|
[1] 国家电网公司. 青藏交直流联网工程介绍[EB/OL]. [2011-12-08]. http://www.sgcc.com.cn/xwzx/gsyw/gtgz/qcjzllwgc/bza/12/261314.shtml.(State Grid Corporation of China. A introduction of Qinghai—Tibet DC transmission line interconnection project[EB/OL]. [2011-12-08]. http://www.sgcc.com.cn/xwzx/gsyw/gtgz/qcjzllwgc/bza/12/261314.shtml.(in Chinese))
[2] 俞祁浩,刘厚建,钱 进,等. 青藏直流联网工程±500 kV输电线路的工程问题分析[J]. 工程地球物理学报,2009,6(6):806–812. (YU Qihao,LIU Houjian,QIAN Jin,et al. Research on frozen engineering of Qinghai—Tibet 500 kV DC power transmission line[J]. Chinese Journal of Engineering Geophysics,2009,6(6):806–812.(in Chinese))
[3] 马 巍,刘 端,吴青柏. 青藏铁路冻土路基变形监测与分析[J]. 岩土力学,2008,29(3):572–579.(MA Wei,LIU Duan,WU Qingbai. Monitoring and analysis of embankment deformation in permafrost regions of Qinghai—Tibet railway[J]. Rock and Soil Mechanics,2008,29(3):572–579.(in Chinese))
[4] 吴青柏,刘永智,童长江,等. 高原多年冻土地区公路工程地质研究[J]. 公路,2000,(2):1–4.(WU Qingbai,LIU Yongzhi,TONG Changjiang,et al. Highway engineering geological research in permafrost regions in the Tibetan plateau[J]. Highway,2000,(2):1–4.(in Chinese))
[5] 霍 明,陈建兵,朱东鹏,等. 青藏公路多年冻土区预警系统研究[J]. 岩土力学,2010,31(1):331–336.(HUO Ming,CHEN Jianbing,ZHU Dongpeng,et al. Study of early warning on roadbed diseases of Qinghai—Tibet highway in permafrost regions[J]. Rock and Soil Mechanics,2010,31(1):331–336.(in Chinese))
[6] CHENG G D. A roadbed cooling approach for the construction of Qinghai—Tibet Railway[J]. Cold Regions Science and Technology,2005,42(2):169–176.
[7] WU Q B,LIU Y Z,ZHANG J M,et al. A review of recent frozen soil engineering in permafrost regions along Qinghai—Tibet highway,China[J]. Permafrost and Periglacial Processes,2002,13(3):199–205.
[8] 刘厚健,程东幸,俞祁浩,等. 高海拔输电线路的冻土工程问题及对策研究[J]. 工程勘察,2009,(4):32–36.(LIU Houjian,CHEN Dongxing,YU Qihao,et al. Study on permafrost engineering problems and engineering countermeasure of transmission line[J]. Geotechnical Investigation and Surveying,2009,(4):32–36.(in Chinese))
[9] 吴青柏,刘永智,童长江,等. 寒区冻土环境与工程环境间的相互作用[J]. 工程地质学报,2000,8(3):281–287.(WU Qingbai,LIU Yongzhi,TONG Changjiang,et al. Interaction between frozen soil environment and engineering environment in cold regions[J]. Journal of Engineering Geology,2000,8(3):281–287.(in Chinese))
[10] 吴青柏,朱元林,刘永智. 人类工程活动下冻土环境变化评价模型[J]. 中国科学:D辑,2002,32(2):141–148.(WU Qingbai,ZHU Yuanlin,LIU Yongzhi. Evaluating model of frozen soil environment change under engineering actions[J]. Science in China:Series D,2002,32(2):141–148.(in Chinese))
[11] 盛 煜,马 巍,温 智. 青藏铁路高填方路基对下伏多年冻土热状况的影响[J]. 铁道工程学报,2003,(4):22–25.(SHENG Yu,MA Wei,WEN Zhi. Effect of high embankment on the thermal regime of underlying permafrost in Qinghai—Tibet railway[J]. Journal of Railway Engineering Society,2003,(4):22–25.(in Chinese))
