APPLICATION EXPERIMENT OF WEAK ENERGY BLASTING TECHNOLOGY AT UNDERGROUND TUNNEL ROCK BURST GOVERNANCE
LIU Meishan,WU Xinxia,DING Xiuli,ZHAO Gen,CHEN Linyun
(Key Laboratory of Geotechnical Mechanics and Engineering of Ministry of Water Resources, Yangtze River Scientific Research Institute,Wuhan,Hubei 430010,China)
Abstract:The paper introduced the principle of management of weak energy blasting for rock burst treatment, taken the Jinping hydropower station diversion tunnel as background engineering,the distribution of high stress was simulated by FLAC3D dydropower,the stress release sites were confirmed adopting Russenses rock burst discriminating method,four kinds of stress release blasting scheme were drafted,conducted three groups of blasting test for each scheme,the test results are analyzed. Experiments show that the weak energy blasting can release high ground stress and achieve the goal of controlling rock burst through careful control of the explosion energy. But the method is only to process the stress to the deep rock,do not eliminate stress,so timely supporting measures should be indispensable.
陈清运,邓雄,刘美山,等.采用聚能爆破技术治理岩爆灾害的试验研究[J]. 黄金,2011,(3):29-32.(CHENQingyun,DENGXiong,LIUMeishan,etal.Experimental investigation on solving rock burst problem by assembling energy blasting technique[J]. Gold,2011,(3):29-32.(in Chinese))
[2]
刘美山,杨建,葛文辉,等. 锦屏二级水电站引水隧洞岩爆灾害的工程治理方法研究[J]. 贵州水力发电,2010,24(5):11-15.(LIUMeishan,YANGJian,GEWenhui,etal. Engineering solving means investigation of rock burst calamity in diversion tunnel at Jinping two-stage power station[J]. Guizhou Water Power,2010,24(5):11-15.(in Chinese))
[3]
刘美山,杨建,葛文辉,等. 锦屏二级水电站2#引水隧洞爆破治理岩爆试验研究[J]. 工程爆破,2011,17(2):8-11.(LIUMeishan, YANGJian,GEWenhui,etal. Experimental investigation of solving rock burst by blasting means in diversion tunnel #2 at Jinping two-stage power station[J]. Engineering Blasting,2011,17(2):8-11.(in Chinese))
[4]
王平,刘士恩.解除应力爆破结合柔性支护系统在锦屏电站的应用[J]. 西部探矿工程,2009,(12):151-155.(WANGPing,LIUShien.Application of stress relieve blasting combined with flexible supporting system at Jinping power station[J]. West China Exploration Engineering,2009,(12):151-155.(in Chinese))
[5]
吴建福. 锦屏辅助洞岩爆洞段施工技术措施[J]. 西部探矿工程,2008,(10):199-201.(WUJianfu. Construction technical measures of auxiliary tunnel rock burst sectionat Jinping power station[J]. West China Exploration Engineering,2008,(10):199-201.(in Chinese))
[6]
朱焕春. 锦屏二级辅助洞岩爆控制现场工作总结报告[R]. 成都:二滩水电开发有限主任公司,2008.(ZHUHuanchun. Rock burst control summary report of field work at auxiliary tunnel in Jinping power station[R].Chengdu:ErtanHydropowerDevelopmentCompany,Ltd.,2008.(in Chinese))
[7]
汪洋,王继敏,尹健民,等.基于快速应力释放的深埋隧洞岩爆防治对策研究[J]. 岩土力学,2012,33(2):547-553.(WANGYang,WANGJimin,YINJianmin,et al. Research on prevention measures of rock burst based on rapid stress release in deep tunnel[J]. Rock and Soil Mechanics,2012,33(2):547-553.(in Chinese))
[8]
陈智强,张永兴,周检英. 开挖诱发隧道围岩变形的红外热像试验研究[J]. 岩土工程学报,2012,34(7):1 271-1 277.(CHEN Zhiqiang, ZHANG Yongxing, ZHOU Jianying. Experimental study on infrared photographs of deformation and failure of surrounding rock of tunnels procession induced by excavation[R]. Chinese Journal of Geotechnical Engineering,2012,34(7):1 271-1 277.(in Chinese))