参考文献(References):
[1] 樊启祥,林 鹏,蒋 树,等. 金沙江下游大型水电站岩石力学与工程综述[J]. 清华大学学报:自然科学版,2020,60(7):537–556.(FAN Qixiang,LIN Peng,JIANG Shu,et al. Review on the rock mechanics and engineering practice for large hydropower stations along the downstream section of the Jinsha River[J]. Journal of Tsinghua University:Science and Technology,2020,60(7):537–556.(in Chinese))
[2] 樊启祥,王义锋,裴建良,等. 大型水电工程建设岩石力学工程实践[J]. 人民长江,2018,49(16):76–86.(FAN Qixiang,WANG Yifeng,PEI Jianliang,et al. Engineering practice of rock mechanics in large-scale hydropower projects[J]. Yangtze River,2018,49(16):76–86.(in Chinese))
[3] 佘诗刚,林 鹏. 中国岩石工程若干进展与挑战[J]. 岩石力学与工程学报,2014,33(3):433–457.(SHE Shigang,LIN Peng. Some developments and challenging issues in rock engineering field in China[J]. Chinese Journal of Rock Mechanics and Engineering,2014,33(3):433–457.(in Chinese))
[4] 宋胜武,冯学敏,向柏宇,等. 西南水电高陡岩石边坡工程关键技术研究[J]. 岩石力学与工程学报,2011,30(1):1–22.(SONG Shengwu,FENG Xuemin,XIANG Boyu,et al. Research on key technologies for high and steep rock slopes of hydropower engineering in Southwest China[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(1):1–22.(in Chinese))
[5] 中华人民共和国行业标准编写组. SL 386—2007 水利水电工程边坡设计规范[S]. 北京:中国水利水电出版社,2007.(The Professional Standards Compilation Group of People¢s Republic of China. SL 386—2007 Design code for engineered slopes in water resources and hydropower projects[S]. Beijing:China Water and Power Press,2007.(in Chinese))
[6] 中华人民共和国国家标准编写组. GB 51016—2014 非煤露天矿边坡工程技术规范[S]. 北京:中国计划出版社,2014.(The National Standards Compilation Group of People¢s Republic of China. GB 51016—2014 Technical specification for slope engineering of non-coal open pit mines[S]. Beijing:China Planning Press,2014.(in Chinese))
[7] 张世殊,徐光黎,宋胜武,等. 水电工程环境边坡概念及其工程地质分类[J]. 水力发电,2012,38(8):17–21.(ZHANG Shishu,XU Guangli,SONG Shengwu,et al. Surrounding slope concept and its classification for hydropower engineering[J]. Water Power,2012,38(8):17–21.(in Chinese))
[8] PAN Y Y,ZHENG D,LI S J,et al. Study of the influence of rock layer dip angles on the evolutionary characteristics and failure mechanism of deep-seated toppling deformation in high and steep slopes[J]. Engineering Failure Analysis,2025,180:109828.
[9] SHI J,LIN P,ZHOU Y D,et al. Reinforcement analysis of toe blocks and anchor cables at the Xiluodu super-high arch dam[J]. Rock Mechanics and Rock Engineering,2018,51(8):2 533–2 554.
[10] FAN Q X,ZHU H B,CHEN X C. Key issues in rock mechanics of the Three Gorges Project in China[J]. Journal of Rock Mechanics and Geotechnical Engineering,2011,3(4):329–342.
[11] 樊启祥,石 城,林 鹏,等. 乌东德水电站左岸尾水出口薄层顺向陡倾边坡变形分析与处理[J]. 岩石力学与工程学报,2025,44(1):16–29.(FAN Qixiang,SHI Cheng,LIN Peng,et al. Deformation analysis and treatment of the steeply dipping and bedding slope with thin layers at left bank tailwater outlet of Wudongde hydropower station[J]. Chinese Journal of Rock Mechanics and Engineering,2025,44(1):16–29.(in Chinese))
[12] 樊启祥,魏鹏程,林 鹏,等. 三峡船闸北线二闸首南坡开挖与加固研究[J]. 岩石力学与工程学报,2020,39(增1):2 703–2 712. (FAN Qixiang,WEI Pengcheng,LIN Peng,et al. Study on excavating and reinforcement stability on the south slope of the north gate head of the Three Gorges ship lock[J]. Chinese Journal of Rock Mechanics and Engineering,2020,39(Supp.1):2 703–2 712.(in Chinese))
[13] LIN P,LIU X L,HU S Y,et al. Large deformation analysis of a high steep slope relating to the Laxiwa reservoir,China[J]. Rock Mechanics and Rock Engineering,2016,49(6):2 253–2 276.
[14] LIN P,SHI J,ZHOU W,et al. 3D geomechanical model tests on asymmetric reinforcement and overall stability relating to the Jinping I super-high arch dam[J]. International Journal of Rock Mechanics and Mining Sciences,2018,102:28–41.
