[1] |
孙恒虎,赵炳利. 沿空留巷的理论与实践[M]. 北京:煤炭工业出版社,1993:3-13.(SUN Henghu,ZHAO Bingli. Surrounding rock control of entry driven along next goaf[M]. Beijing:China Coal Industry Publishing House,1993:3-13.(in Chinese))
|
[2] |
刘 坤,张晓明,李家卓,等. 薄煤层坚硬顶板工作面沿空留巷技术实践[J]. 煤炭科学技术,2011,39(4):17-20.(LIU Kun,ZHANG Xiaoming,LI Jiazhuo,et al.Practices on gateway retaining along goaf side in thin seam with hard roof[J]. Coal Science and Technology,2011,39(4):17-20.(in Chinese))
|
[3] |
邓月华,唐建新,朱祥可,等. 缓倾斜中厚煤层混凝土沿空留巷工业试验[J]. 西南交通大学学报,2011,46(3):523-528.(DENG Yuehua,TANG Jianxin,ZHU Xiangke,etal. Industrial test of concrete packing for gob-side entry retained in gently-inclined medium-thickness coal seam[J]. Journal of Southwest Jiaotong University,2011,46(3):523-528.(in Chinese))
|
[4] |
华心祝. 我国沿空留巷支护技术发展现状及改进建议[J]. 煤炭科学技术,2006,34(12):78-81.(HUA Xinzhu. Development status and improved proposals on gob-side entry retaining support technology in China[J]. Coal Science and Technology,2006,34(12):78-81.(in Chinese))
|
[5] |
郭育光,柏建彪,侯朝炯. 沿空留巷巷旁充填体主要参数研究[J]. 中国矿业大学学报,1992,21(4):1-11.(GUO Yuguang,BAI Jianbiao,HOU Chaojiong. Study on the main parameters of gateside packs in gateways maintained along gob-edges[J]. Journal of China University of Mining and Technology,1992,21(4):1-11.(in Chinese))
|
[6] |
布铁勇,冯光明,贾凯军. 大采高综采沿空留巷巷旁充填支护技术[J]. 煤炭科学技术,2010,38(11):41-44.(BU Tieyong,FENG Guangming,JIA Kaijun. Gateway side backfilling support technology of goaf side gateway in fully mechanized high cutting longwall mining face[J]. Coal Science and Technology,2010,38(11):41-44.(in Chinese))
|
[7] |
康红普,牛多龙,张 镇,等. 深部沿空留巷围岩变形特征与支护技术[J]. 岩石力学与工程学报,2010,29(10):1 977-1 987.(KANG Hongpu,NIU Duolong,ZHANG Zhen,et al. Deformation characteristics of surrounding rock and supporting technology of gob-side entry retaining in deep coal mine[J]. Chinese Journal of Rock Mechanics and Engineering,2010,29(10):1977-1987.(in Chinese)
|
[8] |
陈 勇,柏建彪,王襄禹,等. 沿空留巷巷内支护技术研究与应用[J]. 煤炭学报,2012,37(6):903-910.(CHEN Yong,BAI Jianbiao,WANG Xiangyu,et al. Support technology research and application inside roadway of gob-side entry retaining[J]. Journal of China Coal Society,2012,37(6):903-910.(in Chinese))
|
[9] |
马立强,张东升,陈 涛,等. 综放巷内充填原位沿空留巷充填体支护阻力研究[J]. 岩石力学与工程学报,2007,26(3):544-550. (MA Liqiang,ZHANG Dongsheng,CHEN Tao,et al. Study on packing body supporting resistance of enter-in packing for in-situ gob-side entry retaining in fully-mechanized top-coal caving mining face[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(3):544-550.(in Chinese))
|
[10] |
谢文兵,笪建原,冯光明. 综放沿空留巷围岩控制机理[J]. 中南大学学报:自然科学版,2004,35(4):657-661.(XIE Wenbing,DA Jianyuan,FENG Guangming. Mechanism of controlling surrounding rock around gob-side entry retaining in top-coal caving mining face[J]. Journalof Central South University:Science and Technology,2004,35(4):657-661.(in Chinese))
|
[11] |
ZHANG Z Z,BAI J B,CHEN Y,et al. An innovative approach for gob-side entry retaining in highly gassy fully-mechanized longwall top-coal caving[J]. International Journal of Rock Mechanics and Mining Sciences,2015,80(1):1-11.
