[1] |
国家电网公司. 青藏交直流联网工程介绍[EB/OL]. [2011-12-08]. http://www.sgcc.com.cn/xwzx/gsyw/gtgz/qcjzllwgc/bza/12/261314.shtml.(State Grid Corporation of China. A introduction of Qinghai—Tibet DC transmission line interconnection project[EB/OL]. [2011-12-08]. http://www.sgcc.com.cn/xwzx/gsyw/gtgz/qcjzllwgc/bza/12/261314.shtml.(in Chinese))
|
[2] |
俞祁浩,刘厚建,钱进,等. 青藏直流联网工程±500kV输电线路的工程问题分析[J]. 工程地球物理学报,2009,6(6):806-812. (YU Qihao,LIU Houjian,QIAN Jin,et al. Research on frozen engineering of Qinghai—Tibet 500 kVDC power transmissionline[J]. ChineseJournalofEngineeringGeophysics,2009,6(6):806-812.(inChinese))
|
[3] |
马巍,刘端,吴青柏. 青藏铁路冻土路基变形监测与分析[J]. 岩土力学,2008,29(3):572-579.(MA Wei,LIU Duan,WU Qingbai. Monitoring and analysis of embankment deformation in permafrost regions of Qinghai—Tibet railway[J]. Rock and Soil Mechanics,2008,29(3):572-579.(in Chinese))
|
[4] |
吴青柏,刘永智,童长江,等. 高原多年冻土地区公路工程地质研究[J]. 公路,2000,(2):1-4.(WU Qingbai,LIU Yongzhi,TONG Changjiang,et al. Highway engineering geological research in permafrostregions in the Tibetan plateau[J]. Highway,2000,(2):1-4.(in Chinese))
|
[5] |
霍明,陈建兵,朱东鹏,等. 青藏公路多年冻土区预警系统研究[J]. 岩土力学,2010,31(1):331-336.(HUO Ming,CHEN Jianbing,ZHU Dongpeng,et al. Study of early warning on roadbed diseases of Qinghai—Tibet highway in permafrost regions[J]. Rock and Soil Mechanics,2010,31(1):331-336.(in Chinese))
|
[6] |
CHENG GD. A roadbed cooling approach for the construction of Qinghai—Tibet Railway[J]. Cold Regions Science and Technology,2005,42(2):169-176.
|
[7] |
WU QB,LIU YZ,ZHANG JM,et al. A review of recent frozen soil engineering in permafrost regions along Qinghai—Tibet highway,China[J]. Permafrost and Periglacial Processes,2002,13(3):199-205.
|
[8] |
刘厚健,程东幸,俞祁浩,等. 高海拔输电线路的冻土工程问题及对策研究[J]. 工程勘察,2009,(4):32-36.(LIU Houjian,CHEN Dongxing,YU Qihao,et al. Study on permafrost engineering problems and engineering countermeasure of transmission line[J]. GeotechnicalInvestigation and Surveying,2009,(4):32-36.(in Chinese))
|
[9] |
吴青柏,刘永智,童长江,等. 寒区冻土环境与工程环境间的相互作用[J]. 工程地质学报,2000,8(3):281-287.(WU Qingbai,LIU Yongzhi,TONG Changjiang,et al. Interaction between frozen soil environment and engineering environment in cold regions[J]. Journal of Engineering Geology,2000,8(3):281-287.(in Chinese))
|
[10] |
吴青柏,朱元林,刘永智. 人类工程活动下冻土环境变化评价模型[J].中国科学:D辑,2002,32(2):141-148.(WU Qingbai,ZHU Yuanlin,LIU Yongzhi. Evaluating model of frozen soil environment change under engineering actions[J]. Science in China:Series D,2002,32(2):141-148.(in Chinese))
|
[11] |
盛煜,马巍,温智. 青藏铁路高填方路基对下伏多年冻土热状况的影响[J].铁道工程学报,2003,(4):22-25.(SHENG Yu,MA Wei,WEN Zhi. Effect of high embankment on the thermal regime of underlying permafrost in Qinghai—Tibet railway[J]. Journal of Railway Engineering Society,2003,(4):22-25.(in Chinese))
