[1] |
黄润秋,黄 达,段绍辉,等. 锦屏Ⅰ级水电站地下厂房施工期围岩变形开裂特征及地质力学机制研究[J]. 岩石力学与工程学报,2011,30(1):23-35.(HUANG Runqiu,HUANG Da,DUAN Shaohui, et al. Geomechanics mechanism and characteristics of surrounding rock mass deformation failure in construction phase for underground powerhouse of JinpingⅠhydropower station[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(1):23-35.(in Chinese))
|
[2] |
冯夏庭,江权,向天兵,等. 大型洞室群智能动态设计方法及其实践[J]. 岩石力学与工程学报,2011,30(3):433-448.(FENG Xiating,JIANG Quan,XIANG Tianbing,et al. Intelligent and dynamic design method of large cavern group and its practice[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(3):433-448.(in Chinese))
|
[3] |
李仲奎,周 钟,汤雪峰,等. 锦屏一级水电站地下厂房洞室群稳定性分析与思考[J]. 岩石力学与工程学报,2009,28(11):2 167-2 175.(LI Zhongkui,ZHOU Zhong, TANG Xuefeng,et al. Stability analysis and considerations of underground powerhouse caverns group of Jinping I hydropower station[J]. Chinese Journal of Rock Mechanics and Engineering,2009,28(11):2 167-2 175.(in Chinese))
|
[4] |
黄秋香,邓建辉,苏鹏云,等. 瀑布沟水电站地下厂房洞室群施工期围岩位移特征分析[J]. 岩石力学与工程学报,2011,30(增1):3 032-3 042. (HUANG Qiuxiang,DENG Jianhui,SU Pengyun,et al. Displacement characteristics analysis of surrounding rock in underground powerhousechambers at Pubugou hydropower station during construction[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(Supp.1):3 032-3 042.(in Chinese))
|
[5] |
李志鹏,徐光黎,董家兴,等. 猴子岩水电站地下厂房洞室群施工期围岩变形与破坏特征[J]. 岩石力学与工程学报,2014,33(11):2 291-2 300.(LI Zhipeng,XU Guangli,DONG Jiaxing,et al. Deformationand fracture of surrounding rock mass of underground caverns at Houziyan hydropower station[J]. Chinese Journal of Rock Mechanics and Engineering,2014,33(11):2 291-2 300.(in Chinese))
|
[6] |
姚 强,杨兴国,刘勇林,等. 大型地下厂房洞室群施工期围岩变形分析[J]. 地下空间与工程学报,2014,33(5):1 164-1 169.(YAO Qiang,YANG Xingguo,LIU Yonglin,et al. Deformation of surrounding rock mass of large underground powerhouse cavern groups during their construction[J]. Chinese Journal of Underground Space and Engineering,2014,33(5):1 164-1 169.(in Chinese))
|
[7] |
HE M C,SOUSA R L,MÜLLER A,et al,Analysis of excessive deformations in tunnels for safety evaluation[J].Tunnelling and Underground Space Technology,2015,45:190-202.
|
[8] |
SOUSA RL.Risk analysis for tunneling projects[Ph. D.Thesis][D]. Cambridge:CambridgeUniversity,2010.
|
[9] |
蔡美峰 岩石力学与工程[M]. 北京:科学出版社,2013:348.(CAI Meifeng. Rock mechanics and engineering[M]. Beijing:Science Press,2013:348.(in Chinese))
|
[10] |
高春玉,邓建辉,魏进兵. 官地地下厂房洞室群施工期围岩位移特征分析[J]. 岩石力学与工程学报,2012,31(2):3 911-3 919.(GAO Chunyu,DENG Jianhui,WEI Jinbing. Analysis of surrounding rock displacement characteristics[J]. Chinese Journal of Rock Mechanics and Engineering,2012,31(Supp.2):3 911-3 919.(in Chinese))
|
[11] |
李正刚. 二滩水电站地下厂房系统洞室围岩变形研究[J]. 四川水力发电,2004,(1):43-47.(LI Zhenggang. Research of deformation of surrounding rock in underground main house in Ertan hydropower station[J]. Sichuan Water Power,2004,(1):43-47.(in Chinese))
|
[12] |
廖秋林,侯哲生,何小东,等. 断层影响下隧道围岩变形监测与特征分析[J]. 水文地质工程地质,2005,32(6):102-107.(MIAO Qiulin,HOUZhesheng,HE Xiaodong,et al. Monitoring and characteristic of deformation of tunnel surrounding rock with effect of fault[J]. Journal of Hydrology and Engineering Geology,2005,32(6):102-107.(in Chinese))
|
[13] |
李守柱,黄鼎成,邢念信,等. 软弱破碎围岩变形特性[J]. 工程地质学报,1993,1(1):74-84.(LI Shouzhu,HUANG Dingcheng,XING Nianxin,et al. Deformation characteristic of soft and broken surrounding rock[J]. Journal of Engineering Geology,1993,1(1):74-84.(in Chinese))
|
[14] |
彭 琦,王俤剀,邓建辉,等. 地下厂房围岩变形特征分析[J]. 岩石力学与工程学报,2007,26(12):2 583-2 587.(PENG Qi,WANG Dikai,DENG Jianhui,et al. Analysis of surrounding rock deformation characteristic in underground powerhouse[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(12):2 583-2 587(in Chinese))
|
[15] |
高春玉,邓建辉,魏进兵. 官地地下厂房洞室群施工期围岩位移特征分析[J]. 岩石力学与工程学报,2012,31(增2):3 911-3 919.(GAOChunyu,DENG Jianhui Wei Jinbing. Analysis of surrounding rock displacement characteristics during constructionin Guandi underground powerhouse chambers[J]. Chinese Journal of Rock Mechanics and Engineering,2012,31(Supp.2):3 911-3 919.(in Chinese))
|
[16] |
魏进兵,邓建辉,王俤剀,等. 锦屏一级水电站地下厂房围岩变形与破坏特征分析[J]. 岩石力学与工程学报,2010,29(6):1 198-1 205.(WEI Jinbing,DENG Jianhui,WANG Dikai,et al. Characterization of deformation and fracture for rock mass in underground powerhouse of Jinping I hydropower station[J]. Chinese Journal of Rock Mechanicsand Engineering,2010,29(6):1 198-1 205.(in Chinese))
|
[17] |
HÅKAN S,ARILD P. Ground behaviour and rock mass composition in underground excavations[J]. Tunnelling and Underground Space Technology,2008,23(1):46-64.
