| ESTABLISHMENT OF REASONABLE LAGGED TIME FOR LANEWAY REINFORCED BY GROUTING |
| Qiao Weiguo', Ouglianitsa A B²,Perchine B B² |
| ('Shandong Umiversity ofScienceand Technology, Taian 271019 China) (Kuzbas Sate Technical Universiy,Kemerovo 650026 Rusia) |
|
|
|
|
Abstract Based on the theoretical analysis and testing studies, the relationship between the fracture coefficients of surrounding rocks and the peripheral displacements of the laneway is set up. The theory and method of the grouting bolt are also put forward, which can be used as a instrument of lagged time for directing grouting.Furthermore, the reasonable range of fracture coefficient of surrounding rocksat the beginning of grouting is examined,and the nomogram of the displacement oflaneway profile is determined.
|
|
|
|
|
|
|
1 华心锐,吕凡任,谢广祥.锚注软岩巷道流变研究[J].岩石力学与工程学报,2003,22(2)
2 贺永年,张农,扬米加,戴标兵. 巷道滞后注浆加固与滞后时间分析[J].煤炭学报,1996,21(3)
3 Хямяляйнен В.А., Угляница А.В. Цементация слоистых пород. Кемерово: КузГТУ,2000
4 Вылегжанин В.Н., Егоров П.В., Мурашов В.И. Структурные модели горного массива в механизме геомеханических процессов. Новосибирск: Наука, Сиб. Отд-ние.1990
5 Луганцев Б.Б. Исследование процесса образования трещин в породах, вмещающих выемочные выработки, с использованием фрактальных моделей. Уголь,1996.12
|
| [1] |
CHEN Weizhong1*, LIU Xinyu1, 2, YANG Jianping1, WANG Wei1, 2, ZANG Zhonghai3, DING Hongyuan3, ZHANG Zheyuan3, WANG Xiaogang3, SHI Zhengrong1. Development of a large-scale 3D physical model test system for underground energy storage caverns and its model experimental study[J]. , 2026, 45(6): 1615-1628. |
|
|
|
|