PRACTICE AND DECISION STUDY OF BUILDING SUPER-HIGH BENCH DUMPING-SITE
Cao Yang1, Li Jianghua1, Yan Ronggui1,2, Liu Wenyu3, Zheng Tai4
(1College of Resources,Environment and Engineering,Central South University,Changsha 410083 China) (2Changsha Research Institute of Mining and Metallurgy, Changsha 430012 China) (3Changba Lead-Zinc Mine,Chengxian 742504 China) (4Nanfen Open-Site Mine,Benxi 117600 China)
Abstract:It is an important measurement in decreasing mining-caused land destruction by building super-high bench dumping-site. Foundation loading,stability analysis,mud-rock-flow and water control are key factors in decision making. By the new study,a great scale dumping-site in Qijiagou of Changba,which is 400 m high has been built. Meanwhile,mechanism of foundation loading,technology of determining the limit height of dumping-site,corresponding stability analysis,and a new method of controlling mud-rock flow by controlling small and tiny grains have been developed. The first sluiceway of dumping-site has been built successfully in our country. Afterward,these techniques have been developed widely in Miaoergou dumping-site of Nanfen. Better effects have been obtained. Therefore,this technique can be used widely for reference in other mines.
曹阳黎剑华颜荣贵,刘文钰郑太. 超高台阶排土场建设决策研究与实践[J]. 岩石力学与工程学报, 2002, 21(12): 1858-1862.
Cao Yang1, Li Jianghua1, Yan Ronggui1,2, Liu Wenyu3, Zheng Tai4. PRACTICE AND DECISION STUDY OF BUILDING SUPER-HIGH BENCH DUMPING-SITE. , 2002, 21(12): 1858-1862.