STUDY OF CONTACT PRESSURE BETWEEN PRIMARY LINING AND SECONDARY LINING FOR TUNNELS OF PASSENGER DEDICATED LINES
FANG Qian1,2,ZHANG Dingli1,WONG Louis Ngai Yuen2,LI Pengfei1,CHEN Tielin1
(1. Tunnel and Underground Engineering Research Center of Ministry of Education,Beijing Jiaotong University,Beijing 100044,China;2. School of Civil and Environmental Engineering,Nanyang Technological University,639798,Singapore)
Abstract:To systematically study the mechanical properties of the secondary lining for tunnels of the passenger dedicated lines(PDL),in-site monitoring is used to measure the contact pressures between the primary lining and the secondary lining for some typical tunnels of different Lines,such as Guiguang Line,Lanyu Line and Jinghu Line. According to the research,the contact pressure reaches its maximum value at the moment when the tunnel lining trolley is removed. The load acting on secondary lining is the actual deformation pressure,which is totally different from the loose pressure prescribed in Chinese tunnel criteria. The safety factor for secondary lining under the measured load is higher than that under the criteria load and satisfies the safety requirements. It is therefore possible for the primary lining to sustain the entire surrounding rock pressure with the help of necessary auxiliary method and suitable installation time. The result given in this research enhances our understanding towards the mechanical characteristics of secondary lining for the PDL tunnel and it will be helpful for secondary lining design.
房 倩1,2,张顶立1,王毅远2,李鹏飞1,陈铁林1. 高速铁路隧道初支、二衬间接触压力研究[J]. 岩石力学与工程学报, 2011, 30(S2): 3377-3385.
FANG Qian1,2,ZHANG Dingli1,WONG Louis Ngai Yuen2,LI Pengfei1,CHEN Tielin1. STUDY OF CONTACT PRESSURE BETWEEN PRIMARY LINING AND SECONDARY LINING FOR TUNNELS OF PASSENGER DEDICATED LINES. , 2011, 30(S2): 3377-3385.
[1] 王梦恕. 地下工程浅埋暗挖技术通论[M]. 合肥:安徽教育出版社,2004:74–85.(WANG Mengshu. The overview of shallow tunnel construction method[M]. Anhui:Anhui Education Press,2004:74–85.(in Chinese))
[2] RABCEWICZ L,GOLSER J. Principles of dimensioning the supporting system for the New Austrian Tunnelling Method[J]. Water Power,1973,25(3):88–93.
[3] BROWN E T. Putting the NATM into perspective[J]. Tunnels and Tunnelling,1981,13 (10):13–17.
[4] MURPHY P,DEANE T. Twenty-five years of NATM:a UK perspective[J]. Tunnels and Tunnelling,1994,26 (5):61–64.
[5] 刘新荣,孙 辉,陈晓江,等. 黄土连拱隧道二次衬砌的结构分析与监测研究[J]. 岩土工程学报,2005,27(6):695–697.(LIU Xinrong,SUN Hui,CHEN Xiaojiang,et al. Structural analysis and monitoring for secondary lining of doubled arch tunnel in loess[J]. Chinese Journal of Geotechnical Engineering,2005,27(6):695–697.(in Chinese))
[6] 李鹏飞,张顶立,赵 勇,等. 大断面黄土隧道二次衬砌受力特性
研究[J]. 岩石力学与工程学报,2010,29(8):1 690–1 696.(LI Pengfei,ZHANG Dingli,ZHAO Yong,et al. Study of mechanical characteristics of secondary lining of large-section loess tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,2010,29(8):1 690–1 696.(in Chinese))
[7] 刘志春,李文江,朱永全,等. 软岩大变形隧道二次衬砌施作时机探讨[J]. 岩石力学与工程学报,2008,27(3):580–588.(LIU Zhichu,LI Wenjiang,ZHU Yongquan,et al. Research on construction time of secondary lining in soft rock of large-deformation tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,2008,27(3):580–588.(in Chinese))
[8] 陈建勋,李建安. 公路隧道二次衬砌厚度的优化[J]. 交通运输工程学报,2006,6(3):68–72.(CHEN Jianxun,LI Jian?an. Secondary lining thickness optimization of road tunnel[J]. Journal of Traffic and Transportation Engineering,2006,6(3):68–72.(in Chinese))
[9] 张 剑. 谈当前铁路隧道设计的倾向[J]. 铁道标准设计,2008,(8):91–93.(ZHANG Jian. Research on the tendency of the current design of the railway tunnel[J]. Railway Standard Design,2008,(8):91–93.(in Chinese))
[10] 中华人民共和国行业标准编写组. TB10003—2005铁路隧道设计规范[S]. 北京:中国铁道出版社,2005.(The Professional Standards Compilation Group of People?s Republic of China. TB10003—2005 Code for design on tunnel of railway[S]. Beijing:China Railway Publishing House,2005.(in Chinese))