Citation Search Quick Search
  2026, Vol. 45 Issue (10): 2875-2891    DOI: 10.3724/1000-6915.jrme.2025.0806
Artiles Current Issue | Archive | Adv Search |
Stability treatment system and its application for high-steep engineered slopes in large-scale hydropower projects in Southwest China: A case study of the Wudongde Hydropower Station on the Jinsha River
FAN Qixiang1, 2, SHI Cheng3, 4, CHEN Daoxiang3, LI Guo2, WANG Jiliang5, GU Gongkai1, MU Rongfeng6, LIU Ke6, LIN Peng3*
(1. China Three Gorges Corporation, Wuhan, Hubei 430010, China; 2. China Huaneng Group Co., Ltd., Beijing 100031, China;
3. Department of Hydraulic Engineering, Tsinghua University, Beijing 100084, China; 4. Sichuan Energy Internet Research
Institute, Tsinghua University, Chengdu, Sichuan 610213, China; 5. Three Gorges Geotechnical Consultants Co.,
Ltd.(Wuhan), Wuhan, Hubei 430074, China; 6. China Three Gorges Construction Engineering (Group) Co., Ltd.,
Chengdu, Sichuan 610000, China)
Copyright © 2005-2015 Edited and Published by Editorial Office for Chinese Journal of Rock Mechanics and Engineering
Sponsored by : Chinese Society for Rock Mechanics and Engineering 
Published by : Science Press 
Address: Wuhan 430071, China  Tel: (027)87199250  Fax: (027)87199250  Email: rock@whrsm.ac.cn
DESIGNED BY: Beijing Magtech Science & Technolgy Development Co.,Ltd.
鄂公网安备 42010602003581号