Loading test study on settlement deformation law of deep soft soil layer
YANG Xiaojie1,2,LIU Dongming1,2,3,WANG Xiaocun3
(1. School of Mechanics and Civil Engineering,China University of Mining and Technology,Beijing 100083,China;2. State Key Laboratory of Deep Geomechanics and Underground Engineering,China University of Mining and Technology,Beijing 100083,China;3. China Airport Construction Group Corporation of CAAC.,Beijing 100101,China)
The deep soft soil layer of the 4th runway at Pudong Airport was studied in this paper. During preloading test,the ground settlement deformation law was analyzed and compared under two conditions,using plastic drain plate or without. It was found that during preloading,both the ground settlement and settlement rate in areas using plastic drain plate were much larger than those areas without plastic drain plate. The instantaneous settlement during preloading was both large in two conditions,which both exceeded 50% of the total settlement during whole preloading process. During the process of surcharge preloading,compared to actual loading,the state of the ground soil would appear that shallow soil was over consolidation while the deep soil was still under consolidation. Therefore,for deep multi-layer soft soil ground,residual settlement should be calculated layered and separately after unloading. The research results would have important reference significance to the design and construction of soft soil foundation treatment project.
杨晓杰1,2,刘冬明1,2,3,王孝存3. 深厚软弱土层沉降变形规律堆载试验研究[J]. 岩石力学与工程学报, 2017, 36(S2): 4259-4266.
YANG Xiaojie1,2,LIU Dongming1,2,3,WANG Xiaocun3. Loading test study on settlement deformation law of deep soft soil layer. , 2017, 36(S2): 4259-4266.
王广德,韩黎明,柴震林,等. 上海浦东机场一跑道地基沉降规律[J]. 工程地质学报,2012,20(1):131-137.(WANG Guangde,HAN Liming,CHAI Chenlin,et al. Subgrade settlement rules of first runway of Pudong airport in Shanghai[J].Journal of Engineering Geology,2012,20(1):131-137.(in Chinese))
[2]
杨斐,杨宇亮,孙立军. 飞机起降荷载作用下的场道地基沉降[J]. 同济大学学报:自然科学版,2008,36(6):744-748.(YANG Fei,YANG Yuliang,SUN Lijun. Settlement of runway subgrade under moving aircraft loads[J]. Journal of Tongji University:Natural Science,2008,36(6):744-748.(in Chinese))
[3]
金宗川,顾国荣,韩黎明,等. 大面积堆载作用下软土地基变形特性[J]. 岩石力学与工程学报,2005,24(6):1 056-1 060.(JIN Zongchuan,GU Guorong,HAN Liming,et al. Deformation properties of soft subsoil under large-scale preload[J]. Chinese Journal of Rock Mechanics and Engineering,2005,24(6):1 056-1 060.(in Chinese))
[4]
中华人民共和国行业标准编写组.JTG/TD31-02-2013 公路软土地基路堤设计与施工技术细则[S]. 北京:人民交通出版社,2013.(The Professional Standards Compilation Group of People¢s Republic of China. JTG/T D31-02-2013 Technical specifications for design and construction of highway embankment on soft ground[S]. Beijing:China Communications Press,2013.(in Chinese))
[5]
邓礼久,金亮星,罗嘉金. 塑料排水板堆载预压法处理软基的固结效果[J]. 铁道科学与工程学报,2013,10(3):68-72.(DENG Lijiu,JIN Liangxing,LUO Jiajin. Consolidation effect of reinforcing soft soil foundation by preloading accumulation load method with plastic drainage plate[J]. Journal of Railway Science and Engineering,2013,10(3):68-72.(in Chinese))
[6]
李婉,董志良,陈正汉.塑料排水带堆载法在填海造陆复杂地基处理中的试验研究[J]. 水运工程,2005,(12):55-63.(LI Wan,DONG Zhiliang,CHEN Zhenghan. Experimental study on treatment of complicated ground formed by land reclamation with geodrain- loading method[J]. Port Waterway Engineering,2005,(12):55-63.(in Chinese))
[7]
李国维,杨涛,殷宗泽. 公路软基超载预压机制研究[J]. 岩土工程学报,2006,28(7):896-901.(LI Guowei,YANG Tao,YIN Zongze. Study of mechanism about surcharge preloading method on the soft ground of highways[J]. Chinese Journal of Geotechnical Engineering,2006,28(7):896-901.(in Chinese))
[8]
李国维,盛维高,蒋华忠,等. 超载卸荷后再压缩软土的次压缩特征及变形计算[J]. 岩土工程学报,2009,31(1):118-123.(LI Guowei,SHENG Weigao,JIANG Huazhong,et al. Secondary compression characteristics and settlement calculation of soft clay under overloading-unloading and reloading[J]. Chinese Journal of Geotechnical Engineering,2009,31(1):118-123.(in Chinese))
[9]
胡亚元. 考虑预固结时堆载预压卸载的沉降标准[J]. 浙江大学学报:工学版,2010,44(8):1 615-1 620.(HU Yayuan. Settlement standard of unloading time for preloading method with an eye to pre-consolidation time[J]. Journal of Zhejiang University:Engineering Science,2010,44(8):1 615-1 620.(in Chinese))
[10]
刘吉福,莫海鸿,魏金霞. 对工后沉降法确定卸载时机的研究[J]. 岩石力学与工程学报,2006,25(增2):3 518-3 522.(LIU Jifu,MO Haihong,WEI Jinxia. Study on determination of unloading time using method of settlement after construction[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(Supp.2):3 518-3 522.(in Chinese))
[11]
刘吉福,莫海鸿. 对沉降速率法确定卸载时机的认识[J]. 岩石力学与工程学报,2007,26(增1):3 065-3 072.(LIU Jifu,MO Haihong. Understanding of determination of unloading time using settlement velocity method[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(Supp.1):3 065-3 072.(in Chinese))
[12]
中华人民共和国行业标准编写组.MH/T 5027—2013 民用机场岩土工程设计规范[S]. 北京:中国民航出版社,2013.(The Professional Standards Compilation Group of People¢s Republic of China. MH/T 5027—2013 Code for geotechnical engineering design of airport[S]. Beijing:Civil Aviation Press,2013.(in Chinese))