|
[12] |
侯朝炯,易宏伟,柏建彪,等. 高水灰渣速凝材料巷旁充填沿空留巷的试验研究[J]. 煤炭科学技术,1995,23(2):2-5.(HOU Chaojiong,YI Hongwei,BAI Jianbiao,et al. High moisture quick setting ash material for mine roadway backfill[J]. Coal Science and Technology,1995,23(2):2-5.(in Chinese))
|
[13] |
唐建新,胡 海,涂兴东,等. 普通混凝土巷旁充填沿空留巷试验[J]. 煤炭学报,2010,35(9):1 425-1 429.(TANG Jianxin,HU Hai,TUXingdong,et al. Experimental on roadside packing gob-side entry retaining for ordinary concrete[J]. Journal of China Coal Society,2010,35(9):1425-1429.(in Chinese))
|
[14] |
柏建彪,周华强,侯朝炯,等. 沿空留巷巷旁支护技术的发展[J]. 中国矿业大学学报,2004,33(2):183-186.(BAI Jianbiao,ZHOU Huaqiang,HOU Chaojiong,et al. Development of support technology beside roadway in goaf-side entry retaining for next sublevel[J]. Journal of China University of Mining and Technology,2004,33(2):183-186.(in Chinese))
|
[15] |
黄艳利,张吉雄,张 强,等. 综合机械化固体充填采煤原位沿空留巷技术[J]. 煤炭学报,2011,36(10):1 624-1 628.(HUANG Yanli,ZHANG Jixiong,ZHANG Qiang,et al. Technology of gob-side entry retaining on its original position in fully-mechanized coalface with solid material backfilling[J]. Journal of China Coal Society,2011,36(10):1624-1628.(in Chinese))
|
[16] |
王茂盛,王 萌,都海龙. 厚层坚硬顶板工作面沿空留巷技术[J]. 煤炭科学技术,2013,41(6):42-45.(WANG Maosheng,WANG Meng,DU Hailong. Gateway retained technology along goaf of coalmining face with thick and hard roof[J]. Coal Science and Technology,2013,41(6):42-45.(in Chinese))
|
[17] |
宁建国,马鹏飞,刘学生,等. 坚硬顶板沿空留巷巷旁“让-抗”支护机理[J]. 采矿与安全工程学报,2013,30(3):369-374.(NING Jianguo,MA Pengfei,LIU Xuesheng,et al. Supporting mechanism of“yielding-supporting”beside roadway maintained along the goaf under hard rocks[J]. Journal of Mining and Safety Engineering,2013,30(3):369-374.(in Chinese))
|
[18] |
郝福坤,周同学,姜玉超. 人工强制放顶沿空留巷技术及其应用[J]. 煤炭科学技术,2006,34(2):16-18.(HAO Fukun,ZHOU Tongxue,JIANG Yuchao. Forced roof caving technology and application to goaf-side entry retaining[J].Coal Science and Technology,2006,34(2):16-18.(in Chinese))
|
[19] |
高 魁,刘泽功,刘 健,等. 深孔爆破在深井坚硬复合顶板沿空留巷强制放顶中的应用[J]. 岩石力学与工程学报,2013,32(8): 1 588-1 594.(GAO Kui,LIU Zegong,LIU Jian,et al. Application of deep borehole blasting to gob-side entry retaining forced roof caving in hard and compound roof deep well[J]. Chinese Journal of Rock Mechanics and Engineering,2013,32(8):1588-1594.(in Chinese))
|
[20] |
WANG F T,TU S H,YUANG Y,et al. Deep-hole pre-split blasting mechanism and its application for controlled roof caving in shallow depth seams[J]. International Journal of Rock Mechanics and Mining Sciences,2013,64(1):112-121.
|
[21] |
HUANG BX,LIU CY,FU J H,et al. Hydraulic fracturing after water pressure control blasting for increased fracturing[J]. International Journal of Rock Mechanics and Mining Sciences,2011,48(6):976-983.
|
[22] |
刘书梁. 坚硬顶板超前预裂爆破技术在沿空留巷中的应用[J]. 煤矿开采,2013,18(2):79-81.(LIU Shuliang. Application of pre-splitting blasting hard roof in retaining roadway along gob[J]. Coal Mining Technology,2013,18(2):79-81.(in Chinese))
|
[23] |
刘 洋,石平五. 长壁留煤柱支撑法开采存在的问题[J]. 煤炭学报,2007,32(6):565-569.(LIU Yang,SHI Pingwu. Existing problem on longwall remaining coal pillars supporting mining[J]. Journal of China Coal Society,2007,32(6):565-569.(in Chinese))
|
[24] |
张志呈. 爆破基础理论与设计施工技术[M]. 重庆:重庆大学出版社,1994:76-78.(ZHANG Zhicheng. Basic theory and design construction technology for blasting[M]. Chongqing:Chongqing University Press,1994:76-78.(in Chinese))
|
[25] |
LIUW B,YANG JH,CHEN M,et al. An equivalent method for blasting vibration simulation[J]. Simulation Modelling Practice and Theory,2011,19(9):2050-2062.
|
[26] |
MA GW,AN XM. Numerical simulation of blasting-induced rock fractures[J]. International Journal of Rock Mechanics and Mining Sciences,2008,45(6):966-975.
|