[2] |
UCHIDA K,WASA Y,KANAI M. Design of the shield tunnel for the trans-Tokyo bay highway[J]. Tunnelling and Underground Space Technology,1992,7(3):251–261.
|
[4] |
洪开荣,杜闯东,王坤. 广深港高速铁路狮子洋水下盾构隧道修建技术[J]. 中国工程科学,2009,11(7):53–58.(HONG Kairong,DU Chuangdong,WANG Kun. Construction technology of underwater shield tunnel in Guangzhou-Shenzhen-Hong Kong express rail link[J]. Engineering Sciences,2009,11(7),53–58.(in Chinese))
|
[6] |
朱合华,陶履彬. 盾构隧道衬砌结构受力分析的梁–弹簧系统模型[J]. 岩土力学,1998,19(2),19(2):26–32.(ZHU Hehua,TAO Lubin. Study on two Beam-Spring models for the numerical analysis of segments in shield tunnel[J]. Rock and Soil Mechanics,1998,19(2):26–32.(in Chinese))
|
[9] |
YAN Q X,YAO C F,YANG W B,et al. An Improved numerical model of shield tunnel with double lining and its applications[J]. Advances in Materials Science and Engineering,2015,15:1–15.
|
[12] |
LEE K M,GE X W. The equivalence of a jointed shield-driven tunnel lining to a continuous ring structure[J]. Canadian Geotechnical Journal,2001,38(3):461–483.
|
[14] |
黄伟明,王金昌,杨仲轩,等. 基于弹性地基曲梁理论的盾构隧道管片分析方法[J]. 浙江大学:工学版,2020,54(4):787–795.(HUANG Weiming,WANG Jinchang,XU Riqing,et al. Structural analysis of shield tunnel lining using the theory of curved beam resting on elastic foundation[J]. Journal of Zhejiang University:Engineering Science,2020,54(4):787–795.(in Chinese))
|
[1] |
姚超凡,晏启祥,何川,等. 一种改进的盾构隧道双层衬砌分析模型及其应用研究[J]. 岩石力学与工程学报,2014,33(1):80–89.(YAO Chaofan,YAN Qixiang,HE Chuan,et al. An improved analysis model for shield tunnel with double-layer lining and its applications[J]. Chinese Journal of Rock Mechanics and Engineering,2014,33(1):80–89.(in Chinese))
|
[7] |
LEE K M,HOU X Y,GE X W,et al. An analytical solution for a jointed shield-driven tunnel lining[J]. International Journal for Numerical and Analytical Methods in Geomechanics,2001,25(4):365–390.
|
[11] |
ZHAO C Y,ALIMARDANI L A,BARCIAGA T,et al. Prediction of tunnel lining forces and deformations using analytical and numerical solutions[J]. Tunnelling and Underground Space Technology,2017,64:164–176.
|
[3] |
钮新强. 南水北调中线工程穿黄隧洞关键技术研究[J]. 南水北调与水利科技,2009,7(6):42–46.(NIU Xinqiang. Research on key technology in Yellow River crossing tunnel construction of South to North Water Diversion middle route project[J]. South-to-North Water Transfers and Water Science and Technology,2009,7(6):42–46.(in Chinese))
|
[5] |
Working Group No.2,Ita.. Guidelines for the design of shield tunnel lining[J]. Tunnelling and Underground Space Technology,2000,15(3):303–331.
|
[8] |
张厚美,过迟,吕国梁. 盾构压力隧洞双层衬砌的力学模型研究[J]. 水利学报,2001,32(4):28–34.(ZHANG Houmei,GUO Chi,LU Guoliang. Mechanical model for shield pressure tunnel with secondary linings[J]. Journal of Hydraulic Engineering,2001,32(4):28–34.(in Chinese))
|
[10] |
EI NAGGAR H,HINCHBERGER S D. An analytical solution for jointed tunnel linings in elastic soil or rock[J]. Canadian Geotechnical Journal,2008,45(11):1 572–1 593.
|
[13] |
LIM C W,WANG C M,KITIPOMCHAI S. Timoshenko curved beam bending solutions in terms of Euler-Bernoulli solutions[J]. Archive of Applied Mechanics,1997,67(3):179–190.
|
[15] |
中华人民共和国国家标准编写组. GB50157—2003 地铁设计规范[S]. 北京:中国计划出版社,2003.(The National Standards Compilation Group of People/s Republic of China. GB50157—2003 Code for design of metro[S]. Beijing:China Planning Press,2003.(in Chinese))
|