Citation Search Quick Search
  2013, Vol. 32 Issue (s2): 3486-3492    DOI:
Artiles Current Issue | Archive | Adv Search |
DIAGNOSING AND LOCATING OF DEEP OVERBURDEN STRUCTURAL PLANE AND WEAK INTERCALATED LAYERS TAKING WUDONGDE HYDROPOWER STATION DAM SITE AT DOWNSTREAM OF JINSHA RIVER FOR EXAMPLE
LI Huaqing1,GAN Fuping1,CHEN Yuling1,CHENG Zhanlin2,RAO Xibao2,XIAO Guoqiang2
(1. Institute of Karst Geology,Chinese Academy of Geological Sciences,Guangxi,Guilin 541004,China;2. Key Laboratory of Rock and Soil Mechanics and Engineering,Ministry of Water Resources,Yangtze River Scientific Research Institute,Wuhan,Hubei 430010,China)
Copyright © 2005-2015 Edited and Published by Editorial Office for Chinese Journal of Rock Mechanics and Engineering
Sponsored by : Chinese Society for Rock Mechanics and Engineering 
Published by : Science Press 
Address: Wuhan 430071, China  Tel: (027)87199250  Fax: (027)87199250  Email: rock@whrsm.ac.cn
DESIGNED BY: Beijing Magtech Science & Technolgy Development Co.,Ltd.
鄂公网安备 42010602003581号