| Stress and deformation of self-anchored reinforcement structures for landslide tunnels |
| YIN Jing1,DENG Ronggui1,LI Kaitian1,CHEN Bajin1,SUN Chunping2 |
| (1. School of Civil Engineering,Southwest Jiaotong University,Chengdu,Sichuan 610031,China;2. China Construction Underground Space Co.,Ltd.,Chengdu,Sichuan 610081,China) |
|
|
|
|
Abstract The self-anchored strengthening structure was put forward to solve the reinforcement issue of tunnels located in the deep landslide,in this paper,stress and deformation of the entire reinforcing structure under the interaction of landslide soil were studied. A physical and mechanical calculation model was established and the matrix transfer method was adopted to establish the calculation formulas of internal force and deformation. The internal force and displacement distribution characteristics of the reinforced structure were obtained by MTLAB programming calculation. Numerical simulation calculation and model test were carried out to verify the theoretical results. The results indicate that:(1) The anti-slide sustaining pile and anchor can control the displacement of the tunnel well and improve the stress state of the tunnel;(2) In the design, the angle between the anchor cable and horizontal plane should be minimized,and the design anchor force values in the scope of the landslide boundary should be increased;(3) The internal force and deformation results of numerical simulation calculation and physical model test are in good agreement with the theoretical calculation results,which verify the correctness of the theoretical calculation method.
|
|
|
|
|
|
[1] 伍 林,郑忠勤,丁 杨. 内昆线冷家坡2号隧道进口段山体变形的综合整治[J]. 路基工程,1999,(6):50–52.(WU Lin,ZHENG Zhongqin,DING Yang. Deformation comprehensive improvement of Lengjiapo No. 2 tunnel entrance slope[J]. Subgrade Engineering,1999,(6):50–52.(in Chinese))
[2] 任立志. 龙洞湾隧道进口病害及其处理[J]. 世界隧道,2000,(3):50–53.(REN Lizhi. Cause of Disease and Treatment Measures for the Portal of Longdongwan Tunnel[J]. World Tunnel,2000,(3):50–53.(in Chinese))
[3] 汪晓峰,黄绍槟. 四川西–攀高速公路山神庙隧道进口滑坡综合治理[J]. 中国地质灾害与防治学报,2007,18(4):15–18.(WANG Xiaofeng,HUANG Shaobin. Comprehensive restraint works of landslide hazard at Shanshenmiao tunnel entrance on Xichang-Panzhihua Expressway in Sichuan Province[J]. The Chinese Journal of Geological Hazard and Control,2007,18(4):15–18.(in Chinese))
[4] 杨小刚,彭家贵,龚熙维,等. 叙大铁路佘家坡隧道洞口滑坡综合治理[J]. 路基工程,2012,(5):183–186.(YANG Xiaogang,PENG Jiagui,GONG Xiwei,et al. Comprehensive treatment on landslide at the entrance of Shejiapo Tunnelon Xuyong—Gulin railway[J]. Subgrade Engineering,2012,(5):183–186.(in Chinese))
[5] 范建海,张 涛,郭 刚,等. 李师关隧道洞口滑坡发生机理与防治措施研究[J]. 地下空间与工程学报,2006,2(8):1 443–1 450. (FAN Jianhai,ZHANG Tao,GUO Gang,et al. Study on the landslide mechanism and treatments at the portal of Lishiguan tunnel[J]. Chinese Journal of Underground Space and Engineering,2006,2(8):1 443–1 450.(in Chinese))
