–29.(WU Jun,CHEN Kaisheng,LONG Wanxue. Numerical simulation in finite element of the sedimentation of high filled roadbed[J]. Highway Engineering,2009,34(2):27–29.(in Chinese))
[6] 宋二祥,曹光栩. 山区高填方地基蠕变沉降特性及简化计算方法探讨[J]. 岩土力学,2012,33(6):1 712–1 718.(SONG Erxiang,CAO Guangxu. Characteristics and simplified calculation method of creep settlement of high fill foundation in mountain area[J]. Rock and Soil Mechanics,2012,33(6):1 712–1 718.(in Chinese))
[7] 黄雪峰,孔 洋,李旭东,等. 压实黄土变形特性研究与应用[J].岩土力学,2014,35(2):37–44.(HUANG Xuefeng,KONG Yang,LI Xudong,et al. Study and application of deformation characteristics of compacted loess[J]. Rock and Soil Mechanics,2014,35(2):37–44.(in Chinese))
[8] 葛苗苗,李 宁,郑建国,等. 考虑黄土时效变形特性的高填方工后沉降预测[J]. 土木工程学报,2015,48(增2):262–267.(GE Miaomiao,LI Ning,ZHENG Jianguo,et al. Prediction of the post-construction settlement of high filled embankment with considering the time depending deformation of compacted loess[J]. China Civil Engineering Journal,2015,48(Supp.2):262–267.(in Chinese))
[9] 朱才辉,李 宁. 基于黄土变形时效试验的高填方工后沉降研究[J].岩土力学,2015,36(10):3 023–3 031.(ZHU Caihui,LI Ning. Post-construction settlement analysis of loess-high filling based on time-dependent deformation experiments[J]. Rock and Soil Mechanics,2015,36(10):3 023–3 031.(in Chinese))
[10] 刘 宏,李攀峰,张倬元. 九寨黄龙机场高填方地基工后沉降预测[J]. 岩土工程学报,2005,27(1):90–93.(LIU Hong,LI Panfeng,ZHANG Zhuoyuan. Prediction of the post-construction settlement of the high embankment of Jiuzhai—Huanglong airport[J]. Chinese Journal of Geotechnical Engineering,2005,27(1):90–93.(in Chinese))
[11] 杨 涛,戴济群,李国维. 基于指数法的分级填筑路堤沉降预测方法研究[J]. 土木工程学报,2005,38(5):92–95.(YANG Tao,DAI Jiqun,LI Guowei. Settlement prediction of stage-constructed embankment on soft ground using the exponent fitting method[J]. China Civil Engineering Journal,2005,38(5):92–95.(in Chinese))
[12] 王丽琴,靳宝成,杨有海. 黄土路堤工后沉降预测新模型与方法[J]. 岩石力学与工程学报,2007,26(11):2 370–2 376.(WANG Liqin,JIN Baocheng,YANG Youhai. New model and method for forecasting post-construction settlement of loess-fill embankments[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(11):2 370–2 376. (in Chinese))
[13] 郑建国,王 婷,张继文. 黄土路基沉降量预测方法的研究[J]. 岩土力学,2010,31(1):321–326.(ZHENG Jianguo,WANG Ting,ZHANG Jiwen. Study of settlement prediction methods of loess subgrade[J]. Rock and Soil Mechanics,2010,31(1):321–326.(in Chinese))
[14] 谭昌明,周 建,黄广龙. 多层软土地基沉降的分层迭代反演综合预测法[J]. 中国公路学报,2001,14(4):28–32.(TAN Changming,ZHOU Jian,HUANG Guanglong. Terative back-analysis layer by layer method to predict settlement of several layers soft clay ground[J]. China Journal of Highway and Transport,2001,14(4):28–32.(in Chinese))
[15] 吕 庆,尚岳全,陈允法,等. 高填方路堤黏弹性参数反演与工后沉降预测分析[J]. 岩石力学与工程学报,2005,24(7):1 231–1 235. (LU Qing,SHANG Yuequan,CHEN Yunfa,et al. Back-analysis of viscoelastic parameters of filling materials and settlement prediction for high filled embankment[J]. Chinese Journal of Rock Mechanics and Engineering,2005,24(7):1 231–1 235.(in Chinese))
[16] 曹文贵,李 鹏,程 晔. 高填石路堤蠕变本构模型及其参数反演分析与应用[J]. 岩土力学,2006,27(8):1 299–1 304.(CAO Wengui,LI Peng,CHENG Ye. Study on constitutive model and its parameter’s back analysis of creep deformation for the high rock fill embankment and their application[J]. Rock and Soil Mechanics,2006,27(8):1 299–1 304.(in Chinese))
[17] 葛苗苗,李 宁,张 炜,等. 黄土高填方沉降规律分析及工后沉降反演预测[J]. 岩石力学与工程学报,2017,36(3):745–753.(GE Miaomiao,LI Ning,ZHANG Wei,et al. Settlement behavior and inverse prediction of post construction settlement of high filled loess embankment[J]. Chinese Journal of Rock Mechanics and Engineering,2017,36(3):745–753.(in Chinese))
[18] 刘守华,韩文喜,李景林,等. 用离心模型研究超高填方地基变形特性[J]. 工程勘察,2005,(2):8–11.(LIU Shouhua,HAN Wenxi,LI Jinglin,et al. Research on settlement behaviors of high-filling foundation by using centrifuge model[J]. Geotechnical Investigation and Surveying,2005,(2):8–11.(in Chinese))
[19] 刘 宏,张倬元,韩文喜. 用离心模型试验研究高填方地基沉降[J].西南交通大学学报,2003,38(3):323–326.(LIU Hong,ZHANG Zhuoyuan,HAN Wenxi. Centrifugal model tests for settlement of high embankment[J]. Journal of Southwest Jiaotong University,2003,38(3):323–326.(in Chinese))
[20] 景宏君,胡长顺,王秉纲. 黄土高路堤沉降变形规律研究[J]. 岩石力学与工程学报,2005,24(增2):5 845–5 850.(JING Hongjun,HU Changshun,WANG Binggang. Study on settlement and deformation laws of high loess-fill embankment[J]. Chinese Journal of Rock Mechanics and Engineering,2005,24(Supp.2):5 845–5 850.(in Chinese))
[21] 张军辉,黄湘宁,郑建龙,等. 河池机场填石高填方土基工后沉降离心模型试验研究[J]. 岩土工程学报,2013,35(4):773–778. (ZHANG Junhui,HUANG Xiangning,ZHENG Jianlong,et al. Centrifugal model tests on post-construction settlement of high embankment of Hechi Airport[J]. Chinese Journal of Geotechnical Engineering,2013,35(4):773–778.(in Chinese))
[22] 曹 杰,郑建国,张继文,等. 不同边界条件下黄土高填方沉降离心模型试验[J]. 中国水利水电科学研究院学报,2017,15(4):256–262.(CAO Jie,ZHENG Jianguo,ZHANG Jiwen,et al. Centrifuge model tests of loess high-filled settlement under different boundary conditions[J]. Journal of China Institute of Water Resources and Hydropower Research,2017,15(4):256–262.(in Chinese))
[23] 田 海,孔令伟,李 波. 降雨条件下松散堆积体边坡稳定性离心模型试验研究[J]. 岩土力学,2015,36(11):3 180–3 186.(TIAN Hai,KONG Lingwei,LI Bo. Centrifugal modeling tests on stability of deposits slope under rainfall[J]. Rock and Soil Mechanics,2015,36(11):3 180–3 186.(in Chinese))