[1] |
LAM S Y W. Application of terrestrial laser scanning methodology in geometric tolerances analysis of tunnel structures[J]. Tunnelling and Underground Space Technology Incorporating Trenchless Technology Research,2006,21(3/4):410-416.
|
[3] |
RIVEIRO B,MORER P,ARIAS P,et al. Terrestrial laser scanning and limit analysis of masonry arch bridges[J]. Construction and Building Materials,2011,25(4):1 726-1 735.
|
[6] |
SEO D J,LEE J C,LEE Y D,et al. Development of cross section management system in tunnel using terrestrial laser scanning technique[J]. The International Archives of the Photogrammetry,Remote Sensing and Spatial Information Sciences,2008,11(1):573-582.
|
[8] |
尤相骏,成 俊. 一种真圆型隧道激光扫描断面变形检测新方法的研究[J]. 隧道建设,2017,37(7):794-802.(YOU Xiangjun,CHENG Jun. Study of a new proper circular tunnel cross-section deformation detection method based on 3D laser scanning technology[J]. Tunnel Construction,2017,37(7):794-802.(in Chinese))
|
[11] |
程云建,仇文革,雷 劲. 基于三维点云的隧道全局中线提取方法及应用[J]. 湖南大学学报:自然科学版,2017,44(9):146-150.(CHNG Yunjian,CHOU Wenge,LEI Jin. Application of method for global extraction of tunnel centerlines based on 3D point clouds[J]. Journal of Hunan University:Natural Sciences,2017,44(9):146-150.(in Chinese))
|
[4] |
胡琦佳. 三维激光扫描技术在隧道工程监测中的应用研究[硕士学位论文][D];成都:西南交通大学,2013.(HU Qijia. Research on the application of 3D laser scanning technology in the tunnel deformation monitoring date[M. S. Thesis][D]. Chengdu:Southwest Jiaotong University,2013.(in Chinese))
|
[14] |
谢雄耀,卢晓智,田海洋,等. 基于地面三维激光扫描技术的隧道全断面变形测量方法[J]. 岩石力学与工程学报,2013,32(11):2 214-2 224.(XIE Xiongyao,LU Xiaozhi,TIAN Haiyang,et al. Development of a modeling for monitoring tunnel deformation based on terrestrial 3D laser scanning[J]. Chinese Journal of Rock Mechanics and Engineering,2013,32(11):2 214-2 224.(in Chinese))
|
[15] |
荆海峰,李广云,王 力,等. 基于圆柱多段拟合的隧道中轴线提取方法研究[J]. 大地测量与地球动力学,2018,38(2):211-215.(JING Haifeng,LI Guangyun,WANG Li,et al. Research on extracting central axis of tunnel based on multi-segment cylinder fitting[J]. Journal of Geodesy and Geodynamics,2018,38(2):211-215.(in Chinese))
|
[19] |
XIE X,LU X. Development of a 3D modeling algorithm for tunnel deformation monitoring based on terrestrial laser scanning[J]. Underground Space,2017,2(1):16-29.
|
[22] |
王井利,李华健,王挥云. 基于中轴线拟合的隧道点云去噪研究[J]. 沈阳建筑大学学报:自然科学版,2019,35(4):676-683.(WANG Jingli,LI Huajian,WANG Huiyun. Research on tunnel point cloud denoising based on centerline fitting[J]. Journal of Shenyang Jianzhu University:Natural Science,2019,35(4):676-683.(in Chinese))
|
[24] |
CHENG Y J,QIU W,LEI J. Automatic extraction of tunnel lining cross-sections from terrestrial laser scanning point clouds[J]. Sensors,2016,16(10):1 648-1 664.
|
[2] |
GORDON S J,LICHTI D D. Modeling terrestrial laser scanner data for precise structural deformation measurement[J]. Journal of Surveying Engineering,2007,133(2):72-80.