|
[12] |
温智,盛 煜,吴青柏. 青藏铁路路基浅层地表热状态动态监测初步分析[J].岩石力学与工程学报,2003,22(增2):2664-2668. (WEN Zhi,SHENG Yu,WU Qingbai. Dynamic monitoring of thermal state for shallow ground in Qinghai—Tibet railway embankment[J]. Chinese Journal of Rock Mechanics and Engineering,2003,22(Supp. 2):2 664-2 668. (in Chinese))
|
[13] |
于晖,吴青柏,刘永智. 青藏铁路多年冻土区工程长期监测系统[J]. 冰川冻土,2008,30(3):475-481.(YU Hui,WU Qingbai,LIU Yongzhi. The long-term monitoring system on permafrost regions along the Qinghai—Tibet railway[J]. Journal of Glaciology and Geocryology,2008,30(3):475-481.(in Chinese))
|
[14] |
程国栋,吴青柏,马巍. 青藏铁路主动冷却路基的工程效果[J]. 中国科学:E辑,2009,39(1):16-22.(CHENG Guodong,WU Qingbai,MA Wei. The engineering effect of active cooling roadbed of the Qinghai—Tibet railway[J]. Science in China:Series E,2009,39(1):16-22. (in Chinese))
|
[15] |
俞祁浩,程国栋,牛富俊. 自动温控通风路基应用效果分析[J]. 岩石力学与工程学报,2004,23(24):4221-4228.(YU Qihao,CHENG Guodong,NIU Fujun. Effect analysis of auto-temperature-controlled ventilation roadbed[J]. Chinese Journal of Rock Mechanics and Engineering,2004,23(24):4 221-4 228.(in Chinese))
|
[16] |
国家电网公司.青藏联网工程建设重要节点[EB/OL]. [2011-12-08]. http://www.sgcc.com.cn/xwzx/gsyw/gtgz/qcjzllwgc/tpxw/12/261348.shtml.(State Grid Corporation of China. The important construction nodes of Qinghai—Tibet DC Transmission Line InterconnectionProject[EB/OL]. [2011-12-08]. http://www.sgcc.com.cn/xwzx/gsyw/gtgz/qcjzllwgc/tpxw/12/261348.shtml.(in Chinese))
|
[17] |
人民网. 李克强出席青藏直流联网工程投入试运行仪式并会见建设者代表[EB/OL]. [2011-12-10]. http://paper.people.com.cn/rmrb/html/2011-12/10/nw.D110000renmrb_20111210_3-01.htm.(People.com.cn. LI Keqiang attended the Qinghai—Tibet DC Transmission Line InterconnectionProjectcommissioning ceremony and meeting with the constructor representatives[EB/OL]. [2011-12-10].http://paper.people.com.cn/rmrb/html/2011-12/10/nw.D110000renmrb_20111210_3-01.htm.(in Chinese))
|
[18] |
CHENG GD,SUN Z Z,NIU FJ. Application of the roadbed cooling approach in Qinghai—Tibet railway engineering[J]. Cold Regions Science and Technology,2008,53(3):241-258.
|
[19] |
MA W,CHENG GD,WU QB. Construction on permafrost foundations:lessons learned from the Qinghai-Tibetrailroad[J]. Cold Regions Science and Technology,2009,59(1):3-11.
|
[20] |
四川省电力公司. 川电监理负责的青藏线热棒安装完成[EB/OL]. [2011-12-10].http://www.sgcc.com.cn/xwzx/gsyw/gtgz/qcjzllwgc/xwbd/01/261183.shtml.(Sichuan Electric Power Corporation. The installationof heat pipes supervisored by Chuandian supervision corporation in Qinghai—Tibet DC Transmission Line InterconnectionProject has been completed[EB/OL]. [2011-12-10]. http://www.sgcc.com.cn/ xwzx/gsyw/gtgz/qcjzllwgc/xwbd/01/261183.shtml.(in Chinese))
|