Abstract:Wuhan Labour Market Building is located at the west of Xinhua road,Hankou district,Wuhan. The geological conditions of the building foundation are very complicated and the pit is 8 meters deep. The design and construction process of the pit slope are introduced. It is pointed out that the keys of deep pit supported by shotcrete-bolt are construction according to the information,feasible design,and close cooperation between the excavation and the construction of shotcrete-bolt,and flexible management.
高 旗 李欢秋 袁培中 明治清. 中国武汉劳动力市场大楼深基坑边坡支护设计与施工[J]. 岩石力学与工程学报, 2002, 21(06): 919-922.
Gao Qi1, Li Huanqiu2, Yuan Peizhong2, Min Zhiqing2. DESIGN AND CONSTRUCTION OF THE DEEP PIT SLOPE FOR WUHAN LABOUR MARKET BUILDING IN CHINA. , 2002, 21(06): 919-922.