[1] |
YOO W,KIM B,CHO W. Model test study on the behavior of geotextile-encased sand pile in soft clay ground[J]. KSCE Journal of Civil Engineering,2015,19(3):592-601.
|
[2] |
刘亚平. 海上CDM施工中的几个技术问题[J]. 中国港湾建设. 2009,(4):42-45.(LIU Yaping. Technical problems for the constructionof maritimeCDM method[J]. China Harbour Engineering,2009,(4):42-45.(in Chinese))
|
[3] |
林 鸣,梁 桁,刘晓东,等. 海上挤密砂桩工法及其在港珠澳大桥岛隧工程的应用[J]. 中国港湾建设,2012,21(4):72-77.(LIN Ming,LIANG Heng,LIU Xiaodong,et al. Method for construction of off-shore sand compaction piles and its application for island and tunnel project for Hong Kong—Zhuhai—Macao bridge[J]. China Harbour Engineering,2012,21(4):72-77.(in Chinese))
|
[4] |
HEO Y,JEONG G C,BAE W S. Evaluation of the effect of penetration ratios on composite grounds improved with sand compaction piles[J]. Marine Georesources andGeotechnology,2015,33(3):253-263.
|
[5] |
HUGHES J M O. Reinforcing of soft cohesive soils with stone columns[J]. Ground Engineering,1974,7(3):42-49.
|
[1] |
龚晓南. 复合地基理论及工程应用[M]. 中国建筑工业出版社, 2007:56-57.(GONG Xiaonan. Theory of composite foundations and engineering applications[M]. Beijing:China Architecture and Building Press,2007:56-57.(in Chinese))
|
[2] |
ABOSHI H,SUEMATSU N. The state of the art on sand compaction pile method[C]// Proceeding of the 3rd International Geotechnical Seminer,Soil Improvement Methods. [S. l.]:[s. n.],1985:76-83.
|
[3] |
国際臨海開発研究センター. Technical standards and commentaries for port and harbour facilities in Japan[M]. [S. l.]:The Overseas Coastal Area Development Institute of Japan,2002:529-537.
|
[4] |
KIM S S,SHIN H Y,HAN S J,et al. Estimation of stress con-centration characteristics in composite ground reinforced by sand compaction piles with a low replacement ratio[C]// The 16th International Offshore and Polar Engineering Conference. International Society of Offshore and Polar Engineers. [S. l.]:[s. n.],2006:11-19.
|
[5] |
解林博,许 浩,陈运涛,等. 海上构筑物地基自动监测系统在深水中的密封保护措施[J]. 中国港湾建设,2013,(2):40-43.(XIE Linbo,XU Hao,CHEN Yuntao,et al. Seal protection measures for foundation automatic monitoring system in deep water offshore structures[J]. China Harbour Engineering,2013,(2):40-43.(in Chinese))
|
[6] |
中交天津港湾工程研究院有限公司. 具有水下无线传输系统的海上构筑物自动监测技术方法[P]. 中国:ZL201010149403.4. 2011-07-27.(Tianjin Port Engineering Institute,China CommunicationsConstruction Company Limited. A wireless and automatic method for underwater offshore structures monitoring[P].China:ZL201010149403.4.2011-07-27.(in Chinese))
|
[7] |
魏汝龙. 从实测沉降过程推算固结系数[J]. 岩土工程学报. 1993,15(2):12-19.(WEI Rulong. Derivation for Coefficient of Consolidationfrom Settlement Observation[J]. Chinese Journal of Geotechnical Engineering,1993,15(2):12-19.(in Chinese))
|
[8] |
宰金珉,梅国雄. 全过程的沉降量预测方法研究[J]. 岩土力学,2000,21(4):322-325.(ZAI Jinmin,MEI Guoxiong. Forecast method of settlement during the complete process of construction and operation[J].Rock and Soil Mechanics,2000,21(4):322-325.(in Chinese))
|
[9] |
梅国雄,宰金珉,赵维炳,等. 沉降-时间曲线形态的证明及其应用[J]. 南京工业大学学报:自然科学版,2003,(4):6-9.(MEI Guoxiong,ZAI Jinmin,ZHAO Weibing,et al. Proof of S-tcurve appearing S shape and its application[J]. Journal of Nanjing University of Technology:Natural Science,2003,(4):6-9.(in Chinese))
|
[10] |
王志亮,黄景忠,李永池. 沉降预测中的Asaoka法应用研究[J]. 岩土力学,2006,27(11):2 025-2 028.(WANG Zhiliang,HUANG Jingzhong, LI Yongchi. Study on application of Asaoka¢s method to settlement prediction[J]. Rock and Soil Mechanics,2006,27(11):2 025-2 028.(in Chinese))
|
[11] |
ASAOKA A. Observational procedure of settlement prediction[J]. Soils andFoundations,1978,18(4):87-101.
|
[12] |
潘林有,谢新宇. 用曲线拟合的方法预测软土地基沉降[J]. 岩土力学,2004,25(7):1 053-1 058.(PAN Linyou,XIE Xinyu. Observational settlement prediction by curve fitting methods[J]. Rock and Soil Mechanics,2004,25(7):1 053-1 058.(in Chinese))
|
[13] |
王延宁,蒋斌松,胥新伟,等. 挤密砂桩加固水下软土大型原位载荷试验研究[J]. 岩土力学,2015,36(增1):320-326.(WANG Yanning,JIANG Binsong,XU Xinwei,et al. Experiment study of underwater sand compaction pile composite ground based on in-situ load test[J]. Rock and Soil Mechanics,2015,36(Supp.1):320-326. (in Chinese))
|
[14] |
中交第四航务工程勘察设计院有限公司,中交公路规划设计院.港珠澳大桥主体工程岛隧工程沉管隧道基础工程(E1~E6-S2)[R].广州:中交第四航务工程勘察设计院有限公司,2012.(CCCC-FHDI ENGINEERING Co.,Ltd.,CCCC Highway Consultants Co.,Ltd.. Main construction ofHong Kong-Zhuhai-Macau Bridge Island and tunnel detail design(E1~E6-S2)[R]. Guangzhou:CCCC FHDI,2012.(in Chinese))
|
[15] |
AHN J,KIM Y. Consolidation behavior and stress concentration ratio of SCP composite ground[J]. Marine Georesourcesand Geotechnology,2012,30(1):63-85.
|