[12] 温 智,盛 煜,吴青柏. 青藏铁路路基浅层地表热状态动态监测初步分析[J]. 岩石力学与工程学报,2003,22(增2):2664–2 668. (WEN Zhi,SHENG Yu,WU Qingbai. Dynamic monitoring of thermal state for shallow ground in Qinghai—Tibet railway embankment[J]. Chinese Journal of Rock Mechanics and Engineering,2003,22(Supp. 2):2 664–2 668. (in Chinese))
[13] 于 晖,吴青柏,刘永智. 青藏铁路多年冻土区工程长期监测系统[J]. 冰川冻土,2008,30(3):475–481.(YU Hui,WU Qingbai,LIU Yongzhi. The long-term monitoring system on permafrost regions along the Qinghai—Tibet railway[J]. Journal of Glaciology and Geocryology,2008,30(3):475–481.(in Chinese))
[14] 程国栋,吴青柏,马 巍. 青藏铁路主动冷却路基的工程效果[J]. 中国科学:E辑,2009,39(1):16–22.(CHENG Guodong,WU Qingbai,MA Wei. The engineering effect of active cooling roadbed of the Qinghai—Tibet railway[J]. Science in China:Series E,2009,39(1):16-22. (in Chinese))
[15] 俞祁浩,程国栋,牛富俊. 自动温控通风路基应用效果分析[J]. 岩石力学与工程学报,2004,23(24):4 221–4 228.(YU Qihao,CHENG Guodong,NIU Fujun. Effect analysis of auto-temperature-controlled ventilation roadbed[J]. Chinese Journal of Rock Mechanics and Engineering,2004,23(24):4 221–4 228.(in Chinese))
[16] 国家电网公司.青藏联网工程建设重要节点[EB/OL]. [2011-12-08]. http://www.sgcc.com.cn/xwzx/gsyw/gtgz/qcjzllwgc/tpxw/12/261348. shtml.(State Grid Corporation of China. The important construction nodes of Qinghai—Tibet DC Transmission Line Interconnection Project[EB/OL]. [2011-12-08]. http:// www. sgcc.com.cn/xwzx/gsyw/ gtgz/qcjzllwgc/tpxw/12/261348. shtml.(in Chinese))
[17] 人民网. 李克强出席青藏直流联网工程投入试运行仪式并会见建设者代表[EB/OL]. [2011-12-10]. http:// paper.people.com.cn/ rmrb/html/2011-12/10/nw.D110000renmrb_20111210_3-01.htm.(People. com.cn. LI Keqiang attended the Qinghai—Tibet DC Transmission Line Interconnection Project commissioning ceremony and meeting with the constructor representatives[EB/OL]. [2011-12-10]. http:// paper.people.com.cn/rmrb/html/2011-12/10/nw.D110000renmrb_20111210_3-01.htm.(in Chinese))
[18] CHENG G D,SUN Z Z,NIU F J. Application of the roadbed cooling approach in Qinghai—Tibet railway engineering[J]. Cold Regions Science and Technology,2008,53(3):241–258.
[19] MA W,CHENG G D,WU Q B. Construction on permafrost foundations:lessons learned from the Qinghai–Tibet railroad[J]. Cold Regions Science and Technology,2009,59(1):3–11.
[20] 四川省电力公司. 川电监理负责的青藏线热棒安装完成[EB/OL]. [2011-12-10].http://www.sgcc.com.cn/xwzx/gsyw/gtgz/qcjzllwgc/xwbd/01/261183.shtml.(Sichuan Electric Power Corporation. The installation of heat pipes supervisored by Chuandian supervision corporation in Qinghai—Tibet DC Transmission Line Interconnection Project has been completed[EB/OL]. [2011-12-10]. http://www.sgcc.com.cn/ xwzx/ gsyw/gtgz/qcjzllwgc/xwbd/01/261183.shtml.(in Chinese))
|