|
[7] |
许 磊,王长进. 基于激光点云的隧道超欠挖检测方法研究[J]. 铁道工程学报,2016,33(12):77-81.(XU Lei,WANG Changjin. Research on the automated extraction of tunnel cross section[J]. Journal of Railway Engineering Society,2016,33(12):77-81.(in Chinese))
|
[9] |
王令文,程效军,万程辉. 基于三维激光扫描技术的隧道检测技术研究[J]. 工程勘察,2013,(7):56-60.(WANG Lingwen,CHENG Xiaojun,WAN Chenghui. Study on the 3D laser scanning technology for tunnel inspection[J]. Geotechnical Investigation and Surveying,2013,(7):56-60.(in Chinese))
|
[10] |
托 雷,康志忠,谢远成,等. 利用三维点云数据的地铁隧道断面连续截取方法研究[J]. 武汉大学学报:信息科学版,2013,38(2):171-175.(TUO Lei,KANG Zhizhong,XIE Yuancheng,et al. Continuously vertical section abstraction for deformation monitoring of subway tunnel based on terrestrial point clouds[J]. Geomatics and Information Science of Wuhan University,2013,38(2):171-175.(in Chinese))
|
[12] |
王龙飞,胡海峰,廉旭刚. 全站扫描点云支持下的铁路隧道横断面快速提取及变形分析[J]. 测绘通报,2019,(5):55-59.(WANG Longfei,HU Haifeng,LIAN Xugang,et al. Fast section extraction and deformation analysis of railway tunnel based on total station scanning point cloud[J]. Bulletin of Surveying and Mapping,2019,(5):55-59.(in Chinese))
|
[16] |
王正帅,邓喀中. 概率积分法参数辨识的多尺度核偏最小二乘回归方法[J]. 岩石力学与工程学报,2011,30(增2):3 863-3 870. (WANG Zhengshuai,DENG Kazhong. Parameters identification of probability-integral method based on multi-scale kernel partial least- squares regression method[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(Supp.2):3 863-3 870.(in Chinese))
|
[5] |
PUENTE I,AKINCI B,GONZáLEZ-JORGE H,et al. A semi-automated method for extracting vertical clearance and cross sections in tunnels using mobile LiDAR data[J]. Tunnelling and Underground Space Technology,2016,59(10):48-54.
|
[17] |
卢小平,朱宁宁,禄丰年. 基于椭圆柱面模型的隧道点云滤波方法[J]. 武汉大学学报:信息科学版,2016,41(11):1 476-1 482.(LU Xiaoping,ZHU Ningning,LU Fengnian. An elliptic cylindrical model for tunnel filtering[J]. Geomatics and Information Science of Wuhan University,2016,41(11):1 476-1 482.(in Chinese))
|
[18] |
ZHU N,JIA Y,LUN L. Tunnel point cloud filtering method based on elliptic cylindrical model[J]. ISPRS-International Archives of the Photogrammetry,Remote Sensing and Spatial Information Sciences,2016,XLI-B1:735-740.
|
[20] |
李 双. 基于三维激光扫描技术的隧道连续断面提取及变形分析[硕士学位论文][D];西安:长安大学,2015.(HU Qijia. Tunnel continuous cross-section extraction and deformation analysis using terrestrial scanning[M. S. Thesis][D]. Xi¢an:Chang¢an University,2015.(in Chinese))
|
[23] |
HAN S,CHO H,KIM S,et al. Automated and efficient method for extraction of tunnel cross sections using terrestrial laser scanned data[J]. Journal of Computing in Civil Engineering,2012,27(3):274-281.
|
[13] |
程效军,贾东峰,刘燕萍,等. 基于中轴线的隧道点云去噪算法[J]. 同济大学学报:自然科学版,2015,43(8):1 239-1 245. (CHENG Xiaojun,JIA Dongfeng,LIU Yanping,et al. Tunnel point cloud denoising algorithm based on centerline[J]. Journal of Tongji University:Natural Science,2015,43(8):1 239-1 245.(in Chinese))
|
[21] |
DU L,ZHONG R,SUN H,et al. Automatic monitoring of tunnel deformation based on high density point clouds data[J]. International Archives of the Photogrammetry,Remote Sensing and Spatial Information Sciences,2017,XLII-2/W7:353-360.
|