(1. School of Geological Engineering and Geomatics,Changan University,Xian,Shaanxi 710054,China;2. Key Laboratory of Western Chinas Mineral Resources and Geological Engineering,Ministry of Education,Changan University,Xian,Shaanxi 710054,China)
Abstract:Ground fissure is the most typical geological disaster which has endangered the safe use of underground pipes in Xi 'an city. Based on the analysis of the harm on underground pipes induced by ground fissure,full-scale model test was carried out to study the force condition,deformation and failure modes of underground pipeline crossing the active ground fissure. The model test results show that whichever layout mode of underground pipeline is (riding or joint riding across ground fissure),the stress on the pipeline is sophisticated and pipeline is in tension and compression simultaneously. The deformation and failure modes of pipeline can be divided into two kinds that one is reverse bending-elastic foundation beam failure mode,the other is terminal warping-cantilever beam failure mode. The critical value of ground fissure dislocation leading to crack failure of underground pipeline is 6cm. For pipeline riding across ground fissure,cracks mainly appear in the range of 0.5 m from the position of ground fissure at foot wall. As to pipeline with joints riding across ground fissure,cracks mainly appear at the spot with a distance of 1.2 m from ground fissure at the hanging wall. So keeping a certain distance from the ground fissures and reasonable planning should be adopted for the underground pipeline construction in ground fissure developed areas. As for underground pipelines crossing the ground fissures,the necessary countermeasures such as shallow buried pipe ditch,overhead setup,flexible pipes,joint reinforcement,underground corridor and monitoring and early warning etc. should be taken to avoid and prevent the crack failure of pipelines induced by active ground fissure. The conclusions can be presented as the reference to plan of new pipeline network and old network reconstruction in Xian city and also to pipeline engineering construction of other developed areas of ground fissures.
张家明. 西安地裂缝研究[M].西安:西北大学出版社,1990:1-60.(ZHANGJiaming. Research on ground fracturing in the region of Xi¢an[M].Xi¢an:Northwest University Press,1900:1-60.(in Chinese))
[2]
王景明. 地裂缝及其灾害的理论与应用[M].西安:陕西科学技术出版社,2000:389-407.(WANG Jingming. Theory of ground fissures hazards and its application[M]. Xi¢an:Science and Technology Press of Shaanxi,2000:389-407.(in Chinese))
[3]
李永善. 西安地裂缝及渭河盆地活断层研究[M].北京:地震出版社,1992:1-35.(LI Yongshan. Research on ground fissures in xi’an region and active faults in Weihe Basin[M].Beijing:Seismic Press,1992:1-35.(in Chinese))
[4]
黄强兵.地裂缝对地铁隧道的影响机制及病害控制研究[博士学位论文][D].西安:长安大学,2009.(HUANG Qiangbing.Study on effect of the active ground fissure on metro tunnel and its hazards control[Ph. D. Thesis][D]. Xi¢an:Chang¢an University,2009.(in Chinese))
黄强兵,彭建兵,门玉明,等. 地裂缝对地铁明挖整体式衬砌隧道影响机制的模型试验研究[J]. 岩石力学与工程学报,2008,27(11):2324-2331.(HUANG Qiangbing,PENG Jianbing,MEN Yuming,et al. Model test study on effect of ground fissure on open-cut metro tunnel with integral lining[J]. Chinese Journal of Rock Mechanics and Engineering,2008,27(11):2324-2331.(in Chinese))
[7]
毛应生,柳丽英,王德信,等. 西安市地裂对市政构筑物的破坏机制与对策的探讨[J]. 城市道桥与防洪,2002,(2):1-6.(MAO Yingsheng,LIU Liying,WANG Dexin,etal. Approach to mechanism and countermeasure of municipal struc-tures destroyed by ground cracking in Xi¢an city[J]. Urban Roads Bridges andFlood Control,2002,(2):1-6.(in Chinese))
[8]
易学发.西安市地面不均匀沉降及地裂缝成因的讨论[J].地震,1984,(6):50-54.(YI Xuefa. Research on the asymmetry decline ground and the cause of ground fissure in Xi¢an[J].Earthquake,1984,(6):50-54.(in Chinese))
[9]
王庆良,刘玉海,陈志新,等.抽水引起的含水层水平应变——地裂缝活动新机制[J].工程地质学报,2002,10(1):46-50.(WANG Qingliang,LIU Yuhai,CHEN Zhixin,etal. Horizontal strain of aquifer induced by ground water pumping—a new mechanism for ground fissure movement[J].Journal of Engineering Geology,2002,10(1):46-50.(in Chinese))
[10]
刘学峰,邵爱武. 西安地裂缝与地面沉降分析[J].地下水,2008,30(6):124-126.(LIU Xuefeng,SHAO Aiwu.Xi¢an ground fissures and land subsidence analysis[J]. Ground Water,2008,30(6):124-126.(in Chinese))
[11]
中华人民共和国行业标准编写组. DBJ61-6-2006,J10821-2006西安地裂缝场地勘察与工程设计规程[S]. [S.l.]:[s.n.],2006.(The Professional Standards Compilation Group of People¢s Republic of China. DBJ61-6-2006,J10821-2006Specification for site investigation and engineering design on Xi¢an ground fractures[S].[S.l.]:[s.n.],2006.(in Chinese))
[12]
WANG L R L,YEH Y. A refined seismic analysis and design of buried pipeline for fault movement[J].Journal of Earthquake Engineering and Structural Dynamics,1985,13(1):75-96.