[6] 刘 海,沈军辉,魏 伟,等. 穿越古滑坡川主寺隧道施工地质问题及整治措施[J]. 工程地质学报,2012,20(4):540–546.(LIU Hai,SHEN Junhui,WEI Wei,et al. Geological problems and treatment measures for highway tunnel through ancient landslide[J]. Journal of Engineering Geology,2012,20(4):540–546.(in Chinese))
[7] 曲学兵. 任胡岭隧道进口山体滑坡的治理[J]. 岩土工程界,2003,6(10):62–64.(QU Xuebing. Control of hill landslides at the inlet of the Renhuling tunnel[J]. Geotechnical Engineering World,2003,6(10):62–64.(in Chinese))
[8] 张 鸿,方 华. 北晨亭隧道洞口山体滑坡及初支裂缝综合治理研究[J]. 中外公路,2008,28(6):159–163.(ZHANG Hong,FANG Hua. Study of landslide and its comprehensive governance of Beichenting tunnel entrance[J]. Journal of China and Foreign Highway,2008,28(6):159–163.(in Chinese))
[9] 陈金城. 古田隧道山体滑坡整治技术[J]. 铁道标准设计,2005,(7):92–94.(CHEN Jincheng.Treatment for Mountain Landslide of Gutian Tunnel[J]. Railway Standard Design,2005,(7):92–94.(in Chinese))
[10] 陶志平,周德培. 滑坡地段隧道变形的地质力学模型及工程防治措施[J]. 铁道工程学报,2006,(1):61–66.(TAO Zhiping,ZHOU Depei. The geological mechanics models of tunnel deformation at landslide site and engineering controlling measure[J]. Journal of railway engineering society,2006,(1):61–66.(in Chinese))
[11] 陶志平,周德培. 用抗滑桩整治滑坡地段隧道变形的模型试验研究[J]. 岩石力学与工程学报,2004,23(3):457–460.(TAO Zhiping,ZHOU Depei. Model testing research on controlling tunnel deformation in landslide field with anti-slide piles[J]. Chinese Journal of Rock Mechanics and Engineering,2004,23(3):457–460.(in Chinese))
[12] 李 彬. 偏压隧道病害特征及其控制措施[J]. 铁道科学与工程学报,2011,8(6):59–63.(LI Bin. Study on disease characteristics of unsymmetrical pressure tunnel and its control measures[J]. Journal of railway science and engineering,2011,8(6):59–63.(in Chinese))
[13] 吴红刚,杨 涛,马惠民,等. 隧道–滑坡体系的预加固机制及模型试验研究[J]. 岩石力学与工程学报,2014,33(增2):3 531– 3 538.(WU Honggang,YANG Tao,MA Huimin,et al. Research of pre-reinforcement mechanism and model test of tunnel-landslide system[J]. Chinese Journal of Rock Mechanics and Engineering,2014,33(Supp.2):3 531–3 538.(in Chinese))
[14] 邓荣贵,尹 静,钟志彬,等. 滑坡区隧道自锚式新型加固结构理论研究[J]. 岩石力学与工程学报,2015,34(7):3 531–3 538. (DENG Ronggui,YIN Jing,et al. Theory research of the self- anchored new type reinforcement structure for the landslide tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,2015,34(7):3 531–3 538.(in Chinese))
[15] 刘庆潭,倪国荣. 弹性地基梁的传递矩阵法求解[J]. 长沙铁道学院学报,1992,10(2):92–102.(LIU Qingtan,NI Guorong. The solution to transfer matrix of beam on elastic foundation[J]. Journal of Changsha Railway University,1992,10(2):92–102.(in Chinese))
[16] LEE J W,LEE J Y. Free vibration analysis using the transfer-matrix method on a tapered beam[J]. Computers and Structures,2016,164:75–82.
[17] LEE J W,LEE J Y. Development of a transfer matrix method to obtain exact solutions for the dynamic characteristics of a twisted uniform beam[J]. International Journal of Mechanical Sciences. 2016,105:215–226.
[18] 尹 静,邓荣贵,钟志彬,等. 横穿滑坡变形区隧道受力变形规律及影响因素分析[J]. 岩石力学与工程学报,2016(待刊).(YIN Jing,DENG Ronggui,et al. Stress and deformation laws and influence factors analysis of tunnel across the slope deformation zone[J]. Chinese Journal of Rock Mechanics and Engineering,2016(to be Pressed).(in Chinese)) |
|
|
|