| STUDY OF GROUTING UPLIFTING FOR EXISTING BUILDINGS TRAVERSED BY TUNNEL AND ITS APPLICATION |
| PENG Zhengyong |
| (China Railway Tunnel Stock Co.,Ltd.,Luoyang,Henan 471000,China) |
|
|
|
|
Abstract Subsurface excavation tunnel at Punan section of phase I project of Xiamen airport road is a shallow-buried,large-span and soft rock tunnel,the surrounding construction environment is complex. Building #34 is a key protection object during tunnel traverses buildings. According to the structures,foundation rocks and surrounding environment of building #34,the ground tracking grouting method is adopted to protect buildings during construction by systematically analyzing the reliabilities and operabilities of various building protection schemes. The sleeve valve pipe grouting is adopted for building #34 according to grouting test results of buildings #104,#105. Monitoring points of building subsidence and crack development have been set in order to control the subsidence and crack development of building #34 and guide the construction timely. Monitoring results show that grouting uplift can control houses subsidence effectively. Finally,the total subsidence value of each monitoring point is controlled within 25 mm;the differential subsidence of each monitoring point is controlled within 1‰. The building #34 structures are in control state when tunnel traverses. Therefore,the grouting uplifting is a very important method to protect existing buildings traversed by tunnel. This study results will provide some references for similar tunnel projects.
|
|
Received: 04 March 2010
|
|
|
|
| [1] 李 浩,王 涛,徐日庆. 隧道施工对框架结构及地表位移影响的数值分析[J]. 铁道工程学报,2008,(9):58–61.(LI Hao,WANG Tao,XU Riqing. Numerical analysis of the influence of tunneling on ground movement and adjacent frame structure[J]. Journal of Railway Engineering Society,2008,(9):58–61.(in Chinese))
[2] 卿伟宸,廖红建,钱春宇. 地下隧道施工对相邻建筑物及地表的沉降的影响[J]. 地下空间与工程学报,2005,1(6):960–963.(QING Weichen,LIAO Hongjian,QIAN Chunyu. The effect construction on the settlements of adjacent building and earth surfaces of underground tunnel[J]. Chinese Journal of Underground Space and Engineering,2005,1(6):960–963.(in Chinese))
[3] 施成华,彭立敏,刘宝琛. 浅埋隧道开挖对地表建筑物的影响[J]. 岩石力学与工程学报,2004,23(19):3 310–3 316.(SHI Chenghua,PENG Limin,LIU Baochen. Influence of shallow tunnel excavation on ground surface buildings[J]. Chinese Journal of Rock Mechanics and Engineering,2004,23(19):3 310–3 316.(in Chinese))
[4] 李会军,王连英. ANSYS在建筑物平移中的应用[J]. 山西建筑,2006,32(2):67–69.(LI Huijun,WANG Lianying. ANSYS application in the building monolithic moving[J]. Shanxi Architecture,2006,32(2):67–69.(in Chinese))
[5] 唐小军,宋晓玲. 我国建筑物整体移位研究现状及需解决的问题[J]. 工业建筑,2005,(增1):834–836.(TANG Xiaojun,SONG Xiaoling. Research actualities of building monolithic movement and unsolved problems in China[J]. Industrial Construction,2005,(Supp.1):834–836.(in Chinese))
[6] 王彦臻,黄 达,李 峰. 城市地铁穿越既有线路的变形控制技术及效果[J]. 城市轨道交通,2009,22(6):46–49.(WANG Yanzhen,HUANG Da,LI Feng. Techniques of deformation control for subway to traverse existing railway line[J]. Urban Rapid Rail Transit,2009,22(6):46–49.(in Chinese))
