[1] |
贾金青,王海涛,涂兵雄,等.管棚力学行为的解析分析与现场测试[J].岩土力学,2010,31(6):1858-1864.(JIA Jinqing,WANG Haitao,TU Bingxiong,et al.Analytical approach and field monitoring for mechanical behaviors of pipe roof reinforcement[J].Rock and Soil Mechanics,2010,31(6):1858-1864.(in Chinese))
|
[2] |
梁庆国,李德武. 对岩土工程有限元强度折减法的几点思考[J]. 岩土力学,2008,29(11):3 053-3 058.(LIANG Qingguo,LI Dewu. Discussion on strength reduction FEM in geotechnical engineering[J]. Rock and Soil Mechanics,2008,29(11):3 053-3 058.(in Chinese))
|
[3] |
王海涛. 隧道管棚预支护体系的力学机制与开挖面稳定性研究[博士学位论文][D]. 大连:大连理工大学 2009.(WANG Haitao. Research onmechanism of pipe roof reinforcement and tunnel face stability[Ph. D. Thesis][D]. Dalian:Dalian University of Technology,2009.(in Chinese))
|
[4] |
OCAKI. Control ofsurface settlements with umbrella arch method in second stage excavations of Istanbul Metro[J]. Tunnelling and Underground Space Technology,2008,23(6):674-681.
|
[5] |
CHUNGSIKY.Finite-element analysis of tunnel face reinforced by longitudinal pipes[J]. Computers and Geotechnics,2002,29(1):73-94.
|
[6] |
XU L S,SUN J. Numerical simulation of dynamic emulation on CRD construction process in Yangpeng tunnel[J]. Journal of Geological Hazards and Environment Preservation,2001,12(1):58-63.
|
[7] |
BORMS B B,BENNEMRARK H. Stability of clay at vertical openings[J]. Journal of the Soil Mechanics and Foundations Division,1967,93(1):71-94.
|
[8] |
LECA E,DORMIEUX L . Upper and lower bound solutions for the face stability of shallow circular tunnels in frictional material[J]. Geotechnique,1990,40(4):581-606.
|
[9] |
JUNEJA A,HEGDE A,LEE F H,et al. Centrifuge modelling of tunnel face reinforcement using forepoling[J]. Tunnelling and UndergroundSpace Technology,2010,25(4):377-381.
|
[10] |
SHIN J H,CHOI Y K,KWON O Y,et al. Model testing for pipe-reinforced tunnel heading in a granular soil[J]. Tunnelling and Underground Space Technology,2008,23(3):241-250.
|
[11] |
李健,谭忠盛,喻渝,等. 浅埋下穿高速公路黄土隧道管棚变形监测及受力机制分析[J].岩石力学与工程学报,2011,30(增1):3002-3008.(LI Jian,TAN Zhongsheng,YU Yu,et al.Analysis of deformation monitoring and mechanical behaviors of big pipe-roof for shallow-buried large-span tunnel to underpass highway[J].Chinese Journal of Geotechnical Engineering,2011,30(Supp.1):3002-3008.(in Chinese))
|
[12] |
苟德明,阳军生,张 戈. 浅埋暗挖隧道管棚变形监测及受力机制分析[J].岩石力学与工程学报,2007,26(6):1 258-1 264.(GOU Deming,YANG Junsheng,ZHANG Ge.Deformationmonitoring and mechanical behaviors of pipe-roof in shallow tunnels[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(6):1 258- 1 264.(in Chinese))
|
[13] |
李 超. 浅埋暗挖隧道管棚作用机制及施工过程三维数值模拟[硕士学位论文][D]. 天津:天津大学,2010.(LI Chao.Mechanism of pipe-roof in shallow tunnels and 3D numerical simulation of construction procession[M. S. Thesis][D]. Tianjin:Tianjin University,2010.(in Chinese))
|
[14] |
中华人民共和国行业标准编写组. JTG F60—2009公路隧道施工技术规范[S]. 北京:人民交通出版社,2009.(The Professional Standards Compilation Group of People¢s Republic of China. JTG F60—2009 Technical specifications for construction of highway tunnel[S]. Beijing:China Communications Press,2009.(in Chinese))
|