[1] |
袁 亮,刘满才. 淮南潘集矿区部分块段可缩小防水煤柱开采探讨[J]. 煤炭科学技术,1999,27(1):32-35.(YUAN Liang,LIU Mancai. Discussion on reducing waterproof pillaring on part block in Panji mining area[J]. Coal Science and Technology,1999,27(1):32-35. (in Chinese))
|
[2] |
张文艺,汪文革,彭卫东,等. 潘谢矿区缩小防水煤柱开采实践[J]. 煤炭学报,2002,27(2):128-133.(ZHANG Wenyi,WANG Wenge,PENG Weidong,et al. The coal mining practice of reducing waterproof coal pillars in Panxie mining area[J]. Journal of China Coal Society,2002,27(2):128-133.(in Chinese))
|
[3] |
李俊斌,杨 科,侯俊领,等. 潘北矿回采工作面提高上限的采煤方法论证分析[J]. 煤炭科学技术,2012,40(2):25-28.(LI Junbin,YANG Ke,HOU Junling,et al. Verification and analysis on upper limit increased coal mining method in coal mining face of Panbei mine[J]. Coal Science and Technology,2012,40(2):25-28.(in Chinese))
|
[4] |
熊晓英,李俊斌. 1402(3)综采工作面压架原因分析[J]. 中国煤炭地质,2004,16(3):34-37.(XIONG Xiaoying,LI Junbin. A case study of support break-off at 1402(3) fully mechanized mining face[J]. Coal Geology of China,2004,16(3):34-37.(in Chinese))
Your browse does not support frame! |