[15] 张世殊,冉从彦,裴向军. 环境边坡危岩体勘察[M]. 北京:中国水利水电出版社,2014:72–168.(ZHANG Shishu,RAN Congyan,PEI Xiangjun. Survey of dangerous rock body in environmental slope[M]. Beijing:China Water and Power Press,2014:72–168.(in Chinese))
[16] 王汉辉,丁 刚,王吉亮,等. 水电工程特高陡环境边坡高效防治关键技术[J]. 中国农村水利水电,2023,(5):199–205.(WANG Hanhui,DING Gang,WANG Jiliang,et al. Key Technologies for efficient prevention and control of ultra-high and steep environmental slopes in hydropower projects[J]. China Rural Water and Hydropower,2023,(5):199–205.(in Chinese))
[17] 宋胜武. 汶川大地震工程震害调查分析与研究[M]. 北京:科学出版社,2009:465–469.(SONG Shengwu. Analysis and investigation on seismic damages of projects subjected to Wenchuan earthquake[M]. Beijing:Science Press,2009:465–469.(in Chinese))
[18] 王吉亮,杨 静,陈又华,等. 复杂层状高陡岩质边坡变形与稳定性研究[J]. 水利学报,2015,46(12):1 414–1 422.(WANG Jiliang,YANG Jing,CHEN Youhua,et al. Study on deformation and stability of complex layered high and steep rock slope[J]. Journal of Hydraulic Engineering,2015,46(12):1 414–1 422.(in Chinese))
[19] 陈 滔,邓建辉,李林芮,等. 强烈松弛岩质边坡变形特征与稳定性评价[J]. 岩石力学与工程学报,2015,34(增1):2 607–2 616. (CHEN Tao,DENG Jianhui,LI Linrui,et al. Deformation characteristics and stability evaluation of a heavily loosened rock slope[J]. Chinese Journal of Rock Mechanics and Engineering,2015,34(Supp.1):2 607–2 616.(in Chinese))
[20] 黄 达,黄润秋,周江平,等. 雅砻江锦屏一级水电站坝区右岸高位边坡危岩体稳定性研究[J]. 岩石力学与工程学报,2007,26(1):175–181.(HUANG Da,HUANG Runqiu,ZHOU Jiangping,et al. Study on stability evaluation of unstable rock masses on right bank high altitude slope in the first stage Jinping hydropower station[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(1):175–181.(in Chinese))
[21] 樊启祥,杨宗立,彭吉银,等. 乌东德水电站建设岩石力学工程问题科技创新的思考[J]. 水电与新能源,2020,34(7):1–7.(FAN Qixiang,YANG Zongli,PENG Jiyin,et al. Scientific and technological innovation of rock mechanics engineering in Wudongde Hydropower Station[J]. Hydropower and New Energy,2020,34(7):1–7.(in Chinese))
[22] 李 滨,张 青,王文沛,等. 金沙江乌东德水电站坝区高陡边坡地质灾害监测预警研究[J]. 地质力学学报,2020,26(4):556–564.(LI Bing,ZHANG Qing,WANG Wenpei,et al. Geohazard monitoring and risk management of high-steep slope in the Wudongde dam area[J]. Journal of Geomechanics,2020,26(4):556–564.(in Chinese))
[23] 中华人民共和国国家标准编写组. GB/T 50927—2013 大中型水电工程建设风险管理规范[S]. 北京:中国计划出版社,2013.(The National Standards Compilation Group of People¢s Republic of China. GB/T 50927—2013 Code for risk management of large and medium scale hydropower projects[S]. Beijing:China Planning Press,2013.(in Chinese))
[24] 张存慧,袁桂兰,刘权庆,等. 金沙江乌东德水电站右岸地下电站进水口边坡专题报告[R]. 武汉:长江勘测规划设计研究有限责任公司,2014.(ZHANG Cunhui,YUAN Guilan,LIU Quanqing,et al. Special report on the intake slope of the right bank underground powerhouse of Wudongde hydropower station in Jinsha River[R]. Wuhan:Changjiang Survey Planning Design Limited Liability Company,2014.(in Chinese))
[25] 张雨霆,吴勇进,丁秀丽,等. 金沙江乌东德水电站右岸地下电站进水口边坡岩体稳定性分析[R]. 武汉:长江科学院水利部岩土力学与工程重点实验室,2015.(ZHANG Yuting,WU Yongjin,DING Xiuli,et al. Analysis of rock mass stability at the intake slope of the right bank underground powerhouse of Wudongde hydropower station in Jinsha River[R]. Wuhan:Key Laboratory of Geotechnical Mechanics and Engineering of Ministry of Water Resources,2015.(in Chinese))
[26] 中国三峡建设管理有限公司. 大型水电工程项目管理流程与表格[M]. 北京:中国三峡出版传媒有限公司,2015:3–11.(China Three Gorges Construction Management Co.,Ltd. Large-scale hydropower project management processes and tables[M]. Beijing:China Three Gorges Publishing and Media Corporation,2015:3–11.(in Chinese))