RESEARCH ON REASONABLE WIDTH OF PARTITION PILLAR CLOSE TO GOAF HEADING MINING IN THICK SEAM OF DEEP SHAFT
LIU Jinhai1,CAO Yunqin2,WEI Zhenquan2,SHEN Wei2
(1. College of Safety Engineering,North China Institute of Science and Technology,Beijing 101601,China; 2. Tianchen Mine,Shandong Energy Zaozhuang Mining Group Co.,Ltd.,Zaozhuang,Shandong 277500,China)
Abstract:Setting reasonable partition pillar is a key to ensuring safe mining of working face heading the goaf in thick seam of deep shaft. Taking determining the width of partition pillar close to 7108 goaf heading mining of LW7110 in Tianchen Mine as the engineering background,the mechanism of the goaf heading mining inducing rock burst and the reasonable width of partition pillar were studied through theoretical analysis,numerical modeling and field monitoring. The following conclusions were obtained. (1) The evolution process of overlying strata spatial structure during LW7110 mining heading the goaf is described as “the fixed S-shaped,the moving S-shaped,the connected S-shaped,the C-shaped and the U-shaped”,and the evolution process of partition pillar stress is described as “the fixed abutment pressure,the moving abutment pressure,the stress superposition and the stress concentration”. (2) The mechanism of rock burst induced by the goaf heading mining is described as the vertical stresses in the partition pillar reaches impact stress condition because of stress concentration. (3) Under the premise of implementing stress relief around the pillar,the reasonable width of partition pillar close to 7108 goaf heading mining is 65 m. Furthermore,the reasonableness of the partition pillar width was verified with a good result. The results can provide a reference for prevention of rock burst induced by mining engineering.
刘金海1,曹允钦2,魏振全2,沈 伟2. 深井厚煤层采空区迎采动隔离煤柱合理宽度研究[J]. 岩石力学与工程学报, 2015, 34(S2): 4269-4277.
LIU Jinhai1,CAO Yunqin2,WEI Zhenquan2,SHEN Wei2. RESEARCH ON REASONABLE WIDTH OF PARTITION PILLAR CLOSE TO GOAF HEADING MINING IN THICK SEAM OF DEEP SHAFT. , 2015, 34(S2): 4269-4277.
姜耀东,潘一山,姜福兴,等. 我国煤炭开采中的冲击地压机制和防治[J]. 煤炭学报,2014,39(2):205-213.(JIANG Yaodong,PAN Yishan,JIANG Fuxing,et al. State of the art review on mechanism and prevention of coal bumps in China[J]. Journal ofChina Coal Society,2014,39(2):205-213.(inChinese))
[2]
齐庆新,李晓璐,赵善坤. 煤矿冲击地压应力控制理论与实践[J]. 煤炭科学技术,2013,41(6):1-5.(QI Qingxin,LI Xiaolu,ZHAO Shankun. Theory and practices on stress control of mine pressure bumping[J]. Coal Science and Technology,2013,41(6):1-5.(in Chinese))
[3]
潘一山,王来贵,章梦涛,等. 断层冲击地压发生的理论与试验研究[J]. 岩石力学与工程学报,1998,17(6):642-649.(PAN Yishan,WANG Laigui,ZHANG Mengtao,et al. The theoretical and testingstudy of fault rock burst[J]. Chinese Journal of Rock Mechanics andEngineering,1998,17(6):642-649.(in Chinese))
[4]
姜福兴,魏全德,王存文,等. 巨厚砾岩与逆冲断层控制型特厚煤层冲击地压机制分析[J]. 煤炭学报,2014,39(7):1191-1196.(JIANG Fuxing,WEI Quande,WANG Cunwen,et al. Analysis of rock burst mechanism in extra-thick coal seam controlled by huge thick conglomerate and thrust fault[J]. Journal of China Coal Society,2014,39(7):1191-1196.(inChinese))
[5]
陈国祥,窦林名,乔中栋,等. 褶皱区应力场分布规律及其对冲击矿压的影响[J]. 中国矿业大学学报,2008,37(6):751-755.(CHEN Guoxiang,DOU Linming,QIAO Zhongdong,et al. The stressfield distribution in folding structure areas and its impaction onrock burst[J]. Journal of China University of Mining andTechnology,2008,37(6):751-755.(inChinese))
[6]
袁瑞甫,李化敏,李怀珍. 煤柱型冲击地压微震信号分布特征及前兆信息判别[J]. 岩石力学与工程学报,2012,31(1):80-85.(YUANRuifu,LI Huamin,LI Huaizhen. Distribution of microseismic signaland discrimination of portentous information of pillar type rockburst[J]. Chinese Journal of Rock Mechanics and Engineering,2012,31(1):80-85.(in Chinese))
[7]
李振雷,窦林名,蔡武,等.深部厚煤层断层煤柱型冲击矿压机制研究[J]. 岩石力学与工程学报,2013,32(3):333-342.(LI Zhenlei,DOU Linming,CAI Wu,et al. Fault-pillar induced rock burst mechanismof thick coal seam in deep mining[J]. Chinese Journalof Rock Mechanics and Engineering,2013,32(3):333-342.(inChinese))
[8]
窦林名,贺 虎.煤矿覆岩空间结构OX-F-T演化规律研究[J]. 岩石力学与工程学报,2012,31(3):453-460.(DOU Linming,HE Hu. Study of OX-F-T spatial structure evolution of overlying strata in coal mines[J]. Chinese Journalof Rock Mechanics and Engineering,2012,31(3):453-460.(inChinese))
[9]
姜福兴,张兴民,杨淑华,等. 长壁采场覆岩空间结构探讨[J].岩石力学与工程学报,2006,25(5):979-984.(JIANG Fuxing,ZHANG Xingmin,YANG Shuhua,et al. Discussion on overlying strata spatial structures of longwall in coal mine[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(5):979-984.(in Chinese))
[10]
刘金海,姜福兴,王乃国,等. 深井特厚煤层综放工作面区段煤柱合理宽度研究[J]. 岩石力学与工程学报,2012,31(5):921-927.(LIU Jinhai,JIANG Fuxing,WANG Naiguo,et al. Research on reasonable width of segment pillar of fully mechanized caving face in extra-thick coal seam of deep shaft[J]. Chinese Journal of Rock Mechanics and Engineering,2012,31(5):921-927.(in Chinese))
[11]
刘金海,姜福兴,孙广京,等. 强排煤粉防治冲击地压的机制与应用[J]. 岩石力学与工程学报,2014,33(4):747-754.(LIU Jinhai,JIANG Fuxing,SUN Guangjing,et al. Mechanism of intensive venting pulverized coal to prevent coal burst and its application[J]. Chinese Journal of Rock Mechanics and Engineering,2014,33(4):747-754.(in Chinese))