CHARACTERISTICS OF SURROUNDING ROCK DEFORMATION AND REINFORCEMENT TECHNOLOGY OF RETAINED ENTRY IN WORKING FACE WITH MULTI-ENTRY LAYOUT
KANG Hongpu1,2,YAN Lixin1,2,GUO Xiangping1,2,ZHANG Zhantao1,2,GAO Fuqiang1,2
(1. Coal Mining and Designing Branch,China Coal Research Institute,Beijing 100013,China;2. Coal Mining and Designing Department,Tiandi Science and Technology Co.,Ltd.,Beijing 100013,China)
Abstract:Based on the entries retained for next working face in the multi-entry system in Jincheng mining district,and a large quantity of monitoring data collected in these entries,the characteristics and mechanisms of deformation and damage associated with these entries are analyzed. Numerical simulation code FLAC3D is utilized to analyze the effects of entry layout pattern,coal pillar size,and face width on the deformation and damage of the entries retained for next face;and the stress distribution around the entries and faces are calculated. The reinforcement patterns and parameters suitable for entries retained for next face are proposed based on above researches. Underground tests are carried out;the surrounding rock displacements,rock bolt and cable loads are monitored during the whole service period of the entries retained;and the reinforcement performance is evaluated. The research results show:when the entry retained is originally affected by the front abutment stress of the current face,the surrounding rock displacement increases moderately;when the current working face advances past the entry retained for a certain distance,the surrounding rock displacement increases sharply;the peak of displacement velocity appears when the working face is 50–200 m away;and then the displacement is tending towards stability;when the entry retained is affected by the front abutment stress of the next face,the surrounding rock displacement increases evidently again. The deformation of the entries retained is closely connected with entry layout patterns,coal pillar size and the parameters of working faces. The rock bolts and cables with high pretension and intensive strength,and the cable bolting set in full entry section are fit for the entries retained,which can reduce surrounding rock displacements greatly and keep the entries stable for a long time. Finally,the existing faults are also addressed and some improvement suggestions are provided.
康红普1,2,颜立新1,2,郭相平1,2,张占涛1,2,高富强1,2. 回采工作面多巷布置留巷围岩变形特征与支护技术[J]. 岩石力学与工程学报, 2012, 31(10): 2022-2036.
KANG Hongpu1,2,YAN Lixin1,2,GUO Xiangping1,2,ZHANG Zhantao1,2,GAO Fuqiang1,2. CHARACTERISTICS OF SURROUNDING ROCK DEFORMATION AND REINFORCEMENT TECHNOLOGY OF RETAINED ENTRY IN WORKING FACE WITH MULTI-ENTRY LAYOUT. , 2012, 31(10): 2022-2036.
[1] 杜计平,孟宪锐. 采矿学[M]. 徐州:中国矿业大学出版社,2009:89–104.(DU Jiping,MENG Xianrui. Mining[M]. Xuzhou:China University of Mining and Technology Press,2009:89–104.(in Chinese))
[2] PENG S S. 长壁开采[M]. 郭文兵译. 北京:科学出版社,2011:65–91.(PENG S S. Longwall mining[M]. Translated by GUO Wenbing. Beijing:Science Press,2011:65–91.(in Chinese))
[3] MARK C. The evolution of intelligent coal pillar design:1981— 2006[C]// Proceedings of the 25th International Conference on Ground Control in Mining. Morgantown,West Virginia,USA:[s.n.],2006:325–334.
[4] DU X Z,LU J, MORSY K. Coal pillar design formulae review and analysis[C]// Proceedings of the 27th International Conference on Ground Control in Mining. Morgantown,West Virginia,USA:[s.n.],2008:254–261.
