| [2] | 
															 
														     冯永烜,王明恕. 全长锚固锚杆的工作机制[J]. 煤炭学报,1988,(2):31-42.(FENG Yongxuan,WANG Mingshu. Working mechanism of full-length anchor bolts[J]. Journal of China Coal Society,1988,(2):31-42.(in Chinese))
														     															 | 
																
 
																														
															| [4] | 
															 
														     王明恕. 全长锚固锚杆机理的探讨[J]. 煤炭学报,1983,(1):40-47.(WANG Mingshu. Exploration of the mechanism of full-length anchor bolts[J]. Journal of China Coal Society,1983,(1):40-47.(in Chinese))
														     															 | 
																
 
																														
															| [7] | 
															 
														     黄明华,周 智,欧进萍. 全长黏结式锚杆锚固段荷载传递机制非线性分析[J]. 岩石力学与工程学报,2014,33(增2):3 992-3 997. (HUANG Minghua,ZHOU Zhi,OU Jinping. Nonlinear analysis on load transfer mechanism of wholly grouted anchor rod along anchoring section[J]. Chinese Journal of Rock Mechanics and Engineering,2014,33(Supp.2):3 992-3 997.(in Chinese))
														     															 | 
																
 
																														
															| [9] | 
															 
														     白晓宇,张明义,朱 磊,等. 全长黏结GFRP抗浮锚杆界面剪切特性试验研究[J]. 岩石力学与工程学报,2018,37(6):1 407-1 418. (BAI Xiaoyu,ZHANG Mingyi,ZHU Lei,et al. Experimental study on shear characteristics of interface of full-bonding glass fiber reinforced polymer anti-floating anchors[J]. Chinese Journal of Rock Mechanics and Engineering,2018,37(6):1 407-1 418.(in Chinese))
														     															 | 
																
 
																														
															| [11] | 
															 
														     匡 政,白晓宇,张明义,等. 考虑锚固体不均匀及杆体脱黏效应的GFRP抗浮锚杆杆体荷载分布函数[J]. 岩石力学与工程学报,2019,38(6):1 158-1 171.(KUANG Zheng,BAI Xiaoyu,ZHANG Mingyi,et al. Load distribution function of GFRP anti-floating anchors considering the anchorage body unevenness and the anchor debonding effect[J]. Chinese Journal of Rock Mechanics and Engineering,2019,38(6):1 158-1 171.(in Chinese))
														     															 | 
																
 
																														
															| [13] | 
															 
														     YU S S,ZHU W C,NIU L L,et al. Experimental and numerical analysis of fully grouted long rock bolt load-transfer behavior[J]. Tunnelling and Underground Space Technology,2019,85(3):56-66.
														     															 | 
																
 
																														
															| [15] | 
															 
														     HAGEN S,LARSEN T,BERGHORST A,et al. Full-scale rockbolt testing in the laboratory:Analysis of recent results[J]. Journal of the Southern African Institute of Mining and Metallurgy,2020,120(1):1-6.
														     															 | 
																
 
																														
															| [16] | 
															 
														     WANG S R,WANG Y H,GONG J,et al. Failure mechanism and constitutive relation for an anchorage segment of an anchor cable under pull-out loading[J]. Acta Mechanica,2020,231(8):3 305-3 317.
														     															 | 
																
 
																														
															| [18] | 
															 
														     ZHANG W L,HUANG L,JUANG C H. An analytical model for estimating the force and displacement of fully grouted rock bolts[J]. Computers and Geotechnics,2020,117(1):1-10.
														     															 | 
																
 
																														
															| [20] | 
															 
														     YOKOTA Y,ZHAO Z Y,SHANG J L,et al. Effect of bolt configuration on the interface behaviour between a rock bolt and bond material:A comprehensive DDA investigation[J]. Computers and Geotechnics,2019,105(1):116-128.
														     															 | 
																
 
																														
															| [22] | 
															 
														     NIE W,GUO W,MA S Q,et al. Numerical modelling of fully grouted rockbolts subjected to shear load[J]. Rock Mechanics and Rock Engineering,2020,53(5):2 493-2 503.
														     															 | 
																
 
																														
															| [27] | 
															 
														     XUEYI S. Grouted rock bolt used in underground engineering in soft surrounding rock or in highly stressed regions[M]. London:Routledge,2021:93-99.
														     															 | 
																
 
																														
															| [29] | 
															 
														     LI D,LI Y,ZHU W. Analytical modelling of load-displacement performance of cable bolts incorporating cracking propagation[J]. Rock Mechanics and Rock Engineering,2020,53(8):3 471-3 483.
														     															 | 
																
