Citation Search Quick Search
  2014, Vol. 33 Issue (11): 2210-2224    DOI: 10.13722/j.cnki.jrme.2014.11.006
Artiles Current Issue | Archive | Adv Search |
INITIAL 3D GEOSTRESS FIELD RECOGNITION OF HIGH GEOSTRESS FIELD AT DEEP VALLEY REGION AND CONSIDERATIONS ON UNDERGROUND POWERHOUSE LAYOUT
HUANG Shuling1,DING Xiuli1,LIAO Chenggang2,WU Aiqing1,YIN Jianmin1
(1. Key Laboratory of Geotechnical Mechanics and Engineering of Ministry of Water Resources,Yangtze River Scientific Research Institute,Wuhan,Hubei 430010,China;2. PowerChina Chengdu Engineering Corporation Limited,Chengdu,Sichuan 610072,China)
Copyright © 2005-2015 Edited and Published by Editorial Office for Chinese Journal of Rock Mechanics and Engineering
Sponsored by : Chinese Society for Rock Mechanics and Engineering 
Published by : Science Press 
Address: Wuhan 430071, China  Tel: (027)87199250  Fax: (027)87199250  Email: rock@whrsm.ac.cn
DESIGNED BY: Beijing Magtech Science & Technolgy Development Co.,Ltd.
鄂公网安备 42010602003581号