PRE-REINFORCEMENT AND CONSTRUCTION OF TUNNEL IN DRY FINE SAND LAYERS
ZHU Zhengguo1,2,SUN Xingliang1,2
(1. School of Civil Engineering,Shijiazhuang Tiedao University,Shijiazhuang,Hebei 050043,China;
2. Key Laboratory of Roads and Railway Engineering Safety Control of Ministry of Education,Shijiazhuang Tiedao University,Shijiazhuang,Hebei 050043,China)
Abstract:Shangbai large cross-section tunnel in Datong-Xi?an Passenger Dedicated Lines passes through dry fine sand layers. Its construction technologies are difficult and risky. Through the comparative field experiments of close-packed small pipe and deep secant pile of pre-reinforcement,it is found that the deep secant pile pre-reinforcement scheme can effectively control the quick sand and sand gushing during the tunnel excavation. Meanwhile the physico-mechanical parameters of the fine sand layers and consolidation body are obtained by deep secant pile test through laboratory tests,including direct shear tests,triaxial tests and unconfined compression tests. On this basis,through the numerical simulation and field test of tunnel excavation method in dry fine sand layers,the reasonable construction scheme is proposed. The results can provide technical support for Shangbai tunnel construction and reference for similar projects.
朱正国1,2,孙星亮1,2. 干燥粉细砂隧道超前预加固与施工研究[J]. 岩石力学与工程学报, 2013, 32(9): 1909-1916.
ZHU Zhengguo1,2,SUN Xingliang1,2. PRE-REINFORCEMENT AND CONSTRUCTION OF TUNNEL IN DRY FINE SAND LAYERS. , 2013, 32(9): 1909-1916.
肖昌军,王晓刚. 超前小导管注浆技术在北京地铁10号线劲松站粉细砂地层加固中的应用[J]. 铁道标准设计,2008,(12):231-233.(XIAO Changjun,WANG Xiaogang. Application of grouting technology with advanced small ducts in reinforcement of Jinsong station at powder sand stratum in Beijing Metro #10 line[J]. Railway Standard Design,2008,(12):231-233.(in Chinese))