 
																														
															| [31] | 
															 
														     LI D Q,MASOUMI H,SAYDAM S,et al. A constitutive model for load-displacement performance of modified cable bolts[J]. Tunnelling and Underground Space Technology,2017,68(9):95-105.
														     															 | 
																
 
																														
															| [33] | 
															 
														     ZHANG C Q,CUI G J,DENG L,et al. Laboratory Investigation on Shear Behaviors of Bolt-Grout Interface Subjected to Constant Normal Stiffness[J]. Rock Mechanics and Rock Engineering,2020,53(3):1 333-1 347.
														     															 | 
																
 
																														
															| [38] | 
															 
														     林 健,石 垚,孙志勇,等. 端部锚固锚杆预应力场分布特征的大型模型试验研究[J]. 岩石力学与工程学报,2016,35(11):2 237- 2 247.(LIN Jian,SHI Yao,SUN Zhiyong,et al. Large scale model test on the distribution characteristics of the prestressed field of end-anchored bolts[J]. Chinese Journal of Rock Mechanics and Engineering,2016,35(11):2 237-2 247.(in Chinese))
														     															 | 
																
 
																														
															| [23] | 
															 
														     SINGH P,SPEARING A J S,JESSU K. Analysis of the combined load behaviour of rock bolt installed across discontinuity and its modelling using FLAC3D[J]. Geotechnical and Geological Engineering,2020,38(6):5 867-5 883.
														     															 | 
																
 
																														
															| [25] | 
															 
														     FARMER I W. Stress distribution along a resin grouted rock anchor[J]. International Journal of Rock Mechanics and Mining Sciences and Geomechanics Abstracts,1975,12(11):347-351.
														     															 | 
																
 
																														
															| [26] | 
															 
														     HAWKES J,EVANS R. Bond stresses in reinforced concrete columns and beams[J]. Journal of the Institute of Structural Engineers,1951,24(10):323-327.
														     															 | 
																
 
																														
															| [28] | 
															 
														     LI C,STILLBORG B. Analytical models for rock bolts[J]. International Journal of Rock Mechanics and Mining Sciences,1999,36(8):1 013-1 029.
														     															 | 
																
 
																														
															| [32] | 
															 
														     CHE N,WANG H,JIANG M. DEM investigation of rock/bolt mechanical behaviour in pull-out tests [J]. Particuology,2020,52(10):10-27.
														     															 | 
																
 
																														
															| [34] | 
															 
														     LIN H,SUN P H,CHEN Y F,et al. Shear behavior of bolt-reinforced joint rock under varying stress environment[J]. Geotechnical and Geological Engineering,2020,38(6):5 755-5 770.
														     															 | 
																
 
																														
															| [36] | 
															 
														     王 斌,宁 勇,冯 涛,等. 单轴压缩条件下锚杆影响脆性岩体破裂的细观机制[J]. 岩土工程学报,2018,40(9):1 593-1 600. (WANG Bin,NING Yong,FENG Tao,et al. Meso-mechanism of rock failure influenced by bolt anchorage under uniaxial compression loading[J]. Chinese Journal of Geotechnical Engineering,2018,40(9):1 593-1 600.(in Chinese))
														     															 | 
																
 
																														
															| [37] | 
															 
														     刘泉声,雷广峰,彭星新,等. 锚杆锚固对节理岩体剪切性能影响试验研究及机制分析[J]. 岩土力学,2017,38(增1):27-35.(LIU Quansheng,LEI Guangfeng,PENG Xingxin,et al. Experimental study and mechanism analysis of influence of bolt anchoring on shear properties of jointed rock mass[J]. Rock and Soil Mechanics,2017,38(Supp.1):27-35.(in Chinese))
														     															 | 
																
 
																														
															| [39] | 
															 
														     周 辉,徐荣超,张传庆,等. 预应力锚杆锚固止裂效应的试验研究[J]. 岩石力学与工程学报,2015,34(10):2 027-2 037.(ZHOU Hui,XU Rongchao,ZHANG Chuanqing,et al. Experimental study of crack prevention effect of pre-stressed bolt anchoring[J]. Chinese Journal of Rock Mechanics and Engineering,2015,34(10):2 027- 2 037.(in Chinese))
														     															 | 
																
 
																														
															| [40] | 
															 
														     中华人民共和国国家标准编写组. GB/T 35056—2018煤矿巷道锚杆支护技术规范[J]. 北京:国家市场监督管理总局,中国国家标准化管理委员会,2018.(The National Standards Compilation Group of People?s Republic of China. GB/T 35056—2018 Technical specification for coal mine roadway anchor support[J]. Beijing:State Administration of Market Supervision and Administration,China National Standardization Administration Committee,2018.(in Chinese))
														     															 | 
																
