MONITORING DURING THE ACCESS CONSTRUCTION OF YANGPENG RIGHT TUNNEL
Xu Linsheng 1,Sun Jun 2,Jiang Shuping 3
(1 Institute of Tunnel,Bridge and Stucture Engineering,Chongqing Communication University,Chongqing 400074 China) (2 Geotechnological Engineering Institute,Tongji University,Shanghai 200092 China) (3 Chongqing Highway Institute of Communication Ministry,Chongqing 400067 China)
Abstract The site monitoring was made during the access construction of Yangpeng right tunnel with CRD excavation method. By means of the monitoring and detailed analysis for each construction stage,feedback controlling design is realized and the construction is controlled.