[2] |
中华人民共和国国家统计局. 中华人民共和国2016年国民经济和社会发展统计公报[EB/OL]. [2017–03–27]. http://www.stats.gov. cn/tjsj/zxfb/201702/t201702281467424.html.(People?s Republic of China National Bureau of Statistics. 2016 People's Republic of China national economic and social development statistical bulletin [EB/OL]. [2017–03–27]. http://www.stats.gov.cn/tjsj/zxfb/201702/ t201702281467424. html.(in Chinese))
|
[3] |
吕大炜,王怀洪,李增学,等. 提高地球物理勘探技术 加强深层煤炭资源开采[C]// 中国地球物理学会年会文集. [S. l.]:[s. n.],2007:39(LV Dawei,WANG Huaihong,LI Zengxue,et al. Improve the geophysical exploration technology to strong then the deep exploitation of coal resources[C]// China Geophysical Conference. [S. l.]:[s. n.],2007:39.(in Chinese))
|
[5] |
康红普,牛多龙,张 镇,等. 深部沿空留巷围岩变形特征与支护技术[J]. 岩石力学与工程学报,2010,29(10):1 977–1 987.(KANG Hongpu,NIU Duolong,ZHANG Zhen,et al. Deformation characteristics of surrounding rock and supporting technology of gob-side entry retaining in deep coal mine[J]. Chinese Journal of Rock Mechanics and Engineering,2010,29(10):1 977–1 987.(in Chinese))
|
[7] |
张 农,韩昌良,阚甲广,等. 沿空留巷围岩控制理论与实践[J]. 煤炭学报,2014,39(8):1 635–1 641.(ZHANG Nong,HAN Changliang,KAN Jiaguang,et al. Theory and practice of surrounding rock control for pillarless gob-side entry retaining[J]. Journal of China Coal Society,2014,39(8):1 635–1 641.(in Chinese))
|
[10] |
张东升,茅献彪. 综放沿空留巷围岩变形特征的试验研究[J]. 岩石力学与工程学报,2002,21(3):331–334.(ZHANG Dongsheng, MAO Xianbiao. Testing study on deformation features of surrounding rocks of gob-side entry retaining in fully-mechanized coal face with top-coal caving[J]. Chinese Journal of Rock Mechanics and Engineering,2002,21(3):331–334.(in Chinese))
|
[12] |
孙恒虎,赵炳利. 沿空留巷的理论与实践[M]. 北京:煤炭工业出版社,1993:39–100.(SUN Henghu,ZHAO Bingli. Theory and practice of gob side entry[M]. Beijing:Coal Industry Press,1993:39–100.(in Chinese))
|
[15] |
阚甲广. 典型顶板条件沿空留巷围岩结构分析及控制技术研究[博士学位论文][D]. 徐州:中国矿业大学,2009.(KAN Jiaguang. Study on rock structural analysis and control technique for gob-side entry retaining under typical roof conditions[Ph. D. Thesis][D]. Xuzhou:China University of Mining and Technology,2009.(in Chinese))
|
[17] |
高明涛. 沿空留巷围岩结构模型的建立及其稳定性分析[J]. 地下空间与工程学报,2014,8(5):904–909.(GAO Mingtao. Establishment of the gob-side entry surrounding rock model and analysis on its stability[J]. Chinese Journal of Underground Space and Engineering,2014,8(5):904–909.(in Chinese))
|
[20] |
YANG H,CAO S,LI Y,et al. Soft roof failure mechanism and supporting method for gob-side entry retaining[J]. Minerals,2015,5(4):707–722.
