Abstract:The status quo of safety management in China?s underground projects construction was introduced. Based on the accidents statistics,the serious security situation of underground projects construction was certificated. The analysis of types and causes for accidents indicated that the responsibility and subjective reasons are the great challenges for security management. Combining with Hain?s safety pyramid theory,Heinrich?s safety rules and Johnson?s changes-errors model,the concept that accidents can be prevented by risk management measures was established,and some suggestions for accidents prevention were put forward. Besides,the mechanism and control measures for two typical geological hazards,i. e. water and mud outbursts and rockburst,were represented. For the study of water and mud outbursts,the laws of occurrence and development,the precursory information theory,the geological prediction methods and other incident countermeasures were introduced. For the control measures of rockburst,the definition and classification of rockbursts,the prevention mechanism,theoretical basis and engineering practice for monitoring and prediction,as well as the construction measures,were introduced. Some opinions and suggestions on technical methods and management tools were put forward for the accident prevention for underground projects construction.
[1] 中华人民共和国住房和城乡建设部. 2011年房屋市政工程生产安全事故情况通报[OL]. 2012–02–27[2012–05–23]. http://www. mohurd.gov.cn/zxydt/201203/t20120314_209111.html.(Ministry of Housing and Urban-rural Development of the People?s Republic of China. 2011 housing municipal engineering production safety accident report[OL]. 2012–02–27[2012–05–23]. http://www. mohurd.gov.cn/zxydt/201203/t20120314_209111.html.(in Chinese))
[2] 管理科学著名定律连载. NO.39 海恩法则[J]. 施工企业管理,2010,(3):70.(Well-known Law of Management Science. 39-Hain?s safety pyramid theory[J]. Construction Enterprise Management,2010,(3):70.(in Chinese))
[3] 湖北沪蓉西高速公路建设指挥部. 高风险岩溶隧道地质灾害控制关键技术研究[R]. 武汉:湖北沪蓉西高速公路建设指挥部,2009.(Hubei Hu-Rong-Xi Expressway Construction Headquarters. The research of geological disaster control in high risk karst tunnel[R]. Wuhan:Hubei Hu-Rong-Xi Expressway Construction Headquarters,2009.(in Chinese))
[4] 湖北省三峡翻坝高速公路建设指挥部,山东大学. 高风险岩溶隧道不良地质预报与灾害控制研究[R]. 济南:山东大学,2011.(Hubei Three Gorges Fanba Expressway Construction Headquarters,Shandong University. Adverse geological prediction and disaster control in high risk karst tunnel[R]. Jinan:Shandong University,2011.(in Chinese))
[5] 刘 斌,李术才,李树忱,等. 复信号分析技术在地质雷达预报岩溶裂隙水中的应用研究[J]. 岩土力学,2009,30(7):2 191–2 196. (LIU Bin,LI Shucai,LI Shuchen,et al. Study of application of complex signal analysis to predicting karst-fractured ground water with GPR[J]. Rock and Soil Mechanics,2009,30(7):2 191–2 196. (in Chinese))
[6] 张晓春. 煤矿岩爆发生机制研究[博士学位论文][D]. 武汉:华中理工大学,1999.(ZHANG Xiaochun. A study on mechanism of rockburst in coal mines[Ph. D. Thesis][D]. Wuhan:Huazhong University of Science and Technology,1999.(in Chinese))
[7] 王元汉,李卧东,李启光,等. 岩爆预测的“模糊数学”综合评判方法[J]. 岩石力学与工程学报,1998,17(5):493–501.(WANG Yuanhan,LI Wodong,LI Qiguang,et al. Comprehensive method for estimating rockburst with fuzzy mathematics[J]. Chinese Journal of Rock Mechanics and Engineering,1998,17(5):493–501.(in Chinese))
[8] 蔡美峰,王金安,王双红,等. 玲珑金矿深部开采岩体能量分析与岩爆综合预测[J]. 岩石力学与工程学报,2001,20(1):38–42.(CAI Meifeng,WANG Jin?an,WANG Shuanghong,et al. Analysis of energy distribution and prediction of rockburst during deep mining excavation in Linglong gold mine[J]. Chinese Journal of Rock Mechanics and Engineering,2001,20(1):38–42.(in Chinese))
[9] 唐礼忠,王文星. 一种新的岩爆倾向性指标[J]. 岩石力学与工程学报,2002,21(6):874–878.(TANG Lizhong,WANG Wenxing. A new rock burst proneness index[J]. Chinese Journal of Rock Mechanics and Engineering,2002,21(6):874–878.(in Chinese))