Abstract Taking the karst foundation problem with 10 km long tunnel in Tianshengqiao No. 2 Hydropower Sta2 tion for an example , the geology condition , engineering geology problem and t reatment method of the karst foun2 dation are presented.
|
Received: 11 November 1999
|
|
|
|