TESTING ON FORMATION AND EVOLUTION OF TBM EXCAVATION DAMAGED ZONE IN DEEP-BURIED TUNNEL BASED ON DIGITAL PANORAMIC BOREHOLE CAMERA TECHNIQUE
LI Shaojun1,FENG Xiating1,ZHANG Chunsheng2,LI Zhanhai3,ZHOU Hui1, HOU Jing2,CHU Weijiang2
(1. State Key Laboratory of Geomechanics and Geotechinical Engineering,Institute of Rock and Soil Mechanics,Chinese Academy of Sciences,Wuhan,Hubei 430071,China;2. East China Investigation and Design Institution Under CHECC,Hangzhou,Zhejiang 310014,China;3. School of Resources and Civil Engineering,Northeastern University,Shenyang,Liaoning 110004,China)
Abstract:It presents the in-situ test on excavation damaged zone(EDZ) evolution of TBM tunnel No.3 in Jinping II hydropower station using digital panoramic borehole camera. Firstly,through the pre-excavated diversion tunnel No.2–1,several boreholes vertical to sidewall of TBM tunnel No.3 are drilled for digital camera,and a series of digital images of borehole wall are obtained during the whole TBM driven time. Afterwards,the images will be digitally processed;geological structural surface and fractures of surrounding rock mass are also analyzed,which makes it possible for the whole procedure of cracks formation,development and close to be obtained. Finally,the depth of damage zone is recognized;the relationship between fractures evolution and TBM construction progress is given;and the mechanism of EDZ evolution is discussed as well. It will not only provide the direct data for geological exploration but also contribute greatly to support design and analysis of deformation behaviors of deep-buried tunnels.
李邵军,冯夏庭,张春生,李占海,周辉,侯靖,褚卫江. 深埋隧洞TBM开挖损伤区形成与演化过程的数字钻孔摄像观测与分析[J]. 岩石力学与工程学报, 2010, 29(06): 1106-1112.
LI Shaojun1,FENG Xiating1,ZHANG Chunsheng2,LI Zhanhai3,ZHOU Hui1, HOU Jing2,CHU Weijiang2. TESTING ON FORMATION AND EVOLUTION OF TBM EXCAVATION DAMAGED ZONE IN DEEP-BURIED TUNNEL BASED ON DIGITAL PANORAMIC BOREHOLE CAMERA TECHNIQUE . , 2010, 29(06): 1106-1112.