|
|
|
| MONITORING ANALYSIS OF FISSURE DEVELOPMENT EVOLUTION AND HEIGHT OF OVERBURDEN FAILURE OF HIGH TENSION FULLY-MECHANIZED CAVING MINING |
| ZHANG Yujun1,2,LI Fengming3 |
| (1. Coal Mininng and Designing Department,Tiandi Science and Technology Co.,Ltd.,Beijing 100013,China;2. Mining and Designing Branch,China Coal Research Institute,Beijing 100013,China;3. Tangshan Research Institute,China Coal Research Institute,Tangshan,Hebei 063012,China) |
|
|
|
|
Abstract Taking Wangpo mine as the experimental mining,by borehole flushing fluid leakage and drilling colour television system,the height of overburden failure caving and fissure development evolution are monitoring. And then,the digital analysis and similarity simulation experiment of fissure development evolution are carried out. The research results show as followings:(1) The overburden failure height of high tension fully mechanized caving mining Wangpo mining is from 94.00 m to 104.92 m. (2) The main distribution characteristic of rock fissure is that the evolution of fissure is mainly with the high angle even vertical to the rock strata;the fissure evolution amount is square increasing with the buried depth;and the fissure width is normal distribution approximately with the fissure amount. (3) The fissure cluster region focus on before and after the coal wall;and the fissure density distribution curves of overlying strata are high at both ends,low of the middle,such as saddle-shaped.
|
|
Received: 25 February 2010
|
|
|
|
| [1] 煤炭科学研究总院北京开采研究所. 煤矿地表移动与覆岩破坏规律及其应用[M]. 北京:煤炭工业出版社,1983:130–135.(Branch of Beijing Mining Institute,China Coal Research Institute. The application and law for ground surface movement and overburden failure in coal mine[M]. Beijing:China Coal Industry Publishing House,1983:130–135.(in Chinese))
[2] 王 岩,王路军,张兴华,等. 保护层开采后周围煤岩体采动裂隙分布规律的研究[J]. 煤矿安全,2008,(1):11–14.(WANG Yan,WANG Lujun,Zhang Xinghua,et al. Study on mining-induced fracture distribution of coal and rock mass near protective layer mined[J]. Safety in Coal Mines,2008,(1):11–14.(in Chinese))
[3] 张玉军,康永华. 覆岩破坏规律探测技术的发展及评价[J]. 煤矿开采,2005,10(2):10–12.(ZHANG Yujun,KANG Yonghua. The summarize and estimation of the development about the exploration of overburden failure law[J]. Coal Mining Technology,2005,10(2):10–12.(in Chinese))
[4] 国家煤炭工业局. 建筑物、水体、铁路及主要井巷煤柱留设与压煤开采规程[M]. 北京:煤炭工业出版社,2000:225–233.(State Coal Industry Bureau. Building,water body,railroad and main mine lane coal pillar with pressure mining engineering[M]. Beijing:China Coal Industry Publishing House,2000:225–233.(in Chinese))
[5] 钱鸣高,缪协兴. 采场上覆岩层结构的形态与受力分析[J]. 岩石力学与工程学报,1995,14(2):97–106.(QIAN Minggao,MIAO Xiexing. Theoretical analysis on the structural form and stability of overling strata in longwang mining[J]. Chinese Journal of Rock Mechanics and Engineering,1995,14(2):97–106.(in Chinese))
[6] 钱鸣高,许家林. 覆岩采动裂隙分布的“O”形圈特征研究[J]. 煤炭学报,1998,23(5):466–469.(QIAN Minggao,XU Jialin. Study on the “O Shape” circle distribution characteristics of mining induced fractures in the overlaying strata[J]. Journal of China Coal Society,1998,23(5):466–469.(in Chinese))
[7] 涂 敏,刘泽功. 煤体采动顶板裂隙发育研究与应用[J]. 煤炭科学技术,2002,30(7):54–56.(TU Min,LIU Zegong. Research and application of crack development in mining seam roof[J]. Coal Science and Technology,2002,30(7):54–56.(in Chinese))
[8] 宋选民. 潞安矿区构造裂隙分布特征的实测分析[J]. 矿山压力与顶板管理,2002,(3):101–104.(SONG Xuanmin. Observation of texture flaw distribution in Lu?an mining area[J]. Ground Pressure and Strata Control,2002,(3):101–104.(in Chinese))
[9] 张玉军,张华兴,陈佩佩. 覆岩及采动岩体裂隙场分布特征的可视化探测[J]. 煤炭学报,2008,(11):1 216–1 219.(ZHANG Yujun,ZHANG Huaxing,CHEN Peipei. Visual exploration of fissure field of overburden and rock[J]. Journal of China Coal Cociety,2008,(11):1 216–1 219.(in Chinese))
[10] 王旭锋,张东升,马立强,等. 封金权河下采煤覆岩采动裂隙分布特征的数值分析[J]. 矿业研究与开发,2008,(5):61–63.(WANG Xufeng,ZHANG Dongsheng,MA Liqiang,et al. Numerical analysis on distributing features of under-river mining induced fissures in overburden rocks[J]. Mining Research and Development,2008,(5):61–63.(in Chinese))
[11] 王连富,李卫东,刘道文,等. 综放采场覆岩破坏高度的实测方法及应用[J]. 矿业安全与环保,2005,(3):70–71.(WANG Lianfu,LI Weidong,LIU Daowen,et al. Actual measuring method of failure height of overburden stratum in a fully mechanized caving stope and its application[J]. Mining Safety and Environmental Protection,2005,(3):70–71.(in Chinese)) |
|
|
|