[1] ELLIS A V. A review of some environment issues affecting marine mining[J]. Marine Georesources and Geotechnology,2001,19(1):51–63.
[2] 卢 平. 制约胶结充填采矿法发展的若干充填体力学问题[J]. 黄金,1994,15(7):18–22.(LU Ping. A few points about the mechanics of back filling which restrain the development of cementing back- filling method[J]. Gold,1994,15(7):18–22.(in Chinese))
[3] JUNG S J,BISWAS K. Review of current high density paste fill and its technology[J]. Mineral Resources Engineering,2002,11(2):165–182.
[4] 吴东旭,唐 飞. 大红山铜矿全尾砂充填的实验研究[J]. 有色金属设计,2007,(2):7–10.(WU Dongxu. TANG Fei. Experimental study on all tailings flocculation settling in Dahongshan cooper mine[J]. Nonferrous Metals Design,2007,(2):7–10.(in Chinese))
[5] 彭续承. 充填理论及应用[M]. 长沙:中南工业大学出版社,1998:21–32.(PENG Xucheng. Theory and application of filling[M]. Changsha:Central South University Press,1998:21–32.(in Chinese))
[6] 施士虎,杨黎升,李浩宇. 全尾砂充填技术研究与应用[J]. 中国矿山工程,2009,(6):50–52.(SHI Shihu,YANG Lisheng,LI Haoyu. Study and application of full tailings backfilling technique[J]. China Mine Engineering,2009,(6):50–52.(in Chinese))
[7] 刘明泉,贾成梅,李启新. 尾砂充填采矿法的应用和创新[J]. 黄金,1996,(11):26–31.(LU Mingquan,JIA Chengmei,LI Qixin. The application and new ideas of tail filling method[J]. Gold,1996,(11):26–31.(in Chinese))
[8] 郑娟荣,孙恒虎. 矿山充填胶凝材料的研究现状及发展趋势[J]. 有色金属:矿山部分,2000,(6):12–15.(ZHENG Juanrong,SUN Henghu. Mining filling cementations material the present research situation and development trend[J]. Nonferrous Metal:Mining,2000,(6):12–15.(in Chinese))
[9] 谢 鹰. 全尾砂胶结充填工艺及应用前景[J]. 采矿技术,2001,(2):46–47.(XIE Ying. All tailings cemented filling process and application prospect[J]. Mining Technology,2001,(2):46–47.(in Chinese))
[10] 吕宪俊,连民杰. 金属矿山尾矿处理技术进展[J]. 金属矿山,2005,(8):1–4.(LU Xianjun,LIAN Minjie. Progress in tailings disposal technology for metal mines[J]. Metal Mines,2005,(8):1–4.(in Chinese))
[11] 刘同有. 充填采矿技术与应用[M]. 北京:冶金工业出版社,2001:132–148.(LIU Tongyou. Back-filling technology and application[M]. Beijing:China Metallurgical Industry Press,2001:132–148.(in Chinese))
[12] 张钦礼,王新民,古德生. 新桥硫铁矿粉煤灰充填技术研究[J]. 矿业研究与开发,2004,24(增1):76–79.(ZHANG Qinli,WANG Xinmin,GU Desheng. New bridge pyrite fly ash filling technology research[J]. Mining Research and Development,2004,24(Supp.l):76–79.(in Chinese))
[13] 王 樾,张 伟. 矿渣的活性激发剂[J]. 江苏建材,2009,(4):19–22.(WANG Yue,ZHANG Wei. Slag activity inspire agent[J]. Jiangsu Building Materials,2009,(4):19–22.(in Chinese))
[14] 黎良元,石宗利,艾永平. 石膏-矿渣胶凝材料的碱性激发作用[J]. 硅酸盐学报,2008,(3):405–410.(LI Liangyuan,SHI Zongli,AI Yongping. Alkaline activation of gypsum-granulated blast furnace slag cementing materials[J]. Journal of the Chinese Ceramic Society,2008,(3):405–410.(in Chinese))
[15] 杨久俊,毋雪梅,张海涛. 建筑垃圾作矿物掺料对水泥物理力学性能的影响[J]. 粉煤灰,2005,(2):12–14.(YANG Jiujun,WU Xuemei,ZHANG Haitao. Mineral admixtures construction and demolition waste as physical and mechanical properties of the influence of cement[J]. Coal Ash,2005,(2):12–14.(in Chinese))