[3] |
龚维明,王正振,戴国亮,等. 长江大桥基础的应用与发展[J]. 桥梁建设,2019,49(6):13–23.(GONG Weiming,WANG Zhengzhen,DAI Guoliang,et al. Application and development of foundations of Changjiang River Bridges[J]. Bridge Construction,2019,49(6):13–23.(in Chinese))
|
[1] |
李军堂,秦顺全,张瑞霞. 桥梁深水基础的发展和展望[J]. 桥梁建设,2020,50(3):17–24.(LI Juntang,QIN Shunquan,ZHANG Ruixia. Developments and prospects of deep water foundations for bridge[J]. Bridge Construction,2020,50(3):17–24.(in Chinese))
|
[4] |
段良策,殷 奇. 沉井设计与施工[M]. 上海:同济大学出版社,2006:1–10.(DUAN Liangce,YIN Qi. Design and construction of caissons[M]. Shanghai:Tongji University Press,2006:1–10.(in Chinese))
|
[6] |
JIANG B N,WANG M T,CHEN T,et al. Experimental study on the migration regularity of sand outside a large,deep-water,open caisson during sinking[J]. Ocean Engineering,2019,193:106601.
|
[15] |
王红霞,王徳禹. 大型沉井结构施工力学模型的研究[J]. 力学季刊,2003,(1):68–74.(WANG Hongxia,WANG Deyu. Mechanics model study in large extra caissons construction[J]. Chinese Quarterly of Mechanics,2003,(1):68–74.(in Chinese))
|
[17] |
董晓朋. 超深大沉井施工期间结构内力试验研究[硕士学位论文][D]. 成都:西南交通大学,2018.(DONG Xiaopeng. Experimental research on structural internal force of the ultra-deep and large caisson during construction[M. S. Thesis][D]. Chengdu:Southwest Jiaotong University,2018.(in Chinese))
|
[25] |
GLOROT X,BORDES A,BENGIO Y. Deep sparse rectifier neural networks[C]// Proceedings of the Fourteenth International Conference on Artificial Intelligence and Statistics. Proceedings of Machine Learning Research. [S. l.]:[s. n.],2011:315–323.
|
[26] |
秦顺全,徐 伟,陆勤丰,等. 常泰长江大桥主航道桥总体设计与方案构思[J]. 桥梁建设,2020,50(3):1–10.(QIN Shunquan,XU Wei,LU Qinfeng,et al. Overall design and concept development for main navigational channel bridge of Changtai Changjiang River Bridge[J]. Bridge Construction,2020,50(3):1–10.(in Chinese))
|
[28] |
秦顺全,谭国宏,陆勤丰,等. 超大沉井基础设计及下沉方法研究[J]. 桥梁建设,2020,50(5):1–9.(QIN Shunquan,TAN Guohong,LU Qinfeng,et al. Research on design and sinking methods for super-large caisson foundation[J]. Bridge Construction,2020,50(5):1–9.(in Chinese))
|
[2] |
穆保岗,朱建民,龚维明. 大型沉井设计、施工及监测[M]. 北京:中国建筑工业出版社,2015:1–21.(MU Baogang,ZHU Jianmin,GONG Weiming. Design,construction and monitoring of large open caissons[M]. Beijing:China Architecture and Building Press,2015:1–21.(in Chinese))
|
[11] |
穆保岗,朱建民,牛亚洲. 南京长江四桥北锚碇沉井监控方案及成果分析[J]. 岩土工程学报,2011,33(2):269–274.(MU Baogang,ZHU Jianmin,NIU Yazhou. Monitoring and analysis of north anchorage caisson of Fourth Nanjing Yangtze River Bridge[J]. Chinese Journal of Geotechnical Engineering,2011,33(2):269–274.(in Chinese))
|
[22] |
GOODFELLOW I,BENGIO Y,COURVILLE A. Deep learning[M]. Cambridge:MIT Press,2016:29–487.
|
[5] |
ALLENBY D,WALEY G,KILBURN D. Examples of open caisson sinking in Scotland[J]. Proceedings of the Institution of Civil Engineers-Geotechnical Engineering,2009,162(1):59–70.
|
[9] |
朱建民,龚维明,穆保岗,等. 南京长江四桥北锚碇沉井下沉安全监控研究[J]. 建筑结构学报,2010,31(8):112–117.(ZHU Jianmin,GONG Weiming,MU Baogang,et al. Sinking safety monitoring research on north anchorage caisson of the Fourth Nanjing Yangtze River Bridge[J]. Journal of Building Structures,2010,31(8):112–117.(in Chinese))
|
[20] |
CAVALLI S,AMORETTI M. CNN-based multivariate data analysis for bitcoin trend prediction[J]. Applied Soft Computing,2021,101:107065.
|
[31] |
周小雄,龚秋明,殷丽君,等. 基于BLSTM-AM模型的TBM稳定段掘进参数预测[J]. 岩石力学与工程学报,2020,39(增2):3 505– 3 515.(ZHOU Xiaoxiong,GONG Qiuming,YIN Lijun,et al. Predicting boring parameters of TBM stable stage based on BLSTM network combined with attention mechanism[J]. Chinese Journal of Rock Mechanics and Engineering,2020,39(Supp.2):3 505–3 515.(in Chinese))
|
[7] |
ROYSTON R,SHEIL B B,BYRNE B W. Monitoring the construction of a large-diameter caisson in sand[J]. Proceedings of the Institution of Civil Engineers-Geotechnical Engineering,2020,175(3):1–17.