|
[18] |
ALEJANO L R,RODRIGUEZ-DONO A,ALONSO E,et al. Ground reaction curves for tunnels excavated in different quality rock masses showing several types of post-failure behaviour[J]. Tunnelling and Underground Space Technology,2009,24(6):689-705.
|
[19] |
张春生,王 岩,陈正雄. 金沙江白鹤滩水电站可行性研究报告[R]. 杭州:中国水电设计集团华东勘测设计研究院,2011.(ZHANG Chunsheng,WANG Yan,CHEN Zhengxiong. Feasibility study report of Baihetan hydropower station[R]. Hangzhou:PowerChina Huadong Engineering Corporation Limited,2011.(in Chinese))
|
[20] |
孟国涛,褚卫江. 金沙江白鹤滩水电站地下厂房第Ⅰ层开挖围岩破坏机理与工程对策研究[R]. 杭州:浙江中科伊泰斯卡岩石工程研发有限公司,2014.(MENG Guotao,CHU Weijiang. Surrounding rock failure mechanism and engineering countermeasures of first floor excavation of underground powerhouse in BaiHetan hydropower station[R]. Hangzhou:HydroChina-Itasca R&D Center,2014.(in Chinese))
|
[21] |
张春生. 金沙江白鹤滩水电站地下厂房顶拱第一层及后续边墙开挖支护咨询材料[R]. 杭州:中国水电设计集团华东勘测设计研究有限公司,2014.(ZHANG Chunsheng. First floor and following side wall excavation and support consulting report of Baihetan hydropower station in Jin Sha River[R]. Hangzhou:PowerChina Huadong Engineering Corporation Limited,2014.(in Chinese))
|
[22] |
冯夏庭,江 权. 金沙江白鹤滩水电站大型地下厂房洞室群施工期稳定性动态反馈分析研究阶段报告一[R]. 武汉:中国科学院武汉岩土力学研究所,2014.(FENG Xiating,JIANG Quan. First periodic report of dynamic feedback analysis of surrounding rock stability during construction period of Baihetan hydropower station[R]. Wuhan:Institute of RockandSoil Mechanics,Chinese Academyof Sciences,2014.(in Chinese))
|
[23] |
徐干成,郑颖人,乔春生,等. 地下工程支护结构与设计[M]. 北京:中国水利水电出版社,2013:55.(XU Gancheng,ZHENG Yingren,QIAO Chunsheng,et al. Supporting Structure and Design in Underground Engineering[M]. Beijing:China Water Power Press,2013:55.(in Chinese))
|
[24] |
冯夏庭,张传庆,李邵军,等 深埋硬岩隧洞动态设计方法[M] 北京:科学出版社,2013:140.(FENG Xiating,ZHANG Chuanqing,LI Shaojun,et al. Dynamic design method for deep tunnels in hard rock[M]. Beijing:Science Press,2013:140.(in Chinese))
|
[25] |
张倬元,王士天,王兰生,等. 工程地质分析原理[M] 北京:地质出版社 2013:7(ZHANG Zhuoyuan,WANG Shitian,WANG Lansheng,et al. Principle of engineering geology[M]. Beijing:Geological Publishing House,2013:7.(in Chinese))
|
[26] |
郑颖人,朱合华,方正昌,等. 地下工程围岩稳定分析与设计理论[M]. 北京:人民交通出版社,2012:15-16(ZHENG Yingren,ZHU Hehua,FANG Zhengchang,et al. Thestability analysis and design theory of surrounding rock of underground engineering[M]. Beijing:China Communications Press,2012:15-16.(in Chinese))
|
[27] |
陈 静. 硬岩时效变形和破坏机制及其工程行为分析[博士学位论文][D]. 武汉:中国科学院武汉岩土力学研究所,2013.(CHEN Jing. Time-dependent deformation and fracture mechanism of hard rock and engineering behavior analysis[Ph. D. Thesis][D]. Wuhan:Institute of Rock and Soil Mechanics,Chinese Academy of Sciences,2013.(in Chinese))
|
[28] |
徐鼎平,冯夏庭,崔玉军,等. 白鹤滩水电站层间错动带的剪切特性[J].岩石力学与工程学报,2012,31(增1):2 692-2 703.(XU Dingping,FENG Xiating,CUI Yujun,et al. Shear behaviors of interlayer staggered zone at BaiHetan hydropower station[J]. Chinese Journal of Rock Mechanics and Engineering,2012,31(Supp.1):2 692-2 703.(in Chinese))
|
|
[29]
|