[7] 李敏珠,申利剑. 建筑物迫降纠倾的施工监测与控制[J]. 工程勘察,2002,(3):41–42.(LI Minzhu,SHEN Lijian. Monitoring and control on construction to rectify tilt of building[J]. Geotechnical Investigation and Surveying,2002,(3):41–42.(in Chinese))
[8] 谷 丰. 纠倾加固技术在绍兴城区倾斜建筑物中的应用[硕士学位论文][D]. 杭州:浙江大学,2006.(GU Feng. Application of rectification and reinforcement technology on buildings of tilt in Shaoxing City[M. S. Thesis][D]. Hangzhou:Zhejiang University,2006.(in Chinese))
[9] 李 韬,高大钊. 上海某住宅楼降水法纠倾[J]. 工程勘察,2004,(1):39–42.(LI Tao,GAO Dazhao. Rectification of building by well pumping technique in Shanghai[J]. Geotechnical Investigation and Surveying,2004,(1):39–42.(in Chinese))
[10] 李宏韬,张永峰. 地铁穿越城市既有建筑物时托换技术的应用[J]. 铁道建筑,2007,(1):37–39.(LI Hontao,ZHANG Yongfeng. Application of underpinning technology in construction of metro tunnel through urban existing structure?s foundation[J]. Railway Engineering,2007,(1):37–39.(in Chinese))
[11] 丁红军,王 琪,蒋盼平. 地铁盾构隧道桩基托换施工技术研究[J]. 隧道建设,2008,28(2):209–212.(DING Hongjun,WANG Qi,JIANG Panping. Pile foundation underpinning technology applied in construction of shield-bored tunnels[J]. Tunnel Construction,2008,28(2):209–212.(in Chinese))
[12] 关继发,房 倩,王振飞. 北京直径线暗挖段穿越既有建筑物风险控制[J]. 岩土工程界,2008,11(8):50–53.(GUAN Jifa,FANG Qian,WANG Zhenfei. Risk control to traverse existing building on Beijing diameter wire tunneling[J]. Geotechnical Engineering World,2008,11(8):50–53.(in Chinese))
[13] 唐智伟,赵成刚,张顶立. 地下工程抬升注浆设计方法及其抬升效果预测研究[J]. 土木工程学报,2007,40(8):79–84.(TANG Zhiwei,ZHAO Chenggang,ZHANG Dingli. Design of displacement grouting and prediction of the effect for construction of underground structures[J]. China Civil Engineering Journal,2007,40(8):79–84.(in Chinese))
[14] 侯艳娟,张顶立. 浅埋大跨隧道穿越复杂建筑物安全风险分析及评估[J]. 岩石力学与工程学报,2007,26(增2):3 718–3 726.(HOU Yanjuan,ZHANG Dingli. Safety risk analysis and assessment of complex buildings in shallow-buried large-span tunnel construction[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(Supp.2):3 718–3 726.(in Chinese))
[15] 张顶立,李鹏飞,侯艳娟,等. 浅埋大断面软岩隧道施工影响下建筑物安全性控制的试验研究[J]. 岩石力学与工程学报,2009,28(1):96–102.(ZHANG Dingli,LI Pengfei,HOU Yanjuan,et al. Experimental study on safety control of buildings during construction of shallow- buried soft rock tunnel with large-section[J]. Chinese Journal of Rock Mechanics and Engineering,2009,28(1):96–102.(in Chinese))
[16] 逄铁铮. 全程注浆在隧道穿越既有建筑物中试验研究[J]. 岩土力学,2008,29(12):3 451–3 458.(PANG Tiezheng. Experimental study of whole process grouting used in tunnel passing through existing structures[J]. Rock and Soil Mechanics,2008,29(12):3 451–3 458. (in Chinese))
[17] 应金星. 袖阀管注浆加固设计与施工工艺研究[J]. 吉林水利,2009,(7):22–26.(YING Jinxing. The design of sleeve valve pipe grouting reinforcement and research of construction technique[J]. Jilin Water Resources,2009,(7):22–26.(in Chinese)) |
| [1] |
MAO Yuting1, 2, HE Manchao1, 2, LIU Fangzhou3, BAI Xing4, YANG Xiaojie1, 2, TAO Zhigang1, 2*. Development and application of a large-scale physical model system for tunnel creep testing[J]. , 2026, 45(6): 1627-1638. |
|
|
|
|