|
|
Stress and deformation of self-anchored reinforcement structures for landslide tunnels |
YIN Jing1,DENG Ronggui1,LI Kaitian1,CHEN Bajin1,SUN Chunping2 |
(1. School of Civil Engineering,Southwest Jiaotong University,Chengdu,Sichuan 610031,China;2. China Construction Underground Space Co.,Ltd.,Chengdu,Sichuan 610081,China) |
|
|
Abstract The self-anchored strengthening structure was put forward to solve the reinforcement issue of tunnels located in the deep landslide,in this paper,stress and deformation of the entire reinforcing structure under the interaction of landslide soil were studied. A physical and mechanical calculation model was established and the matrix transfer method was adopted to establish the calculation formulas of internal force and deformation. The internal force and displacement distribution characteristics of the reinforced structure were obtained by MTLAB programming calculation. Numerical simulation calculation and model test were carried out to verify the theoretical results. The results indicate that:(1) The anti-slide sustaining pile and anchor can control the displacement of the tunnel well and improve the stress state of the tunnel;(2) In the design, the angle between the anchor cable and horizontal plane should be minimized,and the design anchor force values in the scope of the landslide boundary should be increased;(3) The internal force and deformation results of numerical simulation calculation and physical model test are in good agreement with the theoretical calculation results,which verify the correctness of the theoretical calculation method.
|
|
|
|
|
[1] |
伍 林,郑忠勤,丁 杨. 内昆线冷家坡2号隧道进口段山体变形的综合整治[J]. 路基工程,1999,(6):50-52.(WU Lin,ZHENG Zhongqin,DING Yang. Deformation comprehensive improvement of Lengjiapo No. 2 tunnel entrance slope[J]. Subgrade Engineering,1999,(6):50-52.(in Chinese))
|
[2] |
任立志. 龙洞湾隧道进口病害及其处理[J]. 世界隧道,2000,(3):50-53.(REN Lizhi. Cause of Disease and Treatment Measures for the Portal of Longdongwan Tunnel[J]. World Tunnel,2000,(3):50-53.(in Chinese))
|
[3] |
汪晓峰,黄绍槟. 四川西-攀高速公路山神庙隧道进口滑坡综合治理[J]. 中国地质灾害与防治学报,2007,18(4):15-18.(WANG Xiaofeng,HUANG Shaobin. Comprehensive restraint works of landslide hazard at Shanshenmiao tunnel entrance on Xichang-Panzhihua Expressway in Sichuan Province[J]. The Chinese Journal of Geological Hazard and Control,2007,18(4):15-18.(in Chinese))
|
[4] |
杨小刚,彭家贵,龚熙维,等. 叙大铁路佘家坡隧道洞口滑坡综合治理[J]. 路基工程,2012,(5):183-186.(YANG Xiaogang,PENG Jiagui,GONG Xiwei,et al. Comprehensive treatment on landslide at the entrance of Shejiapo Tunnelon Xuyong—Gulin railway[J]. Subgrade Engineering,2012,(5):183-186.(in Chinese))
Your browse does not support frame! | | | |