[1] 刘 钊. 双排支护桩结构的分析及试验研究[J]. 岩土工程学报,1992,14(5):76–80.(LIU Zhao. Study of analysis and test of retaining structure with double-row piles[J]. Chinese Journal of Geotechnical Engineering,1992,14(5):76–80.(in Chinese))
[2] 何颐华,杨 斌,金宝森,等. 双排护坡桩试验与计算的研究[J]. 建筑结构学报,1996,17(2):58–66.(HE Yihua,YANG Bin,JIN Baosen,et al. A study of the test and calculation of double-row fender piles[J]. Journal of Building Structures,1996,17(2):58–66.(in Chinese))
[3] 郑 刚,李 欣,刘 畅,等. 考虑桩土相互作用的双排桩分析[J]. 建筑结构学报,2004,25(1):99–106.(ZHENG Gang,LI Xin,LIU Chang,et al. Analysis of double-row piles in consideration of the pile-soil interaction[J].Journal of Building Structures,2004,25(1):99–106.(in Chinese))
[4] 黄 凭,莫海鸿,陈俊生. 双排桩支护结构挠曲理论分析[J]. 岩石力学与工程学报,2009,28(增2):3 870–3 875.(HUANG Ping,MO Haihong,CHEN Junsheng. Theoretical analysis of double-row piles retaining structure deflection[J]. Chinese Journal of Rock Mechanics and Engineering,2009,28(Supp.2):3 870–3 875.(in Chinese))
[5] 中华人民共和国行业标准编写组. JGJ120—99建筑基坑支护技术规程[S]. 北京:中国建筑工出版社,1999.(The Professional Standards Compilation Group of People¢s Republic of China. JGJ120—99 Technical specification for retaining and protection of building foundation excavations[S]. Beijing:China Architecture and Building Press,1999.(in Chinese))
[6] 杨 晶. 双排桩支护结构的数值分析[硕士学位论文][D]. 天津:天津大学,2003.(YANG Jing. The numerical analysis of retaining structure with double-row piles[M. S. Thesis][D]. Tianjin:Tianjin University,2003.(in Chinese))
[7] 高大钊. 深基坑工程[M]. 北京:机械工业出版社,1999:76.(GAO Dazhao. Engineering of deep foundation excavations[M]. Beijing:China Machine Press,1999:76.(in Chinese))
[8] 胡人礼. 桥梁桩基础分析和设计[M]. 北京:中国铁道出版社,1987:90–92.(HU Renli. Analysis and design for pile foundation of bridge[M]. Beijing:China Railway Publishing House,1987:90–92.(in Chinese))
[9] 刘国彬,王卫东. 基坑工程手册[M]. 2版. 北京:中国建筑工业出版社,2009:1 118.(LIU Guobin,WANG Weidong. Handbook for foundation pit engineering[M]. 2nd ed. Beijing:China Architecture and Building Press,2009:1 118.(in Chinese))