|
[1] MARSTON A. The theory of external loads on closed conduits in the light of the latest experiments[C]// Proceedings of Highway Research Board. Washington D. C.:[s.n.],1930:138–170.
[2] LARSEN N G,HENDRICKSON J G. A practical method for constructing rigid conduits under high fills[C]// Proceedings of the 41st Annual Meeting of the Highway Research Board. Washington D. C.:[s.n.],1962:273–280.
[3] TAYLOR R K,SPANGLER M G. Induced-trench method of culvert installation[C]// Proceedings of 52nd Annual Meeting of the Highway Research Board. [S.l.]:[s.n.],1973:41–55.
[4] SLADEN J A,OSWELL J M. The induced trench method-a critical review and case history[J]. Canadian Geotechnical Journal,1988,25(3):541–549.
[5] 白 冰. 高填土下刚性结构物竖向土压力卸载方法[J]. 岩土力学,1997,18(1):35–39.(BAI Bing. The measure for reducing the vertical earth pressure on the buried rigid structure[J]. Rock and Soil Mechanics,1997,18(1):35–39.(in Chinese))
[6] 顾安全. 上埋式管道及洞室垂直土压力的研究[J]. 岩土工程学报,1981,3(1):3–15.(GU Anquan. Investigation of the vertical earth pressure on projecting conduit and underground chamber under a high embankment[J]. Chinese Journal of Geotechnical Engineering,1981,3(1):3–15.(in Chinese))
[7] 顾安全,郭婷婷,王兴平. 高填土涵洞(管)采用EPS板卸载的试验研究[J]. 岩土工程学报,2005,27(5):500–504.(GU Anquan,GUO Tingting,WANG Xingping. Experimental study on reducing-load measurement using EPS of culvert under high-stacked soil[J]. Chinese Journal of Geotechnical Engineering,2005,27(5):500–504.(in Chinese))
[8] 顾安全,金 滨,冯瑞玲. 减载措施在高填土涵洞中的应用研究[C]// 中国岩石力学与工程学会第七次学术大会论文集. [S.l.]:[s.n.],2002:503–506. (GU Anquan,JIN Bin,FENG Ruiling. The study of the usage for the reducing-load measurement of the culvert under the high-stacked soil[C]// Procedings of the 7th Conference of Chinese Society for Rock Mechanics and Engineering . [S.l.]:[s.n.],2002:503–506.(in Chinese))
[9] 顾安全,吕镇锋,姜峰林,等. 高填土盖板涵EPS板卸载试验及设计方法[J]. 岩土工程学报,2009,31(10):1 481–1 486.(GU Anquan,LU Zhenfeng,JIANG Fenglin,et al. Load reduction tests and design methods for culverts with high fill soil using EPS slabs[J]. Chinese Journal of Geotechnical Engineering,2009,31(10):1 481–1 486.(in Chinese))
[10] WARITH M A,SUDHAKAR M. Predicting the compressibility behavior of tire sherd samples for landfill applications[J]. Waste Management,2006,26(3):268–276.
[11] 张豫川,杜伟飞. 盖板涵洞采用废轮胎条轻质土减荷试验[J]. 沈阳建筑大学学报:自然科学版,2012,28(1):104–109.(ZHANG Yuchuan,DU Weifei. Research on the role of reinforced soil with tires to reduce the vertical earth pressure above the roof-culvert[J]. Journal of Shenyang Jianzhu University:Natural Science,2012,28(1):104–109.(in Chinese))
[12] 姜峰林. 高填方涵洞EPS板减荷技术应用及数值模拟研究[博士学位论文][D]. 西安:长安大学,2010.(JIANG Fenglin. EPS load reduction technology application and numerical simulation for high fill culvert[Ph. D. Thesis][D]. Xi¢an:Chang¢an University,2010.(in Chinese))
[13] 李 盛,马 莉,王起才,等. 高填黄土明洞卸载结构土压力模型试验和数值模拟分析[J]. 岩土工程学报,2016(待刊).(LI Sheng,MA Li,WANG Qicai,et al. Model test and numerical simulation analysis of earth pressure for high fill open cut tunnel unloading structure[J]. Chinese Journal of Geotechnical Engineering,2016(to be Pressed).(in Chinese))
[14] 白 冰,陆士强. 聚苯乙烯泡沫塑料的测试及其在土工中的应用[J].岩工程学报,1993,15(2):104–108.(BAI Bing,LU Shiqiang. Testing of polystyrene foamed plastics and its application in geotechnical engineering[J]. Chinese Journal of Geotechnical Engineering,1993,15(2):104–108.(in Chinese))
[15] 王俊伟. EPS材料用于高填方涵洞减荷的工程性质研究[硕士学位论文][D]. 西安:长安大学,2009.(WANG Junwei. EPS engineering properties for culvert load reduction under high fill embankment[M. S. Thesis][D]. Xi¢an:Chang¢an University,2009.(in Chinese))
[16] 刘 静. 高填路堤涵洞土压力理论及减荷技术研究[博士学位论文][D]. 西安:长安大学,2004.(LIU Jing. Study on the earth Pressure acting on the culvert under the embankment of high-staked soil and the load reducing technique[Ph. D. Thesis][D]. Xi¢an:Chang¢an University,2004.(in Chinese))
|