|
[22] |
国家能源局. 国家能源局关于印发煤层气(煤矿瓦斯)开发利用“十三五”规划的通知[EB/OL]. [2018–01–01]. http://www.gov.cn/ xinwen/2016-12/04/content_5142853.htm.People?s Republic of China National Energy Bureau. Notice of the National Energy Bureau on issuing the Thirteenth Five Year Plan for the exploitation and utilization of coal bed gas[EB/OL]. [2017–12–28]. http://www. gov.cn/xinwen/2016-12/04/content_5142853.html.(in Chinese))
|
[25] |
陈 勇,柏建彪,王襄禹,等. 沿空留巷巷内支护技术研究与应用[J]. 煤炭学报,2012,37(6):903–910.(CHEN Yong,BAI Jianbiao,WANG Xiangyu,et al. Support technology research and application inside roadway of gob-side entry retaining[J]. Journal of China Coal Society,2012,37(6):903–910.(in Chinese))
|
[9] |
张登龙,华心祝. 深部矿井Y型通风沿空留巷围岩控制技术[J]. 煤炭科学技术,2010,38(12):28–32.(ZHANG Denglong,HUA Xinzhu. Surrounding rock control technology of gateway driven a long goaf with Y type ventilation in deep mine[J]. Coal Science and Technology,2010,38(12):29–32.(in Chinese))
|
[13] |
黄玉诚,孙恒虎. 沿空留巷护巷带参数的设计方法[J]. 煤炭学报,1997,22(2):127–131.(HUANG Yucheng,SUN Henghu. Design of gob-side packing parameters for gateways maintained along the goaf[J]. Journal of China Coal Society 1997,22(2):127–131.(in Chinese))
|
[23] |
平煤股份. 保护层已14–31050综采工作面: 平煤股份十二矿采煤工作面作业规程[Z]. 平顶山:平煤股份,2014–04–05.(China Pingmei Shenma Group. The JI14–31050 fully mechanized mining face of protective layer:Working rules for coal mining face of No. 12 coal mine of china Pingmei Shenma Group[Z]. Pingdingshan:China Pingmei Shenma Group,2014–04–05.(in Chinese))
|
[1] |
国家发展改革委,国家能源局. 能源发展“十三五”规划[EB/OL]. [2017–03–27]. http://www.ndrc.gov.cn/zcfb/zcfbghwb/201701/ W020170117350627940556.pdf.(National Development and Reform Commission,National Energy Administration.“13th Five-Year”energy development planning[EB/OL]. [2017–03–27]. http://www. ndrc.gov.cn/zcfb/zcfbghwb/201701/W020170117350627940556.pdf. (in Chinese))
|
[4] |
柏建彪,侯朝炯. 深部巷道围岩控制原理与应用研究[J]. 中国矿业大学学报,2006,35(2):145–148.(BAI Jianbiao,HOU Chaojiong. Control principle of surrounding rocks in deep roadway and its application[J]. Journal of China University of Mining and Technology,2006,35(2):145–148.(in Chinese))
|
[11] |
康红普,王金华,高富强. 掘进工作面围岩应力分布特征及其与支护的关系[J]. 煤炭学报,2009,34(12):1 585–1 593.(KANG Hongpu,WANG Jinhua,GAO Fuqiang. Stress distribution characteristics in rock surrounding heading face and its relationship with supporting[J]. Journal of China Coal Society,2009,34(12):1 585–1 593.(in Chinese))
|
[14] |
华心祝,马俊枫,许庭教. 锚杆支护巷道巷旁锚索加强支护沿空留巷围岩控制机理研究及应用[J]. 岩石力学与工程学报,2005,24(12):2 107–2 112.(HUA Xinzhu,MA Junfeng,XU Tingjiao. Study on controlling mechanism of surrounding rocks of gob-side entry with combination of roadside reinforced cable supporting and roadway bolt supporting and its application[J]. Chinese Journal of Rock Mechanics and Engineering,2005,24(12):2 107–2 112.(in Chinese))
|
[21] |
CHANGLIANG H,NONG Z,BAOYU L,et al. Pressure relief and structure stability mechanism of hard roof for gob-side entry retaining[J]. Journal of Central South University,2015,22(11): 4 445–4 455.
|
[24] |
徐晓炼. 平煤不同赋存深度采动煤岩体稳定性研究[硕士学位论文][D]. 四川大学,2016.(XU Xiaolian. Research on the stability of mining coal rock mass in different depths in Pingdingshan mining area [M. S. Thesis][D]. Chengdu:Sichuan University,2016.(in Chinese))
|
[19] |
SU H,BAI J,YAN S,et al. Study on gob-side entry retaining in fully-mechanized longwall with top-coal caving and its application[J]. International Journal of Mining Science and Technology,2015,25(3):503–510.
|
[8] |
陈 勇. 沿空留巷围岩结构运动稳定机理与控制研究[博士学位论文] [D]. 徐州:中国矿业大学,2012.(CHEN Yong. Study on stability mechanism of rockmass structure movement and its control in gob-side entry retaining[Ph. D. Thesis][D]. Xuzhou:China University of Mining and Technology,2012.(in Chinese))
|
[16] |
薛俊华,韩昌良. 大采高沿空留巷围岩分位控制对策与矿压特征分析[J]. 采矿与安全工程学报,2012,29(4):466–473.(XUE Junhua,HAN Changliang. Strata behavior and control countermeasures for the gob-side entry retaining in the condition of large mining height[J]. Journal of Mining and Safety Engineering,2012,29(4):466–473.(in Chinese))
|
[18] |
何世丰. 基于UDEC煤矿综放沿空留巷充填稳定性数值模拟研究[J]. 煤,2014,(5):9–10.(HE Shifeng. Numerical simulation of filling stability of gob side entry retaining in fully mechanized caving mining based on UDEC[J]. Coal,2014,(5):9–10.(in Chinese))
|
[6] |
李化敏. 沿空留巷顶板岩层控制设计[J]. 岩石力学与工程学报, 2000,19(5):651–654.(LI Huamin. Control design of roof rocks for gob-side entry[J]. Chinese Journal of Rock Mechanics and Engineering,2000,19(5):651–654.(in Chinese))
|