[5] 王 安. 现代化亿吨矿区生产技术[M]. 北京:煤炭工业出版社,2005:152–160.(WANG An. Modern coal mining technology for mining district with production of a hundred million tons[M]. Beijing:China Coal Industry Publishing House,2005:152–160.(in Chinese))
[6] 徐玉胜. 大采高工作面巷道布置方式[J]. 煤矿开采,2009,14(3):19–22.(XU Yusheng. Roadway layout manner for mining face with large mining height[J]. Coal Mining Technology,2009,14(3):19–22.(in Chinese))
[7] 魏 东. 特厚煤层分层综放开采护巷煤柱稳定性及支护技术研究[博士学位论文][D]. 北京:煤炭科学研究总院,2011.(WEI Dong. Study on stability of coal pillar and reinforcement technology for entries in slice top coal caving mining in extra thick coal seams[Ph. D. Thesis][D]. Beijing:China Coal Research Institute,2011.(in Chinese))
[8] 董文敏. 高瓦斯矿大采高工作面区段煤柱尺寸合理确定[J]. 煤炭科学技术,2007,35(12):67–70.(DONG Wenmin. Rational determination of sectional coal size for fully mechanized coal mining face with high cutting height in high gassy mine[J]. Coal Science and Technology,2007,35(12):67–70.(in Chinese))
[9] 王传团,张绍敏. 回采巷道合理煤柱尺寸的确定[J]. 煤矿开采,2002,7(4):49–51.(WANG Chuantuan,ZHANG Shaomin. Confirmation of reasonable pillar?s size in actual mining roadways[J]. Coal Mining Technology,2002,7(4):49–51.(in Chinese))
[10] 王永革,肖辉赞. 大采高工作面区段煤柱合理尺寸的数值模拟[J]. 辽宁工程技术大学学报:自然科学版,2011,30(5):645–648. (WANG Yongge,XIAO Huizan. Numerical simulation on reasonable size of section coal pillar in the face of big mining height[J]. Journal of Liaoning Technical University:Natural Science,2011,30(5):645–648.(in Chinese))
[11] 王德璋,李俊杰. 动压巷道矿压显现规律及支护技术[J]. 煤炭科学技术,2011,39(4):40–43.(WANG Dezhang,LI Junjie. Mine strata pressure behavior law and support technology of mine dynamic gateway[J]. Coal Science and Technology,2011,39(4):40–43.(in Chinese))
[12] 康红普,王金华,林 健. 高预应力强力支护系统及其在深部巷道中的应用[J]. 煤炭学报,2007,32(12):1 233–1 238.(KANG Hongpu,WANG Jinhua,LIN Jian. High pretensioned stress and intensive bolting system and its application to deep roadways[J]. Journal of China Coal Society,2007,32(12):1 233–1 238.(in Chinese))
[13] 康红普,王金华,林 健. 煤矿巷道锚杆支护应用实例分析[J]. 岩石力学与工程学报,2010,29(4):649–664.(KANG Hongpu, WANG Jinhua,LIN Jian. Case studies of rock bolting in coal mine roadways[J]. Chinese Journal of Rock Mechanics and Engineering, 2010,29(4):649–664.(in Chinese))
[14] KANG H P,WU Y Z,GAO F Q. Deformation characteristics and reinforcement technology for entry subjected to mining-induced stresses[J]. Journal of Rock Mechanics and Geotechnical Engineering, 2011,3(3):207–219.
[15] 吴拥政. 强动压下回采巷道高预紧力强力锚杆支护技术[J]. 煤炭科学技术,2010,38(3):12–14,48.(WU Yongzheng. High pre-tension powerful bolt support technology for mining gateway under high mining-induced pressure[J]. Coal Science and Technology,2010,38(3):12–14,48.(in Chinese))
[16] 颜立新,赵 军. 多次动压影响巷道支护技术及护巷煤柱留设[J]. 煤矿开采,2009,14(1):60–63.(YAN Lixin,ZHAO Jun. Roadway supporting technology influenced by mining and protective pillar design[J]. Coal Mining Technology,2009,14(1):60–63.(in Chinese))
[17] 赵建国. 赵庄煤矿受采动影响巷道支护设计[J]. 煤矿开采,2011,16(2):59–62.(ZHAO Jianguo. Research on supporting technology of roadway influenced by mining in Zhaozhuang colliery[J]. Coal Mining Technology,2011,16(2):59–62.(in Chinese))
[18] 康红普,姜铁明,张 晓,等. 晋城矿区地应力场研究及应用[J]. 岩石力学与工程学报,2009,28(1):1–8.(KANG Hongpu,JIANG Tieming,ZHANG Xiao,et al. Research on in-situ stress field in Jincheng mining area and its application[J]. Chinese Journal of Rock Mechanics and Engineering,2009,28(1):1–8.(in Chinese))