(State Key Laboratory of Geomechanics and Geotechnical Engineering,Institute of Rock and Soil Mechanics, Chinese Academy of Sciences,Wuhan,Hubei 430071,China)
Abstract:The settlement process of high fill channel is difficult to predict in the south-to-north water diversion project. The influence of filling height H,elastic modulus E and Poisson's ratio on the channel were clarified with ANSYS FEM. The lateral deformation correction coefficient K1 and the additional settlement correction coefficient K2 were proposed,and the compression modulus of filled soil was corrected during the loading process. And a calculation method which was applicable to the settlement process of high fill channel was established on the basis of layered summation method. The settlement of channel based mainly on the consolidation settlement Sj in the process of grading load Pi which mainly produce creep deformation Ss when the grading load Pi remains constant. The method has less calculating parameters,and the impact of the lateral deformation,the additional settlement and the compression modulus changing with depth are considered. The settlement process and the total settlement,which start from the channel filling until stable during the post-construction settlement,could be properly calculated out by the method. A visualization application was compiled based on the calculation method in Matlab7.0,which could reasonably simulate and predict the settlement process of high fill channel under the application of grading load,and provide a quick and practical guidance for the design and construction of high fill channel.
张 宇,陈善雄,余 飞,熊署丹,戴张俊. 南水北调高填方渠道沉降过程计算方法研究[J]. 岩石力学与工程学报, 2014, 33(S2): 4367-4374.
ZHANG Yu,CHEN Shanxiong,YU Fei,XIONG Shudan,DAI Zhangjun. CALCULATION METHOD STUDY OF SETTLEMENT PROCESS OF HIGH FILLING CHANNELS IN SOUTH-TO-NORTH WATER DIVERSION PROJECT. , 2014, 33(S2): 4367-4374.
刘奉银,赵 然,谢定义,等. 黄土高填方路堤沉降分析[J]. 长安大学学报:自然科学版,2003,23(6):23-28.(LIU Fengyin,ZHAO Ran,XIE Dingyi,et al. Settlement of loess-filled highway embankment[J].Journal of Chang¢an University:Natural Science,2003,23(6):23-28.(in Chinese))
[2]
顾淦臣.土坝设计[M].北京:中国工业出版社,1963:273-279.(GU Gancheng.Dam design[M]. Beijing:China Industry Press,1963:273-279.(in Chinese))
[3]
殷宗泽,朱 泓,吴 钰. 沪宁高速公路地基沉降有限元计算分析[J]. 水利水电科技进展,1998,18(2):22-26.(YIN Zongze,ZHU Hong,WU Yu. Finite element analysis of foundation settlement of Shanghai——Nanjing expressway embankment[J]. Advances in Science and Technology of Water Resources,1998,18(2):22-26.(in Chinese))
[4]
何兆益,周虎鑫. 高填方路堤填筑体沉降的三维有限元分析[J]. 重庆交通学院学报,2000,19(3):58-62.(HE Zhaoyi,ZHOU Huxin. 3D finite element analysis of subsidence on high embankment[J]. Journal of Chongqing Jiaotong Institute,2000,19(3):58-62.(in Chinese))
[5]
周汉荣. 土力学与地基基础[M]. 武汉:武汉工业大学出版社,1996:45-48.(ZHOU Hanrong. Soil mechanics and foundation[M]. Wuhan:Wuhan University of Technology Press,1996:45-48.(in Chinese))
[6]
王铁行,赵树德. 计算地基沉降分层总和法缺陷分析及其改进[J]. 西安建筑科技大学学报,1996,28(2):179-182.(WANG Tiehang,ZHAO Shude. Analysis and amendment of layer-wise summation methodfor calculation setting of ground[J]. Journal of Xi¢an University of Architecture andTechnology,1996,28(2):179-182.(in Chinese))
[7]
邓文龙,周正茂. 土的压缩模量Es的一种取值方法[J]. 工业建筑,1996,26(10):34-36.(DENG Wenlong,ZHOU Zhengmao. A calcultion method for soil modulus of compressibility(Es)[J]. Industrial Construction,1996,26(10):34-36.(in Chinese))
[8]
钱家欢,殷宗泽. 土工原理与计算[M]. 2版. 北京:中国水利水电出版社,1996:169-177.(QIAN Jiahuan,YIN Zongze. Geotextile principle in the calculation[M]. 2nd ed. Beijing:China Water Power Press,1996:169-177.(in Chinese))
[9]
CRAWFORDC B.Interpretationofthe consolidationtests[J].Journal of Soil Mechanics andFoundations Div,1964,90(5):87-102.
[10]
BJERRUML. Embankments on soft ground[C]// Proceedings of Spresial Conference on Performance of Earth and Earth-supported Structure. [S. l.]:ASCE,1972:1-54.