|
[8] |
施 洲,李思阳,杨仕力,等. 超大型沉井基础下沉中后期摩阻力特性及突沉机制研究[J]. 岩石力学与工程学报,2019,38(增2): 3 894–3 904.(SHI Zhou,LI Siyang,YANG Shili,et al. Study on the characteristics of friction resistance and the mechanism of sudden sinking in the middle and late sinking stages of super large caisson foundation[J]. Chinese Journal of Rock Mechanics and Engineering,2019,38(Supp.2):3 894–3 904.(in Chinese))
|
[10] |
米长江,王 岩,穆保岗,等. 马鞍山长江公路大桥南锚碇沉井下沉分析[J]. 桥梁建设,2011,(6):6–11.(MI Changjiang,WANG Yan,MU Baogang,et al. Analysis of sinking of south anchorage caisson of Maanshan Changjiang River Highway Bridge[J]. Bridge Construction,2011,(6):6–11.(in Chinese))
|
[12] |
孙彦晓. 大型沉井下沉对土体变形影响的研究[硕士学位论文][D]. 南京:东南大学,2019.(SUN Yanxiao. Research of soil behavior with the sinking of large caisson[M. S. Thesis][D]. Nanjing:Southeast University,2019.(in Chinese))
|
[13] |
潘亚洲,王 琛,梁发云. 大型沉井下沉阻力分布特征及相关工程问题[J]. 结构工程师,2020,36(6):134–143.(PAN Yazhou,WANG Chen,LIANG Fayun. Sinking resistance distribution characteristics of large open caissons and related engineering problems[J]. Structural Engineers,2020,36(6):134–143.(in Chinese))
|
[14] |
张计炜. 深厚软土地区超大型沉井下沉行为及稳定性分析研究[硕士学位论文][D]. 杭州:浙江大学,2020.(ZHANG Jiwei. The research on subsidence behavior and stability analysis of ultra large open caisson in deep soft soil area[M. S. Thesis][D]. Hangzhou:Zhejiang University,2019.(in Chinese))
|
[16] |
龚维明,朱建民,穆保岗,等. 南京长江四桥北锚碇沉井首次降排水下沉研究[J]. 岩土工程学报,2010,32(增2):537–540.(GONG Weiming,ZHU Jianming,MU Baogang,et al. Dewater sinking of north anchorage caisson of Fourth Nanjing Yangtze River Bridge[J]. Chinese Journal of Geotechnical Engineering,2010,32(Supp.2):537–540.(in Chinese))
|
[18] |
刘诗洋,陈祖煜,张云旆,等. 基于卷积神经网络对TBM塌方段的反演分析[J]. 固体力学学报,2021,42(3):287–301.(LIU Shiyang,CHEN Zuyu,ZHANG Yunpei,et al. Back analysis of the TBM collapse section based on convolutional neural networks[J]. Chinese Journal of Solid Mechanics,2021,42(3):287–301.(in Chinese))
|
[19] |
SWAPNA G,KP S,VINAYAKUMAR R. Automated detection of diabetes using CNN and CNN-LSTM network and heart rate signals[J]. Procedia Computer Science,2018,132:1 253–1 262.
|
[21] |
CHEN H Z,CHEN A,XU L L,et al. A deep learning CNN architecture applied in smart near-infrared analysis of water pollution for agricultural irrigation resources[J]. Agricultural Water Management,2020,240:106303.
|
[23] |
NAIR V,HINTON G E. Rectified linear units improve restricted Boltzmann machines[C]// Proceedings of the International Conference on Machine Learning. [S. l.]:[s. n.],2010:807–814.
|
[24] |
邱锡鹏. 神经网络与深度学习[M]. 北京:机械工业出版社,2020:81–108.(QIU Xipeng. Neural networks and deep learning[M]. Beijing:China Machine Press,2020:81–108.(in Chinese))
|
[27] |
李小珍,李星星,舒晓峰,等. 常泰长江大桥主桥风–车–线–桥耦合分析[J]. 桥梁建设,2021,51(3):17–24.(LI Xiaozhen,LI Xingxing,SHU Xiaofeng,et al. Analysis of wind–train–track–bridge interaction for main bridge of Changtai Changjiang River Bridge[J]. Bridge Construction,2021,51(3):17–24.(in Chinese))
|
[29] |
郭明伟,董学超,沈孔健,等. 超大沉井基础取土下沉端阻力变化规律研究[J]. 岩石力学与工程学报,2021,40(增1):2 976–2 985. (GUO Mingwei,DONG Xuechao,SHEN Kongjian,et al. Study on the variation of the bottom resistance during sinking stage of super large caisson foundation[J]. Chinese Journal of Rock Mechanics and Engineering,2021,40(Supp.1):2 976–2 985.(in Chinese))
|
[30] |
施 洲,李佳奇,秦搏聪,等. 大型沉井基础初沉阶段受力特性及开裂控制[J]. 中国铁道科学,2021,42(2):9–18.(SHI Zhou,LI Jiaqi,QIN Bocong,et al. Mechanical characteristics and cracking control of large caisson foundation in initial sinking stage[J]. China Railway Science,2021,42(2):9–18.(in Chinese))
|
[32] |
贾俊平,何晓群,金勇进. 统计学[M]. 北京:中国人民大学出版社,2000:233–317.(JIA Junping,HE Xiaoqun,JIN Yongjin. Statistics[M]. Beijing:China Renmin University Press,2000:233–317.(in Chinese))
|