 
																														
															| [1] | 
															 
														     康红普. 煤矿巷道支护与加固材料的发展及展望[J]. 煤炭科学技术,2021,49(4):1-11.(KANG Hongpu. Development and prospects of support and reinforcement materials for coal mine roadways[J]. Coal Science and Technology,2021,49(4):1-11.(in Chinese))
														     															 | 
																
 
																														
															| [24] | 
															 
														     JEREMIC M L,DELAIRE G J P. Failure mechanics of cable bolt systems[J]. CIM Bulletin,1983,76(856):66-71.
														     															 | 
																
 
																														
															| [35] | 
															 
														     许 磊. 锚杆锚索预应力全长锚固技术的实践[J]. 山东煤炭科技,2019,26(9):44-56.(XU Lei. Practice of the full-length pre-stressed anchorage support technology of bolt and cable[J]. Shandong Coal Technology,2019,26(9):44-56.(in Chinese))
														     															 | 
																
 
																														
															| [3] | 
															 
														     王明恕,何修仁,郑雨天. 全长锚固锚杆的力学模型及其应用[J]. 金属矿山,1983,(4):24-29.(WANG Mingshu,HE Xiuren,ZHENG Yutian. Mechanical model of full-length anchor bolts and its application[J]. Metal Mine,1983,(4):24-29.(in Chinese))
														     															 | 
																
 
																														
															| [30] | 
															 
														     PRICE D G. Engineering geology:principles and practice[M]. Berlin:Springer Science and Business Media,2008:53-55.
														     															 | 
																
 
																														
															| [5] | 
															 
														     HE L,AN X M,ZHAO Z Y. Fully grouted rock bolts:an analytical investigation[J]. Rock Mechanics and Rock Engineering,2015,48(3):1 181-1 196.
														     															 | 
																
 
																														
															| [6] | 
															 
														     MA S Q,ZHAO Z Y,NIE W,et al. An analytical model for fully grouted rockbolts with consideration of the pre-and post-yielding behavior[J]. Rock Mechanics and Rock Engineering,2017,50(11):3 019-3 028.
														     															 | 
																
 
																														
															| [8] | 
															 
														     董旭光,马子涵,李 峥,等. 锚固力损失与岩土体时效变形耦合模型研究[J]. 岩石力学与工程学报,2022,41(6):1-10.(DONG Xuguang,MA Zihan,LI Zheng,et al. Study on coupling model of anchorage force loss and time-dependent deformation of rock-soil mass[J]. Chinese Journal of Rock Mechanics and Engineering,2022,41(6):1-10. (in Chinese))
														     															 | 
																
 
																														
															| [10] | 
															 
														     周世昌,朱万成,于水生. 基于双指数剪切滑移模型的全长锚固锚杆荷载传递机制分析[J]. 岩石力学与工程学报,2018,37(增2): 3 817-3 825.(ZHOU Shichang,ZHU Wancheng,YU Shuisheng. Analysis of load transfer mechanism for fully grouted rockbolts based on the bi-exponential shear-slip model[J]. Chinese Journal of Rock Mechanics and Engineering,2018,37(Supp.2):3 817-3 825.(in Chinese))
														     															 | 
																
 
																														
															| [12] | 
															 
														     TISTEL J,GRIMSTAD G,EIKSUND G. Testing and modeling of cyclically loaded rock anchors[J]. Journal of Rock Mechanics and Geotechnical Engineering,2017,9(6):1 010-1 030.
														     															 | 
																
 
																														
															| [14] | 
															 
														     FENG X W,XUE F,WANG T Z,et al. Reinforcing effects of 3D printed bolts on joint-separated standard soft rock specimens[J]. Composites Part B-Engineering,2020,193(7):1-14.
														     															 | 
																
 
																														
															| [17] | 
															 
														     XU X L,TIAN S C. Load transfer mechanism and critical length of anchorage zone for anchor bolt[J]. Plos One,2020,15(1):1-15.
														     															 | 
																
 
																														
															| [19] | 
															 
														     KOMURLU E,DEMIR S. Length effect on load bearing capacities of friction rock bolts[J]. Periodica Polytechnica-Civil Engineering,2019,63(3):718-725.
														     															 | 
																
 
																														
															| [21] | 
															 
														     MOHAMED K,RASHED G,RADAKOVIC-GUZINA Z. Loading characteristics of mechanical rib bolts determined through testing and numerical modeling[J]. International Journal of Mining Science and Technology,2020,30(1